ML19296E011

From kanterella
Jump to navigation Jump to search
Forwards IE Info Notice 80-06, Notification of Significant Events. No Action Required
ML19296E011
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 02/27/1980
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hancock J
FLORIDA POWER CORP.
References
NUDOCS 8003140047
Download: ML19296E011 (1)


Text

/

UNITED STATES 8

'o'7 NUCLEAR REGULATORY COMMISSION t

g

.r REGION 11 o

101 MARIETTA ST.. N.W.. SUITE 3100 k

g*

ATLANTA, G EO RGI A 30303 FEB 27 E In Reply Refer To:

RIIMP]O 0-302 Florida Power Corporation Attn:

J. A. Hancock, Director Nuclear Operations P. O. Box 14042, Mail Stop C-4 St. Petersburg, Florida 33733 Gentlemen:

The enclosed Information Notice provides information with regard to an amendment to the Nuclear Regulatory Commission regulations recuiring the immediate reporting by telephone of significant events at operating nuclear power plants.

Sincerely, f

sf

<L V

h.JamesP.O'ke T/

Director

Enclosures:

1.

IE Information Notice No. 80-06 2.

List of Recently Issued IE Information Notices 80031400Pj

FEB 2 71980 Florida Power Corporation.

cc w/ encl:

D. C. Poole Nuclear Plant Manager Post Office Box 1240 Crystal River, Florida 32629 4

=

G

+

UNITED STATES SSINS No.

6870 NUCLEAR REGULATORY COMMISSION Accession No..

OFFICE OF INSPECTION AND ENFORCEMENT 7912190679 WASHINGTON, D.C.

20555 February 27, 1980 IE Information Notice No. 80-06 NOTIFICATION OF SIGNIFICANT EVENTS Description of Circumstances:

On February 29, 1980, an immediately effective amendment to the Nuclear Regulatory Commission (NRC) regulations is to be published in the Federal Register that sets forth requirements for the reporting of significant events at operating reactors. A copy of the NRC Notice of Rulemaking is enclosed.

The reporting requirement in the new section 50.72, " Notification of significant events," to 10 CFR Part 50 will be effective immediately under the authority of GAO clearance R0072 (Emergency Generic Clearance - Expires 7/31/80), and is being submitted to the General Accounting Office for review under the Federal Reports Act for permanent approval under NRC's existing GA0 clearance for 9 CFR Part 50

(#R0071).

Paragraph (a) of $50.72 requires, in part, that the licensee notify the NRC Operations Center as soon as possible and in all cases within one hour by telephone of the occurrence of any significant event listed in the paragraph.

Reports of events pursuant to $50.72 that are similarly required by Technical Specifications to be reported by telephone within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> are considered to satisfy the Technical Specification requirement for prompt telephone notifica-tion.

Technical Specification requirements for confirmation reports by telegraph, mailgram, or facsimile transmission still apply.

The primary channel for telephone notification of significant events should be through the dedicated telephone line established between the licensee and the NRC Operations Center. An NRC Duty Officer is available, 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> a day, in the NRC Operations Center.

In case the licensee is unable to report a significant event over the dedicated telephone line, the licensee should contact the NRC Operations Center directly by commercial line.

Enclosure:

Notice of Rulemaking DUPLICATE DOCUMENT Entire document previously entered into system under:

_~ 9 frf fo ANO No. of pages:

[p

.