Forwards IE Bulletin 79-06A,Revision 1, Review of Operational Errors & Sys Misalignments Identified During TMI Incident
ML19305A397
Person / Time
Site: Crane 
Issue date: 04/18/1979
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Herbein J
METROPOLITAN EDISON CO.
References
NUDOCS 7905020275
Download: ML19305A397 (1)


Text

'

f

"'80 UNITED STATES f&

yt,-

  • 9

'~

5mC_~,NUCl. EAR REGULATdRY COMMISSION o

REGION I L-sai Pann AveNuc 0

KING OF PROSSI A, PcNNSYt.VANI A 19404 April 18, 1979 Docket No. 50-289 Metropolitan Edison Company ATTN: Mr. J. G. Herbein Vice President - Generation P. O. Box 542 Reading, Pennsylvania 19640 Gentlemen:

The enclosed Bulletin No.79-06A Revision No.1, is forwarded to you

~

for infonnation.

No written response is required.

If you desire additional information regarding this matter, please contact this office.

Sincerely, oyce

. Grier Director

Enclosures:

IE Bulletin No.79-06A Revision No. I cc w/encls:

E. G. Wallace, Licensing Manager J. J. Barton, Project Manager L. L. Lawyer, Manager - Generating Operations G. P. Miller, Manager - Generating Station - Nuclear J. L. Seelinger, Unit 1 Superintendent W. E. Potts, Unit 1 Superintendent - Technical Support I. R. Finfrock, Jr.

Mr. R. Conrad G. F. Trowbridge, Esquire Miss Mary V. Southard, Chairman, Citizens for a Safe Environment 1

)

79 05 02 0 Z '?f

L

,~

-l:,- :..y UNITED STATES NUCLEAR REGULATORY COMl11SSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 IE Bulletin No.79-06A (Revision No.1)

Date: April 18,1979 Page 1 of 2 REVIEW 0F OPERATIONAL ERRORS AND SYSTEM MISALIGNMENTS IDENTIFIED DURING THE THREE MILE ISLAND INCIDENT

'IE Bulletin 79-06A identified actions to be taken by the licensees of all pressurized water reactors designed by Westinghouse.

Item No. 3 of the actions to be taken, as stated in the original bulletin, was:

"3.

For your facilities that use pressurizer water level coincident with pressurizer pressure for automatic initia-tion of safety injection into the reactor coolant system, trip the low pressurizer level setpoint bistables such that, when the pressurizer pressure reaches the low setpoint, safety injection would be initiated regardless of the pres-surizer level.

In addition, instruct operators to manually initiate safety injection when the pressurizer pressure indication reaches the actuation setpoint whether or not the level indication has dropped to the actuation setpoint."

Infonnation from liwnsees and Westinghouse has identified that implementation of this action would preclude the performance of surveil-lance testing of the pressurizer pressure bistables without initiating a safety injection.

In order to permit surveillance testing of the pressurizer pressure bistables, the low pressurizer level bistables that must operate in coincidence with the low pressurizer pressure bistables may be restored to normal operation for the duration of the surveillance test of that coincident pressurizer pressure channel. At the conclusion of the surveillance test of each pressurizer pressure channel, the coincident pressurizer level channel must be returned to the tripped mode defined in Action Item 3 of IE Bulletin 79-06A.

As a result, Item 3 should be revised as follows: