Forwards IE Insp Repts 50-327/80-04 & 50-328/80-03 on 800205-07.No Noncompliance Noted
ML19305D884
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 02/27/1980
From: Bryant J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19305D885 List:
References
NUDOCS 8004160066
Download: ML19305D884 (2)


See also: IR 05000327/1980004

Text

r

(

,

'

+f**Cu

& .3 m

o

UNITED STATES

g

8'

NUCLEAR REGULATORY COMMISSION

~

o

'

$

E

REGION 11

o

101 MARIETTA ST., N.W.. SulTE 3100

. . . . . p*

ATLANTA, G EORGIA 30303

FEB 2 71980

In Reply Refer To:

RII:MJG

50-327/80-04

50-328/80-03

Tennessee Valley Authority

ATTN:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

-

This refers to the inspection conducted by M. J. Gouge of this office on

February 5-7, 1980 of activities authorized by NRC Construction Permit Nos.

CPPR-72 and CPPR-73 for the Sequoyah Nuclear Plant facility, and to the

discussion of our findings held with G. G. Stack at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

. C.

ant, Acting Chief

Reactor Construction and

i

Engineering Support Branch

.

Enclosures:

(See Page 2)

8 004100 Od

F

.

Tennessee Valley Authority

-2-

'

FEB 2 71980

Enclosures:

Inspection Report Nos. 50-327/80-04

and 50-328/80-03

cc w/ enc 1:

G. G. Stack, Project Manager

P. O. Box 2000

Daisy, TN 37319

J. M. Ballentine

Plant Superintendent

P. O. Box 2000

Dairy, TN 37319

J. F. Cox

,

400 Commerce Street

W10C131 C-K

Knoxville, TN 37902

D. L. Lambert, Project Engineer

400 Chestnut Street Tower II

Chattanooga, TN 37401

T. B. Northern

Construction Engineer

Post Office Box 2000

Spring City, TN 37381

E. G. Beasley

Tennessee Valley Authority

309 Grant's Building

Knoxville, TN 37902

.