Text
4 OPERATING DATA REPORT DOCKETNO DiTE
(-
CO31PLETED BY >
TELEFliONE : -~
OPERATING STATUS i
- 1. Unir Nsme:
Hatch 2 Notes
- 2. Reporting Period:
January 1980
- 3. Licensed Thermal Power (NIWt):
2436 MWt
-4. Nameplate Rating (Gross NIWe): - 817.0 Gross MWe
- 5. Design Electrical Rating (Net 31We):
784.0 flet MWe
- 6. 51aximum Dependable Capacity (Gross 51We): 805.7 Gross MWe Slaximum Dependable Capacity (Net 51We):
772.7 fiet MWe,
~
S. If Changes Occur in Capacity Ratings (!! ems Number 3 Through 7) Since Last Report. Give Reasons:
ch,ncad flat M0r from 740 to 772.7 to reflect new utility --- '_
- 9. Power Level To hhich Restricted. If Any (Net S!We):
- 10. Reasons For Restrictions,if Any:
This 51onth Yr..t o.Da t e Cumum:.
I1. Hours In Reporting Period 744 744 357-
- 12. Number Of Hours Reactor Was Criticai 684.1 684.1 33a7 n
- 13. Reactor Reserve Shutdown Hours 0.0 0.0
- 14. Hours Generator on-Line 661.2 661.2 30;
- 15. Unit Resene Shutdown Hours 0.0 0.0
- 16. Gross Thermal Energy Generated (51WH) 1471890 1471890 696595:
- 17. Gross Electrical Energy Generated ('.1WH) 49.9_79._0_ _ _,
499790 233575G -
IS. Net Electrieal Energy Generated (.'.tWH) 478796 478796 22359 "
- 19. Unit Senice Factor 88.9 88.9
..... n
- 20. Unit Availability Factor 88.9 88.9 0
- 21. Unit Capacity Factor (Using SIDC Net) 83.3 83.3 i
- 22. Unit Capacity Factor (Using DER Net) 82.I 82.1 7: -
- 23. Unit Forced Outage Rate 0.0 0.0
- 24. Shutdowns Scheduled Oser Next 6.\\1onths (Type. Date,and Duration of Each):
Vont Headpr naflector and Surveillanca Outage. March 1 to Aoril 13
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achiewu INITIA L CRITICALITY INITl4 L ELECTRICITY Coil %1ERCI A L OPERATION 8002.I9Og
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
Y-UNIT D \\TE 2.
C05tPLETED BY U-
~~ '"
TELEPflONE 9IA -
510NTil January DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEV:L (Niwe-Net)
(51We-Net :
1 800 17 792 2
800 is 789 3
801 662 i9 4
800
- o 786 5
77a 21 796 6
774 796 22 7
799 23 799 8
795 24 801 9
793 25 771 10 796 26 15 11 789
-7 27 440
-7 23 i3 680 29 29 i4 787 204 3o 15 794 3
507 16 795 INSTRUCTIONS On this format,!ist the average daily unit power leselin NIWe Net for each day in the reporting month. C the nearest whole megawatt.
s 50-366 UNIT S!!UIDOWNS AND POWER REDt!CllONS DOCKET NO.
UNIT NAME liat cli 2 DA TE 2-10-80 COMPLE IED HY J. Lt. Rodtn REPORT MON Ill January 1 EkJPilONE 912-167-7781
i "o
.3 h
k 3Ct'n5CL*
C 'F, E,
CJu$c & Correttive No.
1)2tc g
g g
jgy Evciti a7 g7 Ati,on i,,
$3 5
~5j Report
- NU h'
Psesent Recurreine u
Q 80-01 800111 S
0 li 4
flA ZZ C0flROD Reduction in power to perfonn turb-ine test and rod sequence exchange 80-02 800126 S
81.4 0
1 flA SA ZZZZZZ Shutdown to perfonn primary contain-ment isolation modifications 80-03 800129 S
01.4 B
4 flA ZZ TURBill Unit was brough off 1ine to perform turbine over.
testing Oo do Ay F: I onced Reason:
Method:
INintur G Instinitions S: Sulied uled A 1:iguipment Failure (laplain)
- 1. Manual fo 1 s ep.n.uion i, li o i Ital.iinteiunte on' fest J Ma n u il.';. i.n.
I niiy n!,,.:s i.o
,,i.
f-lkl u elt.y i A ni. i,.i:
'. I 1:, 6.r (I i r.
I 1. e.
( > :i 3ilo.r 15 i.. i i..
- i i
!-)
- a is
'i t
- i 4,4 C; i i.
.I.
,E i
t ;
'o i
NARRATIVE REPORT UNIT 2 January 11th Reduction started for turbine test sequence exchange January 25th Shutdown started
- or TMI connitmen Containment Isclation logic)
January 26th Generator off line 03: 43 CST January 29th Generator on line 13:06 CST Generator off line 19:50 CST for turbine tertin:
Generator on line 21:14 January 30th Reduction due to PCIOMR, CMPF There was no single release of radioactivity or single exoosure which accounts for more than 10% of the allowab'.
values during January of 1Q80.
k6N D
h b
9 S
o sh 5
HATCH 2 SAFETY-RELATED MAINTENANCE REQUESTS TO BE REPORTED FOR OCTOBER 1979 NUMBER DATE COMPLETED DESCRTPTION 79-5c26 1 7-80 Reoaired stanr:-
service water pum:
79-5478 1-24-80 Mounted and protection breaker na,-
79-5513 12-23 79 Performed PM on
?'"
79-5203 1-8-80 Repaired "A"
RHR S'
79-3423 1-8-80 Repaired reactor
-n-"'
control system 79-5990 1-8-80 Repaired rod bico "B"
79-5957 1-7-80 Replaced PSW 3+-
guage 79-5732 1-3-80 Tightened core s o.-
, bolts 79-4086 1-9-80 Adjusted recirc n
high soeed stops 79-6004 1-2-80 Replaced bolts on PSW pumps 79-5948 1-4-80 Replaced inverter discharge flow india-79-5752 1-2-80 Repaired coupling an B.W.
rec. tank tran e -
79-3044 12-3-79 Installed filter circumes on reactor manual relays 79-3338 1-28-80 Inspected RPS M-G s--
v' ~
distribution panel
--w' for missing insulate.-
80-271 1-29-80 Visually inspected held devices in dr" found all to be acca-g
80-376 1-30-80 Repaired motor on main steam line draic 0'342
31.gg Nemov,4 then
' ' ' ~
- e*"Us
,g 00'371
28~80 Repy**ed t 0 :.
c o nl*'o 1 st y
.