8005280 30'S
')
l
~
.~
May 14, 1980 Trojan Nuclear Plant Docke t' 50-344 License NPF-1 License Change Application 59, Revision 1 Director of Nuclear Reactor Regulation ATTN:
Mr. Robert A. Clark, Chief Operating Reactors Branch No. 3 Division of Operating Reactors U. S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear Sir:
Attached is Revision 1 to License Change Application 59.
Revision 1 consists of new Technical Specifications 3.3.3.8, Limiting Conditions for Operation, and 4.3.3.8, Surveillance Requirements, and deletes the previous request for modification of License Condition 2.C.(8).
A fee of $4,000 for a proposed Class III request for amendment was previously submitted on April 14, 1980 with the original License Change Application.
Additionally, our letter of April 14, 1980 responded to your letters of March 25 and March 18 concerning Trojan fire protection modifications.
Item 3 of that letter should be disregarded.
PGE has determined at this j
time to proceed with the alternate or remote shutdown system (decouple switches) required by License Condition 2.C.(8) and the NRC's SER of March 22, 1978.
The topical report, PGE-1012, Trojan Nuclear Plant Fire Protection Review, will be revised to reflect the "as-built" status of the decouple switches af ter their installation.
In accordance with NRC criteria clarified by a telephone discussion with members of your staff on May 7,1980, single failure criteria is not assumed for the
t D.t!.Ed']F Ei E:~IOCCG TJ hr4 M ert A. Clark
!L y 1.i, IMO Pa.. /
installation of the decouple switches.
Although proposed Technical Specifications 3.3.3.8 and 4.3.3.8 were not submitted 90 days prior to expected implementation, we hope that your prompt attention will allow approval prior to our startup tentatively scheduled for June 21, 1980.
Sincerely, L-C. Goodwin, Jr.
Assistant Vice President Thermal Plant Operation and Maintenance CG/CAZ/4sa10A12 2
Attachment c:
Mr. Lynn Frank, Director State of Oregon Department of Energy t
p-ee
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of
)
)
PORTLAND GENERAL ELECTRIC COMPANY, )
Docket 50-344 THE CITY OF EUGENE, OREGON, AND
)
Operating License NPF-1 PACIFIC POWER & LIGHT COMPANY
)
)
(TROJAN NUCLEAR PLANT)
)
CERTIFICATE OF SERVICE I hereby certify that copies of Revision 1 to License Change Applica-tion 59 to the Operating License for Trojan Nuclear Plant, dated May 14, 1980 have been served on the following by hand delivery or by deposit in the United States mail, first class, this 14th day of May 1980.
Mr. Lynn Frank, Director State of Oregon Department of Energy Labor & Industries Bldg., Room 111 Salem, Oregon 97310 Mr. Robert M. Hunt Chairman of County Commissioners Columbia County Courthouse St. Helens, Oregon 97051 kl$
/
J. W. Lentsch, Manager Generation Licensing & Analysis Subscribed and sworn to before me this 14th day of May 1980.
LA lw Notary Public of Gy6gon My Commiss'.on Expires:
b _ f[/[M 9
sa/4mg6.136