y ata yt ug%

UNITED STATES y'

g NUCLEAR REGULATORY COMMISSION j

REGION V 5 (-

c 0,

g 1990 N. CALIFORNIA BOULEVARD

,e SUlTE 202, WALNUT CREE K PLAZA WALNUT CR EE K, CALIFr 7NIA 94596 February 1,1980 Docket flo. 50-288 Reed College Reed Reactor Facility Portland, Oregon 97202 Attn:

Paul Bragdon President Gentlemen:

The enclosed Circular 80-02 is forwarded to you for information.

If there are any questions related to your understanding of the suggested actions, please contact this office.

Sincerely, L

W R. H. Engelken Director

Enclosures:

1.

IE Circular t'o. 80-02 2.

List of IE Circulars Recently Issued 8002250

SSINS No.: 6830 Accession No.:

UNITED STATES 7912190657 NUCLEAR REGULATORY C0"!1ISSION OFFICE OF INSDECTION AND ENFORCE!!ENT c,

D

} D l

WASHINGTON, D.C.

20555 u e) w&

February 1, 1980 IE Circular No. 80-02 NUCLEAR P0'.-lER PLANT STAFF MORK H0fJRS Description of Circunstances:

Studies indicate that with fatigue, especially because of loss of sleep, an individual's detection of visual signals deteriorates markedly, the tine it takes for a person to make a decision increases and more errors are made, and reading rates decrease.

Other studies show that fatigue results in personnel ignoring some signals because they develop their own subjective standards as to what is important, and as they become more fatiqued they ignore more signals.

Inspections of personnel perfornance and training since the accident at Three Mile Island, have shown that in certain situations facility personnel are either reouired or allowed to remain on duty for extended periods of time.

Also, complaints have been received fron some licensed nuclear power plant operators concerning the number of continuous hours they have been on duty.

Licensee nanagenent is responsible for providing a sufficient number of trained personnel who are in the proper physical condition to operate and maintain the plant. Licensee management should review their administrative procedures covering the working hours of nuclear nower plant staff. These procedures should establish a sound policy covering workina hours for plant staff who perform safety related functions (e.g., senior reactor operators, reactor operators, health physicists, auxiliary operators, I&C technicians, key maintenance personnel, etc.)

Subcommittee ANS-3 is currently developing criteria to address the subject of operator work hours. These guidelines will becone a part of ANSI N18.7. The NRC is also considering issuing requirements for administrative procedures that would control staff overtime.

Until either the ANSI Standard is issued and endorsed by NRC (via a Reculatory Guide) or separate requirements are issued by NRC, it is recomnended that the following guidance 'e used. The c

guidance should be aoplied to all personnel performing a safety related function:

1.

Scheduled work should be linited to the following naxinum work hours:

a.

An individual should not be oermitted to work more than 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> straight.

IE Circular ?!n. 80-02 February 1, 1980 Page 2 of 2 b.

There should be at least a 12-hour break between all v>ork periods.

c.

An individual should not work nore than 72-hours in any 7-day period.

d.

An individual should not work nore than 14 consecutive days without having 2 consecutive days off.

2.

In the event that soecial circunstances arise that require deviation from the above, such deviatSns should be authorized by the Station tianager with approoriate documentation of the cause.

Plants should be staffed and schedules developed to operate such that exceptions are not required.

3.

If an operator is required to work in excess of 12 continuous hours, his duties should be carefully selected.

It is preferable that he not be assioned any task that affects core reactivity or could possibly endanger the safe operation of the plant, flo written resoonse to this Circular is required.

If you desire additional infornation reqarding this natter, contact the Director of the aopropriate flRC Regional Office.

IE Circular t;o. 80-02 Enclosure February 1, 1980 RECENTLY ISSUED IE CIRCULARS Circular Subject Date of Issued to No.

Issue 80-01 Service Advice for GE 1/17/80 All licensees of Induction Disc Relays nuclear power reactor operating facilities and holders of nuclear power reactor cps 79-25 Shock Arrestor Strut 12/20/79 All licensees and Assembly Interference holders of power reactor cps 79-24 Proper Installation and 11/26/79 All Holders of a Calibration of Core Spray Power Reacter OL or Pipe Break Detection CP Equipment on BWRs.

79-23 Motor Starters and 11/26/79 All Power Reactor and Contactors Failed Operating Facilities to Operate and Holders of Reactor cps 79-22 Stroke Times for Power 11/16/79 All Power Reactor Operated Relief Valves Operating Facilities and all Utilities having a CP 79-21 Prevention of Unplanned 10/19/79 All holders of Power Releases of Radioactivity Reactor OLs and cps 79-20 Failure of GTE Sylvania 9/24/79 All holders of Power Relay, Type PM, Bulletin Reactor OLs and cps 7305, Catalog SU12-11-AC with a 12V AC Coil 79-19 Loose Locking Devices 9/13/79 All Holders of Power on Ingersoll-Rand Pumps Reactor OLs and cps 79-18 Proper Installation of Target 9/10/79 All Holders of Power Rock Safety-Relief Valves Reactor OLs and cps 79-17 Contact Problem in SB-12 8/14/79 All Power Reactor Switches on General Electric Licensees with a CP Company Metalclad Circuit and/or OL Breakers