ML19305B041

From kanterella
Jump to navigation Jump to search
Advises That IE Circular 79-25,Suppl a, Shock Arrestor Strut Assembly Interference, Was Sent to Listed Utils on 800131
ML19305B041
Person / Time
Site: Dresden Constellation icon.png
Issue date: 02/14/1980
From: Carroll D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8003190067
Download: ML19305B041 (2)


Text

t-UNITED STATES IlO

?

E" s, -[A NUCLEAR REGULATORY COMMISSION

"/E REGION lli Q

g 799 ROOSEVELT ROAD e

U GLEN ELLYN, ILLINOIS 60137

%....o

+

f b 141980 MEMORANDUM FOR: Those on Attacited List FROM:

Dorothy E. Carroll, Acting Chief, Administrative Branch

SUBJECT:

IE CIRCULAR NO. 79-25 The attached IE Circular No. 79-25, Supplement A, titled." Shock Arrestor Strut Assembly Interference" was sent to the following licensees on January 31, 1980, for information:

American Electric Power Service Corporation Indiana and Michigan Power Company D. C. Cook 1, 2 (50-315, 50-316)

Cincinnati Gas & Flectric Company Zimmer (50-358)

Cleveland Electric Illuminating Company Perry 1, 2 (50-440, 50-441)

Commonwealth Edison Company Braidwood 1, 2 (50-456, 50-457)

Byron 1, 2 (50-454, 50-455)

Dresden 1, 2, 3 (50-10, 50-237, 50-249)

La Salle 1, 2 (50-373, 50-374)

Quad-Cities 1, 2 (50-254, 50-265)

Zion 1, 2 (50-295, 50-304)

Consumers Power Company Big Rock Point (50-155)

Midland 1, 2 (50-329, 50-330)

Palisades (50-255)

~

Dairyland Power Cooperative LACBWR (50-409)

Detroit Edison Company Fermi 2 (50-341)

Illinois Power Company Clinton 1, 2 (50-461, 50-462) 8 003 2 9o ()g

1 kN

  • Those on Attached List

- Iowa Electric Light & Power Company Duane Arnold (50-331)

Northern Indiana Public Service Company Bailly (50-367)

Northern States Power Company Monticello (50-263)

Prairie Island 1, 2 (50-282, 50-306)

Ohio Edison Company Erie 1, 2 (50-580, 50-581)

Public Service of Inditna Marble Hill 1,'2 (50-546, 50-547)

Toledo Edison Company Davis-Besse 1 (50-346)

Union Electric Company Callaway 1, 2 (30-483, 50-486) 4 Wisconsin Electric Power Company Point Beach 1, 2 (50-266, 50-301)

Wisconsin Public Service Corporation Kewaunee (50-305)

/

?

, 4" d L Ld-

.t t

  • it /

DrothyE.Cafr'oll,ActingChief '

Administrative Branch

Enclosure:

IE Circular No. 79-25,1 Supplement A 1

I

(

4

~

1-,

-- r 3

+-,,-r-,

-,e-

+ vt-s-

r

Addressees - Memorandum dated February 6,1980 IF Files MPA/DTS Central Files Reproduction Unit NRC 20b O

  • C SSINS No.:

6830 Accession No.:

UNITED STATES 7912190658 NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 January 31, 1980 IE Circular No. 79-25 Supplement A SH0CK ARREST 0R STRUT ASSEMBLY.NTERFERENCE On December 20, 1979 licensees and holders of construction permits for nuclear power reactors were advised by IE Circular No. 79-25 of a potential problem with Bergen Paterson part 2540 Strut Assembly used in combination with Pacific Scientific Company mechanical shock arrestors sizes 15K, 50K and 120K.

Bergen Paterson nas conducted a detailed review of their records and identified the following nuclear power plants as being affected by the above problem:

Shoreham #1 Three Mlle Island #2 Shearon Harris #1, 2, 3, & 4 Watts Bar #1 Virgil C. Summer #1 Waterford #3 Limmerick #1 & 2 During the course of this investigation Bergen-Paterson identified an additional problem with the 2540-120 Shock Arrestor Strut Assembly.

The assembly may not be acceptable for applications up to the published load of 120,000 lbs.

Preliminary load testing has indicated that the maximum accept-able load may be only 112,000 lbs.

All Nuclear Power Reactor licensees and holders of construction permits are advised to review their systems for any Bergen Paterson part 2540-120 Shock Arrester Strut Assembly.

Application of these assemblies should be analysed, existing calculations reviewed, and if necessary, recalculated to determine whether loads exceed 112,000 lbs.

Strut Assemblies for applications in excess of 112,000 lbs should be replaced by large units or other acceptable resolution should be made.

~

/

i i

i

IE Circular No. 79-25 Supplement A Enclosure January 31, 1980 RECENTLY ISSUED IE CIRCULARS Circular Subject Date of Issued to No.

Issue 80-02 Nuclear Power Plant 2/1/80 All holders of Reactor Staff Work Hours OLs including research and test reactors, and cps 80-01 Service Advice for GE 1/17/80 All licensees of Induction Disc Relays nuclear power reactor operating facilities and holders of nuclear power reactor cps 79-25 Shcok Arrestor Strut 12/20/79 All licensees and Assembly Interference holders of power reactor cps 79-24 Proper Installation and 11/26/79 All Holders of a Calibration of Core Spray Power Reactor OL or Pipe Break Detection CP Equipment on BWRs.

79-23 Motor Starters and 11/26/79 All Power Reactor and Contactors Failed Operating Facilities to Operate and Holders of Reactor cps 79-22 Stroke Times for Power 11/16/79 All Power Reactor Operated Relief Valves Operating Facilities and all Utilities having a CP 79-21 Prevention of Unplanned 10/19/79 All holders of Power Releases of Radioactivity Reactor OLs and cps 79-20 Failure of GTE Sylvania 9/24/79 All holders of Power Relay, Type PM Bulletin Reactor OLs and cps 7305, Catalog SU12-11-AC with a 12V AC Coil 79-19 Loose Locking Devices 9/13/79 All Holders of Power on Ingersoll-Rand Pumps Reactor OLs and cps 79-18 Proper Installation of 9/10/79 All Holders of Power Target Rock Safety-Relief Reactor OLs and cps

__