Text
.
-
f
pa tro
'o
UNITED STATES
8'
NUCLEAR REGULATORY COMMISSION
~
m
n
n
'C $ ,
3 ,E
'"
REGION 11
0,
g
101 MARIETTA ST
N.W., sulTE 3100
% * * *, e
.
v
o
ATLANTA. GEORGI A 30303
FEB . 81980
In Reply Refer To:
RII:WIIM
50-321/80-02
50-366/80-02
Georgia Power Company
ATTN: J.11. Miller, Jr.
Executive Vice President
270 Peachtree Street
Atlanta, GA 30303
Gentlemen:
.
This refers to the inspection conducted by W.11. Miller, Jr., of this office on
January 8-11, 1980 of activities authorized by NRC Operating Licanse No. DPR-57 and
License No. NPF-5 for the Hatch facility, and to the discussion of our findings
held with M. Manry at the conclusion of the inspection.
c
Areas examined during the inspection and our findings are discussed in the
anclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
Within the scope of this inspection, no items of noncompliance were disclosed.
3
During the inspection it was found that certain activities under your license
appear to deviate from commitments to the Commission and have safety significance.
These items are identified in the Notice of Deviation enclosed herewith as
Appendix A.
Please provide us in writing within 20 days of your receipt of this
letter your comments incl.iding a description of corrective actions that. have
been or will be taken, corrective actions which will be taken to avoid further
deviations, and the date corrective actions were or will be completed.
e
"
In accor6. ' with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Fecieral Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary infor-
mation identified in the application is contained in a separate part of the
j
document. If we do not hear from you in this regard within the specified period,
l
the report will be placed in the Public Document Room.
Boossio 0 %
.
.
.
.
Georgia Power Company
-2-
FEP
819EU
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
'f
7
.
L
j
f5
J. C. Bryant, Acting Chief
Reactor Construction and Engineering
Support Branch
Enclosure:
1.
Appendix A, Notice of Deviation
2.
Inspection Report Nos. 50-321/80-02
and 50-366/80-02
.
cc w/ encl:
M. Manry, Plant Manager
'o
P. O. Box 442
Baxley, GA 31513
C. E. Belflower
Site QA Supervisor
P. O. Box 442
Baxley, GA 31513
W. A. Widner, General Manager
Nuclear Generation
Georgia Power Company
Post Office Box 4545
Atlanta, Georgia 30303
,