4 OPERATING DATA REPORT DOCKETNO DiTE

(-

CO31PLETED BY >

TELEFliONE : -~

OPERATING STATUS i

1. Unir Nsme:

Hatch 2 Notes

2. Reporting Period:

January 1980

3. Licensed Thermal Power (NIWt):

2436 MWt

-4. Nameplate Rating (Gross NIWe): - 817.0 Gross MWe

5. Design Electrical Rating (Net 31We):

784.0 flet MWe

6. 51aximum Dependable Capacity (Gross 51We): 805.7 Gross MWe Slaximum Dependable Capacity (Net 51We):

772.7 fiet MWe,

~

S. If Changes Occur in Capacity Ratings (!! ems Number 3 Through 7) Since Last Report. Give Reasons:

ch,ncad flat M0r from 740 to 772.7 to reflect new utility --- '_

9. Power Level To hhich Restricted. If Any (Net S!We):
10. Reasons For Restrictions,if Any:

This 51onth Yr..t o.Da t e Cumum:.

I1. Hours In Reporting Period 744 744 357-

12. Number Of Hours Reactor Was Criticai 684.1 684.1 33a7 n
13. Reactor Reserve Shutdown Hours 0.0 0.0
14. Hours Generator on-Line 661.2 661.2 30;
15. Unit Resene Shutdown Hours 0.0 0.0
16. Gross Thermal Energy Generated (51WH) 1471890 1471890 696595:
17. Gross Electrical Energy Generated ('.1WH) 49.9_79._0_ _ _,

499790 233575G -

IS. Net Electrieal Energy Generated (.'.tWH) 478796 478796 22359 "

19. Unit Senice Factor 88.9 88.9

..... n

20. Unit Availability Factor 88.9 88.9 0
21. Unit Capacity Factor (Using SIDC Net) 83.3 83.3 i
22. Unit Capacity Factor (Using DER Net) 82.I 82.1 7: -
23. Unit Forced Outage Rate 0.0 0.0
24. Shutdowns Scheduled Oser Next 6.\\1onths (Type. Date,and Duration of Each):

Vont Headpr naflector and Surveillanca Outage. March 1 to Aoril 13

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achiewu INITIA L CRITICALITY INITl4 L ELECTRICITY Coil %1ERCI A L OPERATION 8002.I9Og

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

Y-UNIT D \\TE 2.

C05tPLETED BY U-

~~ '"

TELEPflONE 9IA -

510NTil January DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEV:L (Niwe-Net)

(51We-Net :

1 800 17 792 2

800 is 789 3

801 662 i9 4

800

o 786 5

77a 21 796 6

774 796 22 7

799 23 799 8

795 24 801 9

793 25 771 10 796 26 15 11 789

-7 27 440

-7 23 i3 680 29 29 i4 787 204 3o 15 794 3

507 16 795 INSTRUCTIONS On this format,!ist the average daily unit power leselin NIWe Net for each day in the reporting month. C the nearest whole megawatt.

s 50-366 UNIT S!!UIDOWNS AND POWER REDt!CllONS DOCKET NO.

UNIT NAME liat cli 2 DA TE 2-10-80 COMPLE IED HY J. Lt. Rodtn REPORT MON Ill January 1 EkJPilONE 912-167-7781

i "o

.3 h

k 3Ct'n5CL*

C 'F, E,

CJu$c & Correttive No.

1)2tc g

g g

jgy Evciti a7 g7 Ati,on i,,

$3 5

~5j Report

  • NU h'

Psesent Recurreine u

Q 80-01 800111 S

0 li 4

flA ZZ C0flROD Reduction in power to perfonn turb-ine test and rod sequence exchange 80-02 800126 S

81.4 0

1 flA SA ZZZZZZ Shutdown to perfonn primary contain-ment isolation modifications 80-03 800129 S

01.4 B

4 flA ZZ TURBill Unit was brough off 1ine to perform turbine over.

testing Oo do Ay F: I onced Reason:

Method:

INintur G Instinitions S: Sulied uled A 1:iguipment Failure (laplain)

1. Manual fo 1 s ep.n.uion i, li o i Ital.iinteiunte on' fest J Ma n u il.';. i.n.

I niiy n!,,.:s i.o

,,i.

f-lkl u elt.y i A ni. i,.i:

'. I 1:, 6.r (I i r.

I 1. e.

( > :i 3ilo.r 15 i.. i i..

i i

!-)

a is

'i t

i 4,4 C; i i.

.I.

,E i

t ;

'o i

NARRATIVE REPORT UNIT 2 January 11th Reduction started for turbine test sequence exchange January 25th Shutdown started

  • or TMI connitmen Containment Isclation logic)

January 26th Generator off line 03: 43 CST January 29th Generator on line 13:06 CST Generator off line 19:50 CST for turbine tertin:

Generator on line 21:14 January 30th Reduction due to PCIOMR, CMPF There was no single release of radioactivity or single exoosure which accounts for more than 10% of the allowab'.

values during January of 1Q80.

k6N D

h b

9 S

o sh 5

HATCH 2 SAFETY-RELATED MAINTENANCE REQUESTS TO BE REPORTED FOR OCTOBER 1979 NUMBER DATE COMPLETED DESCRTPTION 79-5c26 1 7-80 Reoaired stanr:-

service water pum:

79-5478 1-24-80 Mounted and protection breaker na,-

79-5513 12-23 79 Performed PM on

?'"

79-5203 1-8-80 Repaired "A"

RHR S'

79-3423 1-8-80 Repaired reactor

-n-"'

control system 79-5990 1-8-80 Repaired rod bico "B"

79-5957 1-7-80 Replaced PSW 3+-

guage 79-5732 1-3-80 Tightened core s o.-

, bolts 79-4086 1-9-80 Adjusted recirc n

high soeed stops 79-6004 1-2-80 Replaced bolts on PSW pumps 79-5948 1-4-80 Replaced inverter discharge flow india-79-5752 1-2-80 Repaired coupling an B.W.

rec. tank tran e -

79-3044 12-3-79 Installed filter circumes on reactor manual relays 79-3338 1-28-80 Inspected RPS M-G s--

v' ~

distribution panel

--w' for missing insulate.-

80-271 1-29-80 Visually inspected held devices in dr" found all to be acca-g

80-376 1-30-80 Repaired motor on main steam line draic 0'342

31.gg Nemov,4 then

' ' ' ~

  • e*"Us

,g 00'371

28~80 Repy**ed t 0 :.

c o nl*'o 1 st y

.