Docket No. 50-293 fir. Paul J. !icGuire Station Manager Boston Edison Company Pilgrim Nuclear Power Station RFD #1, Rocky Hill Road Plymouth, Massachusetts 02360
Dear Mr. Paul McGuire:
We have reviewed your Siculator Retraining Program, submitted for our approval with BECo letter #79-169, dated August 28, 1979. This revision incorporates changes to the requalification program. Specifically, this change fulfills the portion of your requalification program under item
=IV - On The Job Training, concerning simulator programs should they be required. He approve your progran as submitted. However, additional changes may be required at a later date because of the reviews of the operator training programs that are being conducted at the present time by the f!RC.
The operator requalification program, as modified, continues to meet the requirements of paragraph 50.54 (i-1) of 10 CFR Part 50 and Appendix A to 10 CFR Part 55 and is approved.
Sir.ce rely,
l
/
g Paul F. Collins, Chief Operator Licensing Branch Division of Project fianagement cc: Anthony Z. Roisman, Esquire Roisman, Kessler and Cashdan 1025 15th Street, N. W., 5th Floor Washington, D. C.