ML19305D899

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-413/80-02 & 50-414/80-02 on 800212-14.No Noncompliance Noted
ML19305D899
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 03/12/1980
From: Bryant J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19305D898 List:
References
NUDOCS 8004160118
Download: ML19305D899 (2)


See also: IR 05000413/1980002

Text

,

.

.

.

'

.

opanto

<

'o

UNITED STATES

3

g

NUCLEAR REGULATORY COMMISSION

$

- E

REGION il

.

mo

101 MARIETTA ST

N.W.. SUITE 3100

o

ATLANTA, GEORGIA 3o303

MAR 121980

In Reply Refer To:

RII:NE

50-413/80-02

50-414/80-02

Duke Power Company

ATTN:

W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

Charlotte, NC 28242

Gentlemen:

.

This refers to the inspection conducted by N. Economos of this office on

Februa ry 12-14, 1980 of activities authorized by NRC Construction Permit Nos.

CPPR-116 and CPPR-117 for the Catawba Nuclear Station facility, and to the

discussion of our findings held with D. G. Beam at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were disclosed.

Two new unresolved items resulted from this inspection and are discussed in the

enclosed report. These items will be examined during subsequent inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

.

it is claimed that the information is proprietary, and should be prepared so

,-

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

9

.

, e

4

,

8004160[%

s,

t

C

.

.

Duke Power Company

-2-

MAR 121980

.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

f

'

<

J. C. Bryant, Acting Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

Inspection Report Nos. 50-413/80-02

and 50-414/80-02

.

cc w/ enc 1:

J. W. Hampton, Station Manager

P. O. Box 392

Clover, SC 29710

.

D. G. Beam, Project Manager

P. O. Box 223

Clover, SC 27910

l

.

l

.

$

' 3 e** a

-

.

e@

t

if

4

,

r.

$

8,

t

._

._

._..._J_-.

-

- - --