ML19296D714
| ML19296D714 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 01/30/1980 |
| From: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Dunn C DUQUESNE LIGHT CO. |
| References | |
| IEB-79-01B, IEB-79-1B, NUDOCS 8003130055 | |
| Download: ML19296D714 (2) | |
Text
MC 8(
UNITED STATES g
NUCLEAR REGULATORY COMMISSION
[
631 PARK AVENUE E
REGION 1 0,
4 * *V,,*,o#
KING OF PHUS$1A, PENNSYLVANIA 19406 January 30, 1980 Docket No. 50-334 Duquesne Light Company ATTN: Mr. C. N. Dunn Vice President Operations Division 435 Sixth Avenue Pittsburgh, Pennsylvania 15219 Gentlemen:
This letter confirms the call made to your office on January 29, 1980, in which we extended an invitation for members of your staff to attend a meeting at the Region I office to discuss and clarify the requirements in IE Bulletin 79 01B, Environmental Qualifications of Class IE Equipment, issued on January 14, 1980.
The meeting will be held on February 7,1980, in the Region I conference room
-rting at 9:00 a.m., and is expected to continue for the duration of the day.
ause of the limited size of our facility, we request that you limit the i.
- r. _ cer of your attendees to two persons.
The requirements of Bulletin 79-OlB the procedures we will implement to determine the adequacy of environmental a r..:
qualification of safety system components will be discussed in accordance with the proposed agenda enclosed with this letter.
Your staff members should be prepared to discuss with my staff any areas of Bulletin 79-01B that require interpretation or clarification.
No reply to this letter is required; however, should you have any questions concerning this meeting, please contact Mr. Alan E. Firkel of this office, (215) 337-5296.
Sincerely, k
,_ A W e n a
Boyce H. Grier Director
Enclosure:
Proposed Agenda cc w/ encl:
F. Bissert, Technical Assistant Nuclear R. Washabaugh, QA Manager J. Werling, Station Superintendent G. Moore, General Superintendent, Power Stations Department J. J. Carey, Nuclear Technical Assistant R. Martin, Nuclear Engineer
~
8003180 0 55
4 PROPOSED AGENDA IE BULLETIN 79-018 FEBRUARY 7.1980; 9:00 a.m.
I.
INTRODUCTION AND PURPOSE OF MEETING - R. T. Carlson II.
DISCUSSION OF IE BULLETIN 79-01B - A. E. Finkel A.
BACKGROUND B.
ACTIONS TO BE TAKEN (1)
ENCLOSURE 2 (2)
ENCLOSURE 3 (3)
ENCLOSURES 4 AND 5 C.
ACTION COMPLETION SCHEDULE D.
INFORMATION RE0 VESTED UNDER PROVISIONS OF 10 CFR 50.54(f)
III. DISCUSSION OF SUBSEQUENT ACTIONS BY NRC - A. E. Finkel A.
NUCLEAR FACILITY SITE VISIT (1)
EQUIPMENT INSTALLATION INSPECTION (21 DOCUMENTATION REVIEW IV.
QUESTIONS, COMMENTS, AND GENERAL DISCUSSION - Attendees V.
CLOSING COMMENTS - S. D. Ebneter