ML19296B144

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-460/79-12 & 50-513/79-12 on 791101-30.No Noncompliance Noted
ML19296B144
Person / Time
Site: Washington Public Power Supply System
Issue date: 01/08/1980
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Strand N
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML19296B146 List:
References
NUDOCS 8002200157
Download: ML19296B144 (2)


See also: IR 05000460/1979012

Text

b

'

'

g j, .,,(o,

-

UNITED STATES

,

g ., . ,

j

NUCLE AR REGULATORY f'OMMISSION

.g'g

l

REGION V

o,

p@

g

1990 N. CALIFORNI A BOUL E VARD

\\ , ,v

,,r['

SulTE 202, WALNUT CRE E K PL AZA

,*

WALNUT CRE E K. CAllFORNIA 94596

JAN

8 Et

Docket flos. 50-460/79-12

50-513/79-12

Washington Public Power Supply System

P. O. Box 968

Richland, Washington 99352

Attention: Mr. fl. O. Strand

flanaging Director

Gentlemen:

Subj ect:

flRC Inspection at Washington fluclear Projects 1 & 4

This refers to the inspection conducted by f tr. A. Toth of this office during

the period of flovember 1-30, 1979 of activities authorized by flRC Construction

Pernit flos. CPPR-134 and 174, and to the discussion of our findings held by

Mr. Toth with Mr. T. Houchins and other members of your staff on flovember

19 and 30, 1979.

Areas exanined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel, and ob-

servations by the inspector,

flo items of noncompliance with flRC requirements were identified within the

scope of this inspection.

In accordance with Section 2.790 of the flRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the flRC's Public Document Room.

If this

report contains any information that you believe to be proprietary, it is

necessary that you submit a written application to this office, within 20 days

of the date of this letter, requesting that such information be withheld from

public disclosure.

The application must include a full statement of the rea-

sons why it is claimed that the information is proprietary. The application

should be prepared so that any proprietary information identified is contained

in an enclosure to the application, since the application without the enclosure

will also be placed in the Public Document Room.

If we do not hear from you

in this regard within the specified period, the report will be placed in the

Public Document Room.

8002200

.

Washington Public Power Supply System

-2-

JAN

8 Egg

Should you have any questions concerning this inspection, we will be glad to

discuss them with you.

Sincerely,

'

)

'

.

aA

.

_

( w-

4

G. S. Spencer, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection Report

No. 50-460/79-12

50-513/79-12

cc w/ enclosure:

M. E. Witherspoon, Division Manager

Quality Assurance, WPPSS

J. P. Thomas, Project Manager, WPPSS