Forwards IE Insp Repts 50-498/79-18 & 50-499/79-18 During Nov 1979.No Noncompliance Noted
ML19296C759
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 01/16/1980
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Eric Turner
HOUSTON LIGHTING & POWER CO.
Shared Package
ML19296C761 List:
References
NUDOCS 8002280093
Download: ML19296C759 (2)


See also: IR 05000498/1979018

Text

/LG

UNITED STATES

_ f * * * 'g %

NUCLEAR REGULATORY COMMISSION

S

,

,

^

9-

0

REGloiN IV

f It

h

'

611 RY AN PL AZA DRIVE SulTE 1000

E

nM' ,j

AR LINGToN, TEX AS 76012

5gq

L.

20.g 'y

9

c

.....'

January 16, 1980

6

In Reply Refer to:

RIV

Docket No. 50-498/Rpt. 79-18

50-499/Rpt. 79-18

Houston Lighting and Power Company

Attn:

Mr. E. A. Turner, Vice President

Power Plant Construction and

Technical Services

Post Office Box 1700

Houston, Texas

77001

Gentlemen:

This refers to the inspection conducted by our Resident Inspector,

Mr. H. S. Phillips, during the period of November 1979 of activities

authorized by NRC Construction Permits No. CPPR-128 and 129 for the

South Texas Project, Units No. 1 and 2, and to the discussion of our

findings with Mr. L. D. Wilson and other members of your staff during

the inspection period.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection con-

sisted of selective er. amination of procedures and representative records,

interviews with personnel, and observations by the inspector.

Within the scope of the inspection, no items of noncompliance were

identified.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room.

If the report contains any information that you believe to be

proprietary, it is necessary that you submit a written application to this

office, within 20 days of the date of this letter, requesting that such

information be withheld from public disclosure.

The application must

include a full statement of the reasons why it is claimed that the information

is proprietary.

The application should be prepared so that any proprietary

information identified is contained in an enclosure to the application, since

the application without the enclosure will also be placed in the Public

Document Room.

If we do not hear from you in this regard within the specified

period, the report will be placed in the Public Document Room.

d

8002280

Houston Lighting and Power

2

Company

January 16, 1980

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

,

.

f

.

.l&

,

W. C. Seid a, Chief

Reactor Con truction and

Engineering Support Branch

Enclosure:

IE Inspection Report No. 50-498/79-18

50-499/79-18