ML19296D934

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-324/79-40 & 50-325/79-44 on 791201-14.No Noncompliance Noted
ML19296D934
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 01/28/1980
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML19296D935 List:
References
NUDOCS 8003130583
Download: ML19296D934 (2)


See also: IR 05000324/1979040

Text

...,y

/

/ C,

o

UNITED STATES

Ch- SW

8*)Mv[yae

pr

g

NUCLEAR REGULATORY COMMISSION

q ;

.p

REGION 11

,

o,, Tg

I

f

101 MARIETTA ST., N.W., SUITE 3100

,

% *****/

ATLANTA, CEORGI A 30303

JAN 2 81990

In Reply Refer To:

RII:JE0

50-325/79-44

50-324/79-40

Carolina Power and Light Company

ATTN: Mr. J. A. Jones, Senior Executive Vice President

and Chief Operating Of ficer

411 Fayetteville Street

Raleigh, NC 27602

Gentlemen:

This refers to the inspection conducted by J. E.

Ouzts of this office on

December 1-14, 1979, of activities authorized by NRC Operating License Nos.

DPR-71 and DPR-62 for the Brunswick facility, and to the discussion of our

findings held with A. C. Tollison at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary infor-

mation identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

np

s

R. C. Lewis, Acting Chief

Reactor Operations and Nuclear

Support Branch

Enclosure:

See Page 2

.

S003130

.

.

'dSN 2 I

Carolina Power and Light Company

-2-

-

Enclosure:

Inspection Report Nos. 50-325/79-44

and 50-324/79-40

cc w/ enc 1:

A. C. Tollison, Jr.

Plant Manager

Box 458

Southport, NC 28461

.