Forwards IE Insp Rept 50-077/79-03 on 791029-30 & Notice of Violation
ML19296E029
Person / Time
Site: 05000077
Issue date: 12/11/1979
From: Allan J, Allen J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Whang Y
CATHOLIC UNIV. OF AMERICA, WASHINGTON, DC
Shared Package
ML19296E007 List:
References
NUDOCS 8003140076
Download: ML19296E029 (2)


See also: IR 05000077/1979003

Text

i

  • Sn arog

%

UNITED STATES

+

.

.

Eyg

i

NUCLEAR REGULATORY COMMISSION

34

oj

REGION I

0,, A

g

631 PARK AVENUE

% .' .V

,o#

KING OF PRUSSIA, PENNSYLVANI A 19406

...

Docket No. 50-77

g

Catholic University

ATTN:

Dr. Y. C. Whang, Chairman

-

Mechanical Engineering Department

620 Michigan Avenue, N.E.

Washington, D.C.

20064

Gentlemen:

Subject:

Inspection 50-77/79-03

This refers to the inspection conducted by Mr. K. Plumlee of this office on

October 29-30, 1979, of activities authorized by NRC License No. R-31 and to

the discussions of our findings held by Mr. Plumlee with Dr. E. D. Jordan at

the conclusion of the inspection, and to a subsequent telephone discussions

between Mr. Plumlee and Messrs. D. Ebert and W. Keene on November 5, 1979.

Areas examined during this inspection are described in.the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Withia

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, measurements made by the

inspector, and observations by the inspector.

Our inspector also verified the steps you have taken to correct the items of

noncompliance brought to your attention in a letter dated May 19, 1979.

We have

no further questions regarding your action at this time.

In addition, the inspector reported there appears to be some potential for the

inclusion of toluene which is a flammable material in the radioactive waste

being stored in the Nuclear Reactor Lab.

Please review your waste management

procedures and make any changes necessary to assure that toluene will not

inadvertently be stored in the Nuclear Reactor Lab.

Based on the results of this inspection, it appears that certain of your activi-

ties were not conducted in full compliance with NRC requirements, as set forth

in the Notice of "iolation, enclosed herewith as Appendix A.

These items of

noncompliance have been categorized into the levels as described in our corre-

spondence to you dated December 31, 1974.

This notice is sent to you pursuant

to the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to

this office, within twenty (20) days of your receipt of this notice, a written

statement or explanation in reply including:

(1) corrective steps which have

been taken by you and the results achieved; (2) corrective steps which will be

taken to avoid further items of noncompliance; and (3) the date when full com-

pliance will be achieved.

80031([0 07(c,

.

.

.

.

Catholic University

2

GEC 111913

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosures will

be placed in the NRC's Public Document Room.

If this report contains any infor-

mation that you (or your contractor) believe to be proprietary, it is necessary

that you make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must be accompanied

by an affidavit executed by the owner of the information, which identifies the

document or part sought to be withheld, and which contains a statement of reasons

which addresses with specificity the items which will be considered by the

Commission as listed in subparagraph (b) (4) of Section 2.790.

The information

sought to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within the

specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

W@-$ e

"~

mes M. Allan

Deputy Director

Enclosures:

1.

Appendix A, Notice of Violation

2.

Office of Inspection and Enforcement Inspection

Report Number 50-77/79-03

cc w/encls:

Dr. E. D. Jordan, Director of Information Systems and Planning

W. Keene, Radiation Safety Official