|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217K4451999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Oyster Creek Nuclear Generating Station.With ML20211P6731999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Oyster Creek Nuclear Generating Station.With ML20211A7051999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Oyster Creek Nuclear Station.With ML20209G0631999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Oyster Creek Nuclear Generating Station.With ML20195E7961999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Oyster Creek Nuclear Generating Station.With ML20206N7431999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Oyster Creek Nuclear Generating Station.With ML20205P5401999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Oyster Creek Nuclear Generating Station.With ML20204C8201999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Oyster Creek Nuclear Generating Station.With ML20199E4671998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Oyster Creek Nuclear Generating Station.With ML20198D2091998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Oyster Creek Nuclear Generating Station.With ML20155J3021998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Oyster Creek Nuclear Generating Station.With ML20154L5571998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Oyster Creek Nuclear Generating Station.With ML20151V6311998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Oyster Creek Nuclear Generating Station.With ML20237B0131998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Oyster Creek Nuclear Generating Station ML20236R0511998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Oyster Creek Nuclear Generating Station ML20249B2981998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Oyster Creek Nuclear Station ML20247G0581998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Oyster Creek Nuclear Generating Station ML20216K0341998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Oyster Creek Nuclear Generating Station ML20216J0841998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Oyster Creek Nuclear Generating Station ML20203A3801998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Oyster Creek Nuclear Generation Station ML20198P1791997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Oyster Creek Nuclear Station ML20197E9131997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Oyster Creek Nuclear Station ML20199D4381997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Oyster Creek Nuclear Station ML20198J7361997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Oyster Creek Nuclear Generating Station ML20210V0181997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Oyster Creek Nuclear Generating Station ML20210L2961997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Oyster Creek Nuclear Station ML20141H2051997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Oyster Creek Nuclear Station ML20210L3081997-06-30030 June 1997 Corrected Page to MOR for June 1997 for Oyster Creek Nuclear Generating Station ML20141A5021997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Oyster Creek Nuclear Generating Station ML20141H7441997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Oyster Creek Nuclear Generating Station ML20137X8231997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Oyster Creek Nuclear Generating Station ML20137C3771997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Ocnpp ML20134P6151997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Oyster Creek Nuclear Generating Station ML20133M1751996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Oyster Creek Nuclear Generating Station ML20132D1011996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Oyster Creek Nuclear Generating Station ML20134M9761996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Oyster Creek Nuclear Generating Station ML20129B1631996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Oyster Creek Nuclear Generating Station ML20117M7561996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Oyster Creek Nuclear Generating Station ML20116M6761996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Oyster Creek Nuclear Generating Station ML20115F8561996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Oyster Creek Nuclear Generating Station ML20112J7431996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Oyster Creek Nuclear Generating Station ML20112A6891996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Oyster Creek Nuclear Generating Station ML20101R0401996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Oyster Creek Station ML20101D7701996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Ocnpp ML20100G5101996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Oyster Creek Nuclear Generating Station ML20096E8071995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Oyster Creek Nuclear Generating Station ML20099L7571995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Oyster Creek Nuclear Generating Station ML20094P8431995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Oyster Creek Nuclear Generating Station ML20093H3571995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Oyster Creek Nuclear Generating Station ML20092H7741995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Oyster Creek Nuclear Generating Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K4451999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Oyster Creek Nuclear Generating Station.With ML20211P6731999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Oyster Creek Nuclear Generating Station.With ML20211A7051999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Oyster Creek Nuclear Station.With ML20209G0631999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Oyster Creek Nuclear Generating Station.With ML20212H5491999-06-18018 June 1999 Non-proprietary Rev 4 to HI-981983, Licensing Rept for Storage Capacity Expansion of Oyster Creek Spent Fuel Pool ML20195E7961999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Oyster Creek Nuclear Generating Station.With ML20206N7431999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Oyster Creek Nuclear Generating Station.With ML20205P5401999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Oyster Creek Nuclear Generating Station.With ML20204C8201999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Oyster Creek Nuclear Generating Station.With ML20199E4671998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Oyster Creek Nuclear Generating Station.With ML20195E8321998-12-31031 December 1998 10CFR50.59(b) Rept of Changes to Oyster Creek Sys & Procedures, for Period of June 1997 to Dec 1998.With ML20198D2091998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Oyster Creek Nuclear Generating Station.With ML20195J8591998-11-12012 November 1998 Rev 11 to 1000-PLN-7200.01, Gpu Nuclear Operational QA Plan ML20195C4271998-11-0606 November 1998 Safety Evaluation Supporting Proposed Ocnpp Mod to Install Core Support Plate Wedges to Structurally Replace Lateral Resistance Provided by Rim Hold Down Bolts for One Operating Cycle ML20155J3021998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Oyster Creek Nuclear Generating Station.With ML20154R4981998-10-20020 October 1998 Core Spray Sys Insp Program - 17R ML20154L3051998-10-14014 October 1998 Safety Evaluation Accepting Licensee Request to Defer Insp of 79 Welds from One Fuel Cycle at 17R Outage ML20154Q3371998-09-30030 September 1998 Rev 8 to Oyster Creek Cycle 17,COLR ML20154L5571998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Oyster Creek Nuclear Generating Station.With ML20151V6311998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Oyster Creek Nuclear Generating Station.With ML20237D5691998-08-31031 August 1998 Rev 0 to MPR-1957, Design Submittal for Oyster Creek Core Plate Wedge Modification ML20237D5711998-08-18018 August 1998 Rev 0 to SE-000222-002, Core Plate Wedge Installation ML20237B0131998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Oyster Creek Nuclear Generating Station ML20236R0511998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Oyster Creek Nuclear Generating Station ML20249B2981998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Oyster Creek Nuclear Station ML20248F3531998-05-21021 May 1998 Part 21 Rept Re Electronic Equipment Repaired or Reworked by Integrated Resources,Inc from Approx 930101-980501.Caused by 1 Capacitor in Each Unit Being Installed W/Reverse Polarity. Policy of Second Checking All Capacitors Is Being Adopted ML20247F1891998-05-0505 May 1998 Risk Evaluation of Post-LOCA Containment Overpressure Request ML20247G0581998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Oyster Creek Nuclear Generating Station ML20216K0341998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Oyster Creek Nuclear Generating Station ML20151Y4651998-03-31031 March 1998 Non-proprietary Version of Rev 1 to GENE-E21-00143, ECCS Suction Strainer Hydraulic Sizing Rept ML20217A4631998-03-23023 March 1998 Safety Evaluation Accepting Use of Three Heats/Lots of Hot Rolled XM-19 Matl in Core Shroud Repair Assemblies Re Licenses DPR-16 & DPR-59,respectively ML20212E2291998-03-0404 March 1998 Rev 11 to 1000-PLN-7200,01, Gpu Nuclear Operational QAP, Consisting of Revised Pages & Pages for Which Pagination Affected ML20216J0841998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Oyster Creek Nuclear Generating Station ML20203B2781998-02-16016 February 1998 10CFR50.59(b) Rept of Changes to Oyster Creek Systems & Procedures ML20203A3801998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Oyster Creek Nuclear Generation Station ML20198P1791997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Oyster Creek Nuclear Station ML20217C7591997-12-31031 December 1997 1997 Annual Environmental Operating Rept for Oyster Creek Nuclear Generating Station ML20197E9131997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Oyster Creek Nuclear Station ML20199E4561997-11-13013 November 1997 Safety Evaluation Accepting Ampacity Derating Analysis in Response to NRC RAI Re GL-92-08, Thermo-Lag 330-1 Fire Barriers, for Plant ML20199D4381997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Oyster Creek Nuclear Station ML20202E8511997-10-21021 October 1997 Rev 0 to Scenario 47, Gpu Nuclear Oyster Creek Nuclear Generating Station Emergency Preparedness (Nrc/Fema Evaluated) 1997 Biennial Exercise. Pages 49 & 59 of Incoming Submittal Were Not Included ML20211M9481997-10-0303 October 1997 Supplemental Part 21 Rept Re Condition Effected Emergency Svc Water Pumps Supplied by Bw/Ip Intl Inc to Gpu Nuclear, Oyster Creek Nuclear Generation Station.No Other Nuclear Generating Stations Effected by Notification ML20198J7361997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Oyster Creek Nuclear Generating Station ML20211B7461997-09-24024 September 1997 Part 21 Rept Re Failure of Emergency Service Water Pump Due to Threaded Flange Attaching Column to Top Series Case Failure.Caused by Dissimilar Metals.Pumps in High Ion Svc Will Be Upgraded to 316 Stainless Steel Matl ML20210V0181997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Oyster Creek Nuclear Generating Station ML20210L2961997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Oyster Creek Nuclear Station ML20149F9961997-07-18018 July 1997 Safety Evaluation Re Gpu Nuclear Operational Quality Assurance Plan,Rev 10 for Three Mile Island Nuclear Generating Station,Unit 1 & Oyster Creek Nuclear Generating Station ML20196H0111997-07-11011 July 1997 Special Rept 97-001:on 970620,removed High Range Radioactive Noble Gas Effluent Monitor (Stack Ragems) from Service to Allow Secondary Calibr IAW Master Surveillance Schedule. Completed Calibr on 970628 & Returned Stack Ragems to Svc ML20210L3081997-06-30030 June 1997 Corrected Page to MOR for June 1997 for Oyster Creek Nuclear Generating Station ML20141H2051997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Oyster Creek Nuclear Station 1999-09-30
[Table view] |
Text
,
vocnet no su-4 y Oyster Creek Station #1 AVERAGE DAILY POWER LEVEL DOCKET 4...... 50-219 UNIT.......... O. C. 41 REPORT DATE. . . Febr uary 12, 1980 COMPILED BY... C.M. MCCLAIN TELEPHONE..... 201-455-8748 MONTH January 1980 DAY MW DAY MW
- i. 537. 17. O.
- 2. 536. 18. O.
- 3. 533. 19. O.
- 4. 52'. 20. O.
- 5. 14. 21 . O.
- 6. O. 22. O.
- 7. O. 23. O.
- 8. O. 24. O.
~
- 9. O. 25. O.
- 10. O. 26. O.
- 11. O. 27. ..
- 12. O. 28. O.
- 13. O. 29. O.
- 14. O. 30. O.
- 15. O. 31. O.
- 16. O.
t 80 02220 35' -
OPERATING DATA REPORT o$((e")heefslNion#1 OPERATING STATUS UNIT NAME.. 0YSTER CREEK DOCKET NUMBER.. 50-219 UTILITY DATA PREPARED BY...C.M. MCCLAIN 201-455-8748 REPORTING PERIOD... January 1980 LICENSED THERMAL POWER (MWT).. 1930 NAMEPLATE RATING (GROSS MWE).. 650 DESIGN ELECTRICAL RATING (NET MWE).. 650 MAXIhUM DEPENDABLE CAPACITY (GROSS MWE).. 650.
MAXIMUN DEPENDABLE CAPACITY (NET NWE).. 620 IF CHANGES OCCUR IN CAPACITY RATING SINCE LAST REPORT, GIVE REASON...
NONE POWER LEVEL TO WHICH RESTRICTED, IF ANY(NET MWE)... NO RESTRICTION REASON FOR RESTRICTION, IF ANY...
NO RESTRICTION MONTH YEAR CUMULATIVE HOURS IN PERIOD 744.0 744.0 88608.0 HOURS RX CRITICAL 101.5 101.5 68740.8 RX RESERVE SHUTDOWN HRS. 0.0 0.0 468.2 HRS. GEN ON LINE 98.0 98.0 67403.5 UT RESERVE SHUTDOWN HRS 0.0 0.0 0.0 GR055 THERhAL ENERGY 157610.6 157610.6 114036769.9 GROSS ELEC ENERGY 53670.0 53670.0 38935985.0 NET ELEC ENERGY 48612.0 48612.0 37529625.0 UT SERVICE FACTOR 13.2 13.2 76.1 UT AVAILABILITY FACTOR 13.2 13.2 76.i UT CAPACITY FACTOR MDC 10.5 10.5 70.0 UT CAPACITY FACTOR DER 10.1 10.1 . .65.2 CORCED OUTAGE FACTOR 0.0 0.0 6.4 ,
THE STATION IS SCHEDULED TO STARTUP ON MARCH 15, 1980
Docket No. 50-219- -
Oyster Creek Station 11 .-
DOCKET HO. 50-219 UNIT SIIUTDOWNS AND POWER REDUCTIONS Ovster Creek UNIT NAME DATE Feb. 12. 1980 COMPLETED gy C. H. McClain REPOREMONT11 Jan. 1980 TELEP1 TONE 201-4 % -8748 e ri 4 u. 2 5 g Licensee 5%, Cause & Cosacctive
.2 _e k%
Nii. Date {
sg
$6 5
7, .c X, g5 Event j 15 g d
Report #
u7
- v [l u Action to Prevent Recurrence 1 010580 s 61 2.5 C 1 NA NA NA Annual Refueling & Maintenance Outage. .
2 3 4 I
F: Forced Reason: Method: Exhibit G. instructions A Equipment Failure (Explain) 1 Manual for Preparation of Data S: Scheduled B Malatenance of Test 2 Manual Scram. Entry Sheets for Licensee 3 Automatic Scram. Event Re,ost (LER) Flic (NUREG-C-Refueling D-Regulatony Restriction 4-Other (Euplain) 0161)
E-Operator Training & License Exandnation F-Administrative 5 .
G-Operatlunal Esaur (Explain)
Exhibit I Same Sousee (9/77) Il-Other (Explain)
Oyster Creek Station #1 Docket No. 50-219 OPERATION
SUMMARY
JANUARY 1980 At the beginning of the reporting period, the plant was operating at less than rated output due to the burnup of nuclear fuel in an end of cycle coastdown.
Output continued to decrease until the plant was shutdown for the scheduled refueling outage on January 4. The refueling outage continued through the reporting period.
Major items scheduled during the outage include:
Replacement of 144 fuel assemblies Replacement of 75 control blades Replacement of 15 control rod drives Modifications to the pressure suppression pool.
Various modifications to implement NRC Lessons Learned requirements. -
Five Reportable Occurrences were identified during the month.
N.R.E.0.R. #80-1 occurred on January 5 when plant shutdown led to a fish kill.
R.0. #80-1 was identified on January 5 when "D" Electro-Matic Relief Valve failed to open during a surveillance test.
R.O. #80-2 was identified on January 16 . shen a fuel bundle was found to be misoriented in the core.
R.O. #80-3 was identified on January 16 when a crack was found in Core Spray System ll sparger.
R.O. #80-4 was identified on January 19 when a leak was discovered from the Condensate Transfer System.
e O D
0 "
COltlUrrlVW INS'11U4!WP MAltn1NABXlE ON QASL rndts lolt '110: F1XU11 OF JANUAltY 1980 0 ,
Item # Fquipne'nt ,
Malfunction Corrective Action ,
1 E Recirc Punp Motor Dearing 'Ihentoccuple open Spare thernocouple 83-110K wired into the tmperature monitoring circuit 2 Local Temp. Indicator (RIS) 1B06-12 (Above V-16-14) pegged Ikplaced sensor with new one in upscale accordance with vendors manual 3 IIN-APIN Channel selector switch for IIN Replaced switch 15 or APIN 5 needs replacing or cleaning. Drifts downscale when selected to APIN 4 SIN's SIN 23 LCR meter (4F) needs cal. Replaced SIM 01. 23 ICR meter 5 MSL Rad. Monitor #3 Recorder reading low Adj. recorder , ,
6 SIN Test & Cal. (front panel Test) Surv. discrepancies New SIN ICR meter was installed (reference J.O. 25531). Adjusted high trip 7 Rcd Manual Control Sys Experiencing rod block without Found 34-31 had no green green. Bad identification when novinj rods probe. Replaced PIP 8 ADOG & MSL Rad Monitor Surv. Discrepancies Adjusted alarm point & calibrated Front Panel Tests recorder 9 SIN Front Panel Test Surveillance discrepancies Channel 24 gdjusted renote meter to read 9 x 10 . Replaced period light on Ch-22 10 2Kl-Neutr. Mon. Sys. (7R) Tighten loose wire Tightened wire on relay 2Kl.
11 SRM Front Panel Test Surv. Discrepancies Ch. 23 & 24 Recalibrated 12 IIM Front Panel Test Sury. Discrepancies (Ch.13) Recalibrated 13 CRD CRD 34-11 receives no red scram Replaced light switches on 34-11 for indicating light on 4F red light on 4F
Oyster Creek Station il ,
s W IVE MTCIIANICAL MAINIDWEE Off ()AST, T*n0t; Pott Docket No. 50-219
'lllE MOffill OF JNUN1Y 1980 4
M1M8 DOUIPfMIP MAITUNCPION COftIU Cr1VI: N *l*liY1 l
1 ; "A" Rx. Recirc Pmp 'Ihrust button on motor half Machined thrust button to proper size I
coupling needed machining 2 Pond Pmp - Fire Protection Packing leak Repacked pm p 3 i -
Clean-up System PCV-ND-ll Packing leak Tightened packing gland to stop leak 1
4 i Clean-up system Donin. Strainer dirty Replaced strainer Pre-strainer l
5 Refueling Platform Bridge air cmpressor will not Tightened all air hose fittings to preven j maintain receiver pressure air leakage. .
i 6 !
CRD 10-43 V-lll Icaking Replaced with rebuilt valve 7 "A" CRD Filter Filter dirty Installed new elements
{ '
8 ,
Shutd w a Cooling Isolation Packing leak Mjustcxl packing to stop leak
- Valve V-17-1 9 . "B" CRD Filter Filter dirty Installed new elements 4
9 e
t I
i
- i
Uyster treek Station.fi CORRIUPIVE Electrical MMNIUJAtCE Off (W;!, l'il.st; n it Docket No. 50-219 ,
'IllE MONill OP January, 198 0 s
I'IM ts OASL# M M J U C TIOri
,' o.#
y DrJUIPMENT . O.__H u. d. I. 'r.I VE. Ae *r i s N. . ...
1 1680E 3182 DG #2 DC undervoltage alarm Check why alarm is not clearing Checked BIN setpoints. Readjusted 2 1681E 3214 DG II Battery Charger Replace diesel battery charger Coupleted tanp. replacernent i with taip. charger until orig.
I charger is repaired' 3 1682E 3222 Rx Bldg. Crane Mdetenp.repairtomainhoist Made tenporary repair drive motor coninutator 4 1654E 3134 Refueling Bridge Bypass button on pendant for Tightened loose nounting nut.
brickye mcyinted aux. hoist loose -
fran nountings.
S 1707E 3260 #2 DG Battery UV Relay Voltage good - alarm in Mjusted BIN to pick up at 120 VDC drop out at 115.1 VDC 6 1708E 3261 Refueling Bridge Spring returns broken on grapple Replaced broken spring.
raise / lower & trolley; EA4 switches - dangerous when noving fuel & reactor canponents 7 ; 1717E 3282 Refueling Grapple Renair main refueling hoist Mjusted pot on grapple control switch control and repositioned cams on switch.
8 . 1720E 3284 Rod Control System Experienced " Refueling Interlock." Found open wires (2) in interlock cable i Ikxl Block on refueling bridge. Repaired wires and put back in service.
9 !1728E 3290 "C" battery bus chargers Install volt meters on 9XP Installed 2 volt meters for battery i charger control at 9XF i
j 1
i I
~
Oyster Creek Station #1 ,
Docket No. 50-219 00RRDCPlVE INSTRibEff MAINIHWEE ON OASL ITD4S FOR 'I1lE FONDI OF JNRIARY 1980 -
Item i Equipient Fulfunction Corrective Action IRM Ch. 13 Surv. discrepancies (Ch.13) Recalibrated IRM output to recorder 14 15 Radiation bbnitoring Sys. Turb. lub. oil equip. area i ~3. Recalibrated sensor & converter nonitor R014A-6 is reading .1gh Area Rad. bbnitor R015C-10 Erratic behavior of noter Replaced sensor and convertor 16 indication.
CRD Replace or repair scram solenoid Replaced switch 17 test switch CRD 26-47 SRM Front Panel Test Surveillance discrepancies SIN 24 - adjusted remota nuter indicatioc 18 SIN 23 - found bad Z14 Mule; replaced (see surv. of 1/18/80) with spare Replace MSL high tenp. switch Replaced ID10 "J" perforned proc.
19 MSL 111gh Te p. Sensor 619.3.009 & 619.3.010 (lB10J) fourxl to be erratic while 1erfonning surv. 619.3.009 S/N204 36-17C detector bypassed due to Megger & bk. down check indicate this 20 LPRM 36-17 C spiking, determine if spiking detector is defective due to detector or convertor ARM D-2 (Air compressor area) Drifts upscale Replaced defective sensor & convertor 21 detector .
Surv. Discrepancies Readjusted downschle trippoints 22 SGTS #1 & # 2' Rad. Fbnitors Failed downscale Icose slide wire-repaired & ckd. cal -
23 1F/2F Diergency Condenscr, RV satisfactory Dish. 'Ibip. Recorder Surv. discrepancy Readjust upscale trip to occur 013 24 Rx Bldg. Vent Rad Fbnitor-C9 mr/hr (was found 018 mr/hr Surv. discrepancy Readjusted upscale trip to occur 013 25 Rx Bldg. Vent Rad bbnitor-B9 mr/hr (was found @ 14 mr/hr)12-17D Flux Artp. Defective . Replaced flux anp.12-17D 26 LPRM ,
e Oyster Creek Station #1 Docket No. 50-219 REFUELING INFORMATION - JANUARY 1980 Hame of faellity: Oyster Creek Station #1 Scheduled date for next refueling shutdown: January 5,1980 Scheduled date for restart following refueling: March 15, 1980 Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
No Technical Specification change rel'ative to the refueling is anticipated.
Scheduled date(s) for submitting proposed licensing action and supporting information:
- 1. February 1980 - Cycle independent General Electric fuel design Information and safety analysis for future use.
- 2. No submittal is scheduled for the use of Exxon fuel. .
Important IIcensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
- 1. General Electric Fuel Assemblies - Fuel design and performance analysis methods have been approved by NRC. New operating procedures, if necessary, will be submitted at a later date.
- 2. Exxon Fuel Assemblies - No major changes have been made, nor are there any anticipated.
The number of fuel assemblies (a) in the core - 560 (b) in the spent fuel storage pool - 620 The present IIcensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies: ,
. Present: 1,800 Planned: 2,600 The projected date of the last refueling that can be discharged to the spent' fuel pool assdming the present licensed capacity:
The Spring 1987 Outage.
.