6 APPENDIX A NOTICE OF VIOLATION Duke Power Company License No. DPR-38 Oconee Nuclear Station DPR-47 Based on the NRC inspection December 3-5, 1979, certain of your activities were apparently not conducted in full compliance with NRC requirements as indicated below. These items have been categorized as described in correspondence to you dated December 31, 1974.
As required by 10 CFR 50 Appendix "B" Criterion V as implemented by Duke Power Company Topical Report IA Section 17.2.5 and Oconee Technical Speci-fication Section 6.4.1 activities affecting quality shall be prescribed by documented instructions, procedures or drawings...and shall be accomplished in accordance with these instructions procedures or drawings.
(1) Duke Power Company Procedure MP/0/A/3019/01 Paragraph 11.3 Note 3 requires that "Any attachments (extra pipes, cable trays, extra steel, etc.) must be shown on the support restraint design drawing.
Contrary to the above, Hanger Numbers 51A-0-479A-H21C, SIA-0-479A-H18C and 2-53B-2-0-436E-R3 had attachments that were not shown on the surveillance "as-built" design drawings.
(2) Duke Power Company Procedure Specification No. OS-0020.00-00-003 Paragraph 4.4.2 requires that wedge anchors shall have the proper test torque applied tc ensure expansion of the anchor.
Contrary to the above, Hanger 1-07A-400B-DE014 Plate A was found to have three wedge anchors that had been torqued to less than the required test torque value.
This is an infractin-K; ATE!11.TEACETT:3 ERE?!!TH C0:11!.lC2.i0:LIS".:.'.SiO:]