Forwards IE Insp Repts 50-321/80-02 & 50-366/80-02 on 800108-11 & Notice of Deviation
ML19305C564
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 02/08/1980
From: Bryant J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19305C561 List:
References
NUDOCS 8003310086
Download: ML19305C564 (2)


See also: IR 05000321/1980002

Text

.

-

f

pa tro

'o

UNITED STATES

8'

NUCLEAR REGULATORY COMMISSION

~

m

n

n

'C $ ,

3 ,E

'"

REGION 11

0,

g

101 MARIETTA ST

N.W., sulTE 3100

% * * *, e

.

v

o

ATLANTA. GEORGI A 30303

FEB . 81980

In Reply Refer To:

RII:WIIM

50-321/80-02

50-366/80-02

Georgia Power Company

ATTN: J.11. Miller, Jr.

Executive Vice President

270 Peachtree Street

Atlanta, GA 30303

Gentlemen:

.

This refers to the inspection conducted by W.11. Miller, Jr., of this office on

January 8-11, 1980 of activities authorized by NRC Operating Licanse No. DPR-57 and

License No. NPF-5 for the Hatch facility, and to the discussion of our findings

held with M. Manry at the conclusion of the inspection.

c

Areas examined during the inspection and our findings are discussed in the

anclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

Within the scope of this inspection, no items of noncompliance were disclosed.

3

During the inspection it was found that certain activities under your license

appear to deviate from commitments to the Commission and have safety significance.

These items are identified in the Notice of Deviation enclosed herewith as

Appendix A.

Please provide us in writing within 20 days of your receipt of this

letter your comments incl.iding a description of corrective actions that. have

been or will be taken, corrective actions which will be taken to avoid further

deviations, and the date corrective actions were or will be completed.

e

"

In accor6. ' with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Fecieral Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary infor-

mation identified in the application is contained in a separate part of the

j

document. If we do not hear from you in this regard within the specified period,

l

the report will be placed in the Public Document Room.

Boossio 0 %

.

.

.

.

Georgia Power Company

-2-

FEP

819EU

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

'f

7

.

L

j

f5

J. C. Bryant, Acting Chief

Reactor Construction and Engineering

Support Branch

Enclosure:

1.

Appendix A, Notice of Deviation

2.

Inspection Report Nos. 50-321/80-02

and 50-366/80-02

.

cc w/ encl:

M. Manry, Plant Manager

'o

P. O. Box 442

Baxley, GA 31513

C. E. Belflower

Site QA Supervisor

P. O. Box 442

Baxley, GA 31513

W. A. Widner, General Manager

Nuclear Generation

Georgia Power Company

Post Office Box 4545

Atlanta, Georgia 30303

,