O 800s20o549 TENNESSEE VALLEY AUTHORITY DIVISION OF NUCLEAR PJWER SEQUOYAll NUCLEAR PLANT

?!0NTHLY OPERATING REPORT APRIL 1, 1980 - APRIL 30, 1980 DOCKET NUl!BER 50-327 LICENSE NUMBER DPR-77 Submitted By:

Plant Superintendent i

l l

TABLE OF CONTENTS Operations Summary . . . . . . . . . . . , , , , , , , , , , , , , , , , 3 Significant Operational Events . . . . . . . - - . . . . . . . . . . . . .2 Average Daily Unit Power Level . . . . . - - - - - . . . . . . . . . . . .3 Operating Data Report .. . . . . - - - - - . . . . . . . . . . . . . . .4 Unit Shutdown and Power Reduction . . . . . . . . . . . . . . . . . . . .5 Plant Ifaintenance Summary . . . . . . - - - - - . . . . . . . . . . . . .6 Outage flaintenance Si'mmary . . . . . . . . . . . . . . . . . . . . . .7 1

1

~

Operations Summary April 1980 The following summary describes the significant operational activities during the reporting period. In support of this summary, a chronological log of significant events is included in this report.

There were sixteen Licensee Event Reports submitted to the NRC during the month of April.

One fuel assembly, H-6, failed the RCCA drag test and the RCCA was replaced. After replacement, the RCCA drag test was satisfactory.

1

Significant Operational Events Date Event 4/08/80 Fuel assembly H-6 passed RCCA drag test af ter RCCA was changed out.

4/21/80 RCS pressure at 325 psi.

4/26/80 Reactor coolant system heated up to 180 F.

2

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-327

!! NIT I DATE 5-7-80 CON 1PLETED BY Frank M. Walker TELEPl!ONE (615)842-029d Nf0 N Ill April 1980 l

DAY AVER AG'E DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL

(.glwe Net) l OlWe Net)

I

' 0 g7 0 2 0 g3 0

3. .

O j9 0 4 0 20 0 5 0 21 0 6 0 0 22 7 0 0 23 8 0 0 24 9 0 25 0 10 0 2c, O 0 0 11 2.,

12 0 ,3 0 13 0 0 29 14 0 0 3g 0 0 l 15 _ 3 1 (, 0 INSTRUCll0NS On this format,!:st the avera<g e daily unit power lesel in N1We Net for each day in the reporting inonth. O .apute to the nearest whole megawatt.

(9/77)

I 3 t

--- v e a - -w----

4 l

OPERATING DATA REPORT .

DOCKET NO. 50-327 DATE 5-7-80 COSIPLETED BY prnnk M-_ Walker -

TELEPil0.NE (A10 W -0295 OPEllATING STATUS

1. Unit Name: Ronunvnh 1 Notes
2. Reporting Period:! ___ , April 1980
3. Licensed Thermal l'ower (51Wt): 170*
4. Nameplate Rating (Gross 51We): 1220,5
5. Design Electrical Rating (Net SIWE): 1148 _.
6. Slaximum Depend 5ble Capacity (Gross alwe): 1185
7. Staximum Dependable Capacity (Net alWe): 1148
8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted,if Any (Net 51We):
10. Reasons For Restrictions.If Any:

This 51onth Yr.-to.Da t e Cumulative ,

i1. Ilours In Reporting Period 720 1464 1464  ?

12. Number Of Ilours Reactor Was critical 0 0 0
13. Reactor Reserve Shutdown flours 0 0- 0-
14. Ilours Generator On Line 0 0 0
15. Unit Reserve Shutdown llours 0 0 0 .
16. Gross Thermal Energy Generated (51Wil) 0 0 0 "
17. Gross Electrical Energy Generated (.\lWil)- 0___. 0 0
18. Net Electrical Energy Generated (alWil) 0 0 '0
19. Unit Senice Factor N/A N/A- N/A
20. Unit Asailability Factor' N/A N/A N/A
21. Unit Capacity Factor (Using 51DC Net) N/A N/A' N/A -
22. Unit Capacity Factor (Using DER Net) N/A N/A N/A
23. Unit Forced Outage Rate N/A N/A -N/A.
24. Shutdowns Scheduk;d Over Next 6 Slonths (Type, Date.and buration of Each): .I

.1

25. If Shut Down At End Of Report Periot . Estimated Date of Startup: '
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achiesed L

. t

'lkITIA L CRITICALITY 'May 21. 1980 I dNI.I'IA L ELECTRICITY ' July 6. 1980 '1 CONI 5lERCIA L OPER ATION  : August 18, 1980

-l

  • Low Power Physics : Testing License Issued t -

(9/77)

{i.

141

Plant Maintenance Summary No major maintenance was performed on CSSC equipment during the month of April.

6

Outage Maintenance Summary During April, the inspection and reassembly of the main turbine was completed.

The installation of reactor intervals and reactor pressure vessel head was completed.

Completed the replacement of the control rod drive upper guide tube support pins.

7

n

- o s

9 r 5 -

e 9 - -

1 h 2 G P 0 E

- c - R 7 0 M 2 U 2 h 8 4 3 a - 8 - N(

- v8 A e e e l 0 o - ) s si e 5 u 5 n 5 n ta nF rc c h 1 ioa e c) u S

e o 6

( e e te DiR L S o

J v c nf r or E i

n L e tc e t

s nfo( m O.EEYE e g rr Ino tis r t a N MTBN r S g

u a t

o r e r

A AD O l og c e p -

T N D Ei E

Cg je R Gah t pSR e I t

K I E ET T P &g g t i e b r y

)

i b

CN L L eAn s e ipr h r tn1 h i

e6 OU P E u s x o tnv1 D MT C a e r EfEE0 S O P C 4 5 S

N .

O in I

T '), n . ar )n i ci a C 0 _5'gQ'5o aSl U 8 r

c iep x D 9 St u( E E 1 :l a l a R n r R l do uu nntoeh E i to70 h a a ut W r - ; teMMAO O A p = t n' M! 234 P

D l i 3 N T A N S O e =

N M e s

g t

W T n n r e e o O R ch p D O .i [ e n T P L R io U E ta l

i R n S im*

T a

";f4y 5gO I x N o i 1 U E]d )

n e s

)

? ,- ] 3-ia n i n

lp e a x ni t

lp E . x ioI E i= $

r (t

e e s tc& (

r r ig luT f r

tsin ro) iao e ner n F e RivEi i

i la

_r]E tnn c yT a t r

lap nx ea g ror r mnnt oi nt ioE t

=1. ]5 s

(

pt el eliat ai ar ninu ur r e s

o luif gemeh t a e e ;d p1 3 _

7,

  • aEMRR0AO0 e - bCDEFGi - - - - - 1 RAI C _

I _

J U _

d _

d leu _

ed

' l rc he o c F S )

o.  : : 7

,h FS 7

/

I 9(

r s

u