ML19296D782

From kanterella
Jump to navigation Jump to search
Responds to IE Bulletin 79-27, Loss of Non-Class IE Instrumentation & Control Power Sys Bus During Operation. Electrical Distribution Sys Is Designed to Furnish Adequate Power to Plant Sys Supporting Normal Power Production
Date released: 11/06/2019 Download: ML19296D782


UPS Design & Operation Evaluation,Rept to Pnsc in Response to NRC Concerns Arising from Unit 1 SCRAM on 791120.
ML19296D784
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 11/26/1979
From: Boone J, Moore D, Wagoner L
CAROLINA POWER & LIGHT CO.
To:
References
Download: ML19296D784 (20)
Fire Protection Program Review Apcsb 9.5-1,Analysis of Safe Shutdown Capability.
ML19296D783
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 10/28/1977
From:
UNITED ENGINEERS & CONSTRUCTORS, INC.
To:
References
Download: ML19296D783 (33)
Responds to IE Bulletin 79-27, Loss of Non-Class IE Instrumentation & Control Power Sys Bus During Operation. Electrical Distribution Sys Is Designed to Furnish Adequate Power to Plant Sys Supporting Normal Power Production
ML19296D781
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 02/26/1980
From: Furr B
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19296D781 (6)