Forwards Insp Rept 50-270/74-04 on 740516-17 & 0604-07. Violations Noted
ML19308A602
Person / Time
Site: Oconee  
Issue date: 07/17/1974
From: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Thies A
DUKE POWER CO.
Shared Package
ML19308A603 List:
References
NUDOCS 7911270594
Download: ML19308A602 (3)


See also: IR 05000270/1974004

Text

.

.

.

.

.

.

'IL'

U:w.'ZC STATES

.s t7-

ATOMIC ENERGY COMMISSICc4

^

Q,N[,'D );,. '

D U6" M. E r- "-'; S.iTG7 npr./ TICL.;

.

..

f

7jg

ue x ,. n

w r e uia

\\q;q y

g

2 > m ;. m.

w e. t

.e..t-

ema r -u e

, , , , , , , ., . . , u .. . a

.

a r m . .. , s . r , e. c o . =

  • a r a

p

s

In Reply Refer To:

JUL 171974

RO:II:FJ

50-270/74-4

'

Duke Power Company

ATTN:

Mr. A. C. Thies, Senior Vice President

Production and Transmission

Power Building

422 South Church Street

Charlotte, North Carolina

28242

Gentlemen:

This refers to the inspection conducted by Mr. F. Jape of this office on

May 16 and 17 and June 4-7, 1974, of activities authorized by AEC

Operating License No. DPR-47 for the Oconee 2 facility, and to the

discussion of our findings held by Mr. Jape with Mr. J. E. Smith at

the conclusien of the inspection.

Areas examined during the inspection and our findings are discussed

in the enclosed inspection report.

Within these areas, the inspection

consisted of selective exa=ination of procedures and representative

records, interviews with personnel, and observations by the inspector.

l

The results of our followup of previously identified natters are contained

in the enclosed report as follows:

a.

The results of our inspection of your corrective action on previously

identified violations are discussed in Section II of the su= mary of

the enclosed report as follows:

b.

The status of unresolved items identified in previous inspection

reports is discussed in Section IV of the surnary of the cnclosed

report.

New unresolved items are identified in Section III of the summary of

the enclosed report.

.

During the inspection, it was found that certain activities under your

license appear to be in violation of AEC requirements.

The violations

and references to pertinent requirements are listed in Section I of

.

%

-

m

-

.

.

,

',

  • '

. .

. ,-

-

'

Duke Power Comapny

-2-

JUL 171974

the summary of the enclosed report.

No response is requested o'f items

I. A.1.b. , c. , d. , e. , and f. , since these iters were previously reported

to Region 11 as abnormal occurrences and an unusual event.

This notice is sent to you pursuant to the provisions of Section 2.201

of the AEC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations.

Section 2.201 requires you to submit to this office,

within 20 days of your receipt of this notice, a written statement

or explanation in reply including:

(17 corrective steps which have

been taken by you, and the results achieved; (2) corrective steps

which will be taken to avoid further violations; and (3) the date

when full compliance will be achieved.

An evaluation has been completed of the pressurizer motor operated

relief valve. We have no further questions on this meter and consider

the item resolved. Verbal notification of our findings regarding the

relief valve was transmitted to Mr. K. S. Canady on June 13, 1974.

In accordance with Section 2.790 of the AEC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the AEC's Public Documen~

Room.

If this report contains any infor=ation that you believe to be

proprietary, it is necessary that you submit a written application to

this of fice requesting that such information be withheld from public

disclosure.

If no proprietary information is identified, a written

statement to that ef fect should be submitted.

If an application is

submitted, it must fully identify the bases for which information is

claimed to be proprietary. The application should be prepared so that

information sought to be withheld is incorporated in a separate paper

and referenced in the application since the application will be placed

in the Public Decument Reom. Your application, or written statement,

should be submitted to us within 20 days.

If we are not contacted as

specified, the enclosed report and this letter may then be placed in the

Public Document Room.

Should you have any questions concerning this letter, we will be glad

to discuss them with you.

We appreciate your cooperation with us.

Very.truly yours

'

s

,

f

,,. ch

'

^

Norman C. Moseley

Director

Enclosure:

.

R0 Inspection Report No.

50-270/74-4

'

'

-

.

d'

'

,

e

,

Ltr to Duke Power Company fm N.

C. Moseley

dtd

JUL 171974

.

DISTRIBUTION:

H.

D.

Thornburg, RO

RO:HQ (4)

Directorate of Licensing (4)

DR Central File h

  • PDR

w.

  • NSIC
  • State
  • To be dispatched at a later date

.

p

e

.

.

.

a

.

.

  • A

JUL 171974

Duke Power Company

Oconee 2

RO Inspection Report No. 50-270/74-4

cc w/ encl:

~

H.

D.

Thornburg, RO

RO:HQ (5)

,_j

DR Central File

s

Regulatory Standards (3)

Directorate of Licensing (13)

cc encl. only:

  • PDR
  • NSIC
  • State
  • To be dispatched at a later date

.

go =

N

9