ML19296D755
| ML19296D755 | |
| Person / Time | |
|---|---|
| Site: | Black Fox |
| Issue date: | 01/22/1980 |
| From: | Seidle W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Lindburg M PUBLIC SERVICE CO. OF OKLAHOMA |
| Shared Package | |
| ML19296D756 | List: |
| References | |
| NUDOCS 8003130118 | |
| Download: ML19296D755 (2) | |
See also: IR 05000556/1980001
Text
/
D
/p Evy%
NUCLEAR REGULATORY COMMISSION
UNITED STATES
f .'
P t
REGloN IV
E
) ' '
611 RY AN PL AZ A DRIVE, SUtTE 1000
g
,j
ARLINGTON, TEX AS 76012
-
oc ~.g y
n
e
5.....'
January 22, 1980
in Reply Refer To:
RIV
Docket No. 50-556/Rpt. 80-01
50-557 /Rp t. 80-01
Public Service Company of Oklahoma
ATTN:
Mr. M. J. Lindburg
Vice President, Power Generation
Box 201
Tulsa, Oklaho=a
74102
Gentlemen:
This refers to the inspection conducted by Mr. W. G. Hubacek of our staff on
January 8-11, 1980, of the implementation of your quality assurance program
for construction activities related to your application for a construction
permit for Black Fox Station, Units No. 1 and 2, and to the discussion of
our findings with Mr. H. H. Eller and members of your staff at the conclusion
of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted
of selective examination of procedures, representative records, interviews
with personnel, and observations by the inspector.
During the inspection, it was found that certain of your activities appeared
to deviate from co==itments in the PSAR.
This item and reference to the
specific commitments are identified in the enclosed Notice of Deviation.
Please provide us within 30 days, in writing, with your co=ments concerning
this item, a description of any steps that have been or will be taken to
prevent recurrence, and the date all corrective actions or preventive
measures were or will be completed.
Two new unresolved items are identified in paragraph 6 of the enclosed report.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If the
report contains any information that you believe to be proprietary, it is
necessary that you submit a written application to this office, within 20 days
of the date of this letter, requesting that such information be withheld from
public disclosure.
The application must include a full statement of the reasons
300313011 ff
.
.
Public Service Company of
-2-
January 22, 1980
why it is claimed that the information is proprietary.
The application should
be prepared so that any proprietary information identified is contained in an
enclosure to the application, since the application without the enclosure will
also be placed in the Public Document Room.
If we do not hear from you in this
regard within the specified period, the report will be placed in the Public
Document Room.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
, f.
f6
m
k'. C. Seidf' )e,
Chief
Reactor Ccnstruction and
Engineering Support Branch
Enclosures:
1.
Appendix A, Notice of Deviation
2.
IE Inspection Report No. 50-556/Rp t.
80-01
50-557/Rpt. 80-01