ML19305D442
| ML19305D442 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 01/17/1980 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML19305D430 | List: |
| References | |
| NUDOCS 8004150079 | |
| Download: ML19305D442 (2) | |
See also: IR 05000321/1979037
Text
F
__
.
.
p n LE:t
4'
o
UNITED STATES
l'
~ , ,
NUCLEAR REGULATORY COMMISSION
$
,3
r[E
o
,'
REGION 11
0,
101 MARIETTA ST., N.W.. SUITE 3100
',.....[
ATLANTA, GEORGIA 30303
JAN 171979
In Reply Refer To:
RII:RFRIII
50-321/79-37
56-366/79-41
Georgia Power Company
ATTN:
J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street
Atlanta, GA 30303
Gentlemen:
This refers to the inspection conducted by R. F. Rogers of this office on
November 10 - December 7, 1979, of activities authorized by NRC Operating
License No. DPR-57 and License No. NPF-5 for the Hatch facility, and to the
discussion of our findings held with M. Manry at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is
discussed in the enclosed report.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with NRC requirements. This item and references
to pertinent requirements are listed in the Notice of Violation enclosed here-
with as Appendix A.
This notice is sent to you pursuant to the provisions of
Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations. Section 2.201 requires you to submit to this office, within 20
days of your receipt of this notice, a written statement or explanation in reply
including:
(1) corrective steps which have been taken by you and the results
[
achieved; (2) corrective steps which will be taken to avoid further noncom-
pliance; and (3) the date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
l
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
l
that proprietary information identified in the application is contained in a
separate part of the document. If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
6 0 04150p -
..
.
.
e
.
Georgia Power Company
-2-
,
.
Should you have any questions concerning this letter, ue will be glad to
,
discuss them with you.
Sincerely,
bh
R. C. Lewis, Acting Chief
Reactor Operations and Nuclear
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-321/79-37
and 50-366/79-41
cc w/ enc 1:
M. Manry, Plant Manager
P. O. Box 442
Baxley, GA 31513
C. E. Belflower
Site QA Supervisor
P. O. Box 442
Baxley, GA 31513
W. A. Widner, General Manager
Nuclear Generation
Georgia Power Company
Post Office Box 4545
Atlanta, Georgia 30303
,
l
>
.