ML19296D157

From kanterella
Jump to navigation Jump to search
Forwards Util Rept of Insp Conducted at Facility in Accordance W/Ie Bulletin 79-14,Revision 1. Nonconformances Were Identified & Evaluated to Determined Effect on Sys Design Requirements
Date released: 11/06/2019 Download: ML19296D157


Rept of Insp Conducted at Facility in Accordance W/Ie Bulletin 79-14,Revision 1 (Inaccessible Portions of Safety- Related Sys).
ML19296D158
Person / Time
Site: Oyster Creek
Issue date: 02/22/1980
From:
JERSEY CENTRAL POWER & LIGHT CO.
To:
References
Download: ML19296D158 (12)
Forwards Util Rept of Insp Conducted at Facility in Accordance W/Ie Bulletin 79-14,Revision 1. Nonconformances Were Identified & Evaluated to Determined Effect on Sys Design Requirements
ML19296D156
Person / Time
Site: Oyster Creek
Issue date: 02/22/1980
From: Ross D
JERSEY CENTRAL POWER & LIGHT CO.
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19296D156 (1)