LER 78-088/03L-1 on 780731:during Power Reduction,Positive Moderator Temp Coefficient & Adjustment to Reactor Demand Station Resulted in Rapid Decrease in Coolant Sys Average Temp.Caused by Operator Error
ML19296A253
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/28/1978
From: Marley J
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19296A252 List:
References
FOIA-79-98 LER-78-088-03L, LER-78-88-3L, NUDOCS 7903050314
Download: ML19296A253 (3)


Text

.

U. S. NUCLE AR REGULATORY COMMISSION RC F OnL1366 il 11) LICENSEE EVENT REPORT (PLE ASE PRINT OR TYPE alt REQUIREO INFORMATION)

CONTROL OLOCC l l l l l l 6

lh l0l0l-l0l0l3 lp lp ( l3 h j@4 l1 l1 p l1 l@ 7 l l@

1

  • J bAI Sd LIGENSE TYPE JJ o 1 l0 lH lD lB lS l1 I4 f5 LICE %E %VtjlH 2'J 26 3 8 9 LICEr.5EE CODE CON'T l1 l 7 l8 @l0 l8 l 2 l 8 l 7 l860j@ ,

o i 3 c[ y l0 l 5 l0DOCKET l- 10l %YBEH 3l 4 l 6 bd@l W0 l 713 EVENT DATE 74 75 REPORT DATE f

I 8 f,0 61 j

EVENT DESCRIPTION AND PROB ABLE CONSEQUENCES hreactor power was being redu o 7 l On July 31, 1978 at 1830 hours0.0212 days <br />0.508 hours <br />0.00303 weeks <br />6.96315e-4 months <br />, g

The Reactor Operator was reducing reactor power by adjusting entry into containment.

gg g3; g j The combination of the positive moderator temperature o 4 l the reactor demand station. g to the reactor demand station caused a rapid decrease coefficient and the adjustment g 3 ; j in Tave.

All safety systems remained unaffected and were capable of performing their gg g y .;

(NP-33-78-102) designed functions if an incident had occurred.

gqg I 80 10181 1 __

COMP. VALVE CAUSE CAUSE SU8 CODE SUBCOCE SYST E M COVPONENT CODE o 9 CODE Ic la jg CODE lg l alg lz jz jz [z lz lz jg gg gg SUSCODE 12 13 18 39 20 REVISION 9 10 11 OCCURRENCE REPORT 8 SEQUE NTI A L N O.

7 CODE TYPE LER AO

,_EVENTYEAR REPORT NO.

l0 [8 l8 26l l 0l 3 l lL l g l 1l

@ RE, u g RT l7lzl l__l 21 28 23 30 31 32 22 23 24

_ 21 SU PLIE MAN FA TLPER 2 5 e 17 D FO EL 8.

HOURS lzlzlzlz g l0 l0 l0 lT 40l l Ylg T

AKEN ' ACTIO ON PL A T l43N g lCl@lzlg g g 33 34 3d lz g M 3d di l42N lg 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h j cause of the occurrence was operator error in controlling the reactor l i l o l l The apparent l of j 1

, i j with a positive moderator temperature coef ficient which resulted f rom the remova Reactor Coolant System loop temperature (Tave) was restored ,

g,,7gl the burnable poison rods. j Procedure modifications were ma'de to add a note of p,g3gl to above 525 F in 10 minutes.

l g,g4j l caution for operation with a positive moderator temperature coefficient. 80 7 8 9 DISCOVERY OESCRIPTION iSCOV RY

% POWE R oTHER STATUS l i s STA S L J@ 101010181 x^

l l^l@lN^

A TIVITY CONTENT LOCATION OF RELEASE AMOUNT OF ACTIVITY l RELE ASED OF RELE ASE l l NA 80 Luu8 Lzl@

7 9 LzJ@l NA to tt 44 45 PERSONNEL E APOsunES

  • TYPE C E SCRIP TION UY ER I 7 l PERSONNE INJU :ES DESCRIPTION l N^ 80 i a i dJUV"E l

1t R01 12 01 @ l 7 8 9 LOSS OF OR D AY AGE TO FACILITY TYPE DESCAIP TION f SO

._l1l9l8 9 70 " " ' "S ' " -

7

""%'C-TO~@ 79030503(d J l lllllIli1ll1l$

7 2 o 8 9

[ff issui"h! 10 N^

James Marley 68 69 83 ;

PHONE:

TOLEDO EDISON COMPANY DAVIS-BESSE UNIT ONE NUCLEAR POWER STATION (

SUPPLEMENTAL INFORMATION FOR LER NP-33-78-102 DATE OF EVENT: July 31, 1978 FACILITY: Davis-Besse Unit 1 Reactor Coolant System Loop Temperature Decreased IDENTIFICATION OF OCCURRENCE:

Below Minimum Temperature For Criticality The unit was in Mode 2 with Power (HWT) = 0, and Conditions Prior to Occurrence: .

Load (MWE) = 0.

Description of Occurrence: On July 31, 1978 at 1830 hours0.0212 days <br />0.508 hours <br />0.00303 weeks <br />6.96315e-4 months <br />, reactor power was being reduced in preparation for entry into containment. The reduction in reactor power The subsequently reduced the Reactor Coolant System average temperature (Tave).

Reactor Operator was reducing reactor power per " Station Shutdown and Cooldown Pro-cedure", PP 1102.10, by adjusting the reactor demand station. The combination of the positive moderator temperature coefficient and the adjustment to the reactor demand station caused a rapid decrease in Tave. The downward trend of the Tave could not be stopped and turned around until Tave had decreased belos the minimum temperature for criticality, 525 F tc a minimum of 519 F.

Technical Specification 3.1.1.4 states that Tave shall not drop below 525 F. The action statement requires Tave to be restored to the 525 F limit within 15 minutes or the unit be in hot standby within the next 15 minutes. The Reactor Operators were successful in restoring Tave above 5250F within 10 minutes, thus complying with the action statement. .

Designation of Apparent Cause of Occurrence: The apparent cause of the occurrence I was operator error in controlling the reactor with a positive moderator temperature coefficient that resulted from the removal of the burnable poison rods.

Analysis of Occurrence:

There was no danger to the health and safety of the public or to unit personnel. Reactor Coolant System Tave was restored to above 525oF in t a =In:tes, and the unit continued its planned shutdown. All safety systems remained unaffected and were capable of performing their designed functions should an incident have occurred.

Corrective Action: Reactor Coolant System loop temperature (Tave) was restored to above 525 0 F in ten minutes, thus removing the unit from Technical Specification 3.1.1.4's action statement. Procedure modifications were made to PP 1102.10, Plant Shutdown and Cooldown and PP 1102.02, Plant Startup to add a note of caution for operation with a positive moderator temperature coefficient.(T-3100, T-3101).

LER #78-088