Forwards IE Bulletin 80-03, Loss of Charcoal from Std Type II,Two-Inch,Tray Adsorber Cells. Action Required
ML19296B679
Person / Time
Site: Beaver Valley
Issue date: 02/06/1980
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Dunn C
DUQUESNE LIGHT CO.
References
NUDOCS 8002210252
Download: ML19296B679 (1)


Text

  • p aro

,8 o,,

UNITED STATES NUCLEAR REGULATORY COMMISSION

~

a 5

g REGION I 0

c 631 PARK AVENUE 4'+,

,d KING OF PRUSSIA. PENNSYLVANIA 19406 Docket No 50-334 0 6 7939 Duquesne Light Company ATTN:

Mr. C. N. Dunn Vice President Operations Division 435 Sixth Avenue Pittsburgh, Pennsylvania 15219 Gentlemen:

Enclosed is IE Bulletin No. 80-03 which requires action by you with regard to your power reactor facility (ies) with an cperating license or a construction permit.

Should you have questions regarding this Bulletin or the actions required of you, please contact this office.

Sincerely,

& W.

~

oyce H. Grier Director

Enclosures:

1.

IE Bulletin No. 80-03 2.

List of Recently Issued IE Bulletins CONTACT:

G. H. Smith (215-337-5200) cc w/encls:

F. Bissert, Technical Assistant Nuclear R. Washabaugh, QA Manager J. Werling, Station Superintendent G. Moore, General Superintendent, Power Stations Department J. J. Carey, Director of Nuclear Operations R. Martin, Nuclear Engineer J. Sieber, Superintendent of Licensing and Compliance, BVPS 8002210

ENCLOSURE 1 SSINS No.: 6820 UNITED STATES Accessions No.:

Nb m AR REGULATORY COMMISSION 7912190669 0FFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 IE Bulletin No. 80-03 Date: February 6, 1980 Page 1 of 2 LOSS OF CHARC0AL FROM STANDARD TYPE II, 2 INCH, TRAY ADSORBER CELLS Description of Circumstances:

During preliminary leak tests of charcoal adsorber cells in certain ventilation systems at Sequoyah Nuclear Plant, it was determined that on certain adsorber cells the spacing between rivets securing the perforated screen to the casing was too great to ensure adequate contact between the casing and the screen, thus allowing charcoal to escape.

The problem was discovered when a visual inspection detected loose charcoal on the floor of the filter housings and on the outside horizontal surfaces of the adsorber cells.

Loss of charcoal was also indicated by observation of light penetrating through the cells.

Additional inspection revealed that the rivets securing the perforated screens to the cell casing were approximately six inches apart and the screen appeared to be sagging away from the casing between rivets.

The particular adsorber cells being tested at Sequoyah Nuclear Plant were Flanders Type II pre-1974 fabrication.

There 4 a possibility that design of adsorber cells with wide spacing between screen 'ivets may pass initial freon leak tests but degrade significantly during operation thus reducing the margin of safety during postulated accidents.

The responses from this Bulletin will be used by the NRC to evaluate need for more frequent inspection / testing.

For all power reactor facilities with an Operating License:

1.

Determine if charcoal adsorber cells in use, or proposed for use, have the potential for a loss of charcoal incidental to handling, storage or use (as appropriate).

Particular attention should be directed to exam-ination of a) rivet spacing resulting in separation of screen and cell housing and b) adsorber cell or filter housing deformation causing loss of charccal and/or channeling.

Either of these items could result in a degraded filtration system incapable of performing its intended function.

The preferred method of this determination is a visual inspection of the filter housing and adsorber cells as described in Section 5 of ANSI N510-1975.

If this method is not feasible, state in the report required by Paragraph 4 how the determination was made.

IE Bulletin No. 80-03 Date: February 6, 1980 Page 2 of 2 2.

For ESF filtration systems, any identified defective cells shall be replaced and the operability of the system (after cell replacement) demonstrated by leak testing within 7 days.

Preferred method of leak testing is as described in Regulatory Guide 1.52 and Section 12 of ANSI N510-1975.

3.

For normal ventilation exhaust filtration systems which employ charcoal adsorber cells and for which radioactive removal efficiency has been assumed in determining compliance with the "as low as reasonably achievable" design criteria of 10 CFR 50, Appendix I, any identified defective cells shall be replaced as soon as possible but at least within 30 days.

After replacement, the system should be demonstrated operable by leak testing within an aditional 30 days.

Preferred method of testing is as described in Regulatory Guide 1.140 and Section 12 of ANSI N510-1975.

4.

Report in writing within 45 days of the date of this Bulletin the results of the determination required by Paragraph 1.

The report shall include the type of cells employed (manufacturer and cell design), system containing the cells, observed cell condition (degradation / sagging) and a discussion of visual inspection procedure and results.

For all Power Reactor Facilities with a Construction Permit:

1.

Visual inspection shall be conducted only if the chart.oal adsorber cells have been purchased and shipment received.

A representative number (approximately 5) of each type of cell design / manufacturer shall be visually inspected for such deficiencies as rivet spacing and screen / casing separation which could lead to loss of charcoal incidental to handling, storage, or use.

2.

Report in writing within 45 days of the date of this Bulletin the results of the inspection required by Paragraph 1.

The report shall include the type of cells (manufacturer and cell design), observed cell condition (degradation / sagging) and a discussion of the inspection procedure and results.

Reports shall be sent to the Director of the appropriate NRC Regional Office listed in Appendix D of 10 CFR 20 with a copy to the Director, Division of Fuel Facility and Materials Safety Inspection, Office of Inspection and Enforce-ment, USNRC, Washington, D.C.

20555.

Approved by GAO, B180225(R0072); clearance expires, 7/31/80.

Approval was given under a blanket clearance specifically for identified generic problems.

ENCLOSURE 2 IE Bulletin No. 80-03 Date: February 6, 1980 Page 1 of 1 RECENTLY ISSUED IE BULLETINS Bulletin Subject Date Issued Issued To No.

79-25 Failures of Westinghouse 11/2/79 All Power Reactor BFD Relays in Safety-Facilities with an Related Systems Operating License (0L) or Construction Permit (CP) (for Action) 79-02 Pipe Base Plate Designs 11/8/79 All Power Reactor (Rev. 2)

Using Concrete Expansion Facilities with an Bolts OL or CP 79-26 Baron Loss From BWR 11/20/79 All BWR Power Reactor Control Blades Facilities with an OL 79-27 Loss of Non-Class-1-E 11/30/79 All Power Reactor Instrumentation and Con-Facilities with an OL trol Power System Bus ard those nearing During Operation Licensing (for Action)

All Power Reactor Facilities with a CP (for Information).

79-28 Possible Malfunction 12/7/79 All Power Reactor of NAMCO Model EA180 Facilities with an Limit

  1. - '+ches at OL or CP
Eleva, remperatures79-01B Environmental Quali-1/14/80 All Power Reactors fication of Class IE with an OL except Equipment SEP Plants 80-01 Operability of ADS Valve 1/14/80 All BWRs with an Pneumatic Supply OL 80-02 Inadequate Quality 1/21/80 All BWRs with an Assurance for Nuclear OL or CP Supplied Equipment