Forwards IE Info Notice 80-39, Malfunction of Solenoid Valves Mfg by Valcor Engineering Corp. No Written Response Is Required
ML19295F977
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/31/1980
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Handcock J
FLORIDA POWER CORP.
References
NUDOCS 8012180014
Download: ML19295F977 (1)


Text

\\

s

,c#

UNITED STATES Jg

  1. 'e NUCLEAR REGULATORY COMMISSION i

'*(

S REGION 11

'f 101 MARIETTA sT.. N.W., Sulf E 310o 3,

4

/

ATLANTA, GEORGIA 3o3o3 OCT 0 ' 1980 In Reply Refer To:

RII: 0

_0-302 s Florida Power Corporation ATTN:

J. A. Hancock, Assistant Vice President Nuclear Operations P. O. Box 14042, Mail Stop C-4 St. Petersburg, FL 33733 Gentlemen:

The enclosed Information Notice provides early notification of an event that may have safety significance. Accordingly, you should review the Infor: nation Notice for possible applicability to your facility.

No specific action or response is requested at this time; however, contingent upon the results of further staff evaluation, a Bulletin of Circular recom-mending or requesting specific licensee actions may be issued.

If you have questions regarding this matter, please contact me.

Sincerely,

%--- -- Y ~ - (.

%2 James P. O'Reilly Director

Enclosures:

1.

IE Information Notice No. 80-39 w/ Enclosure 2.

List of Recently Issued IE Information Notices cc w/ encl:

D. C. Poole, Nuclear Plant Manager E 01318 00IV h

UNITED STATES NUCLEAR PIGULATORY COMMISSION OFFICE OF INSPECTION AND E.NTORCEMENT WASHINGTON, D. C. 20555 October 31, 1980 IE INFORMATION NOTICE NO. 80-39 MAIJUNCTION OF SOLENOID VALVES MANLTACTURED BY VALCOR ENGINEERING CORPORATION PURPOSE:

The intent of this Information Notice is to alert holders of construction permits and operating licenses for nuclear power plants of a potentially generic problem involving the malfunctioning of certain solenoid valves manu-factured by the Valcor Engineering Corporation (Valcor).

The solenoid valves so involved are designated as Valcor Valve Model No. V52600-554-1. Valcor has infomed us that these valves have only been supplied to the McGuire facility; however, since these valves were substituted for solenoid valves of another manufacturer that did not meet the requirements of IE Bulletin No. 79-01 and its amendments, licensees and holders of construction pemits should take into account the problem identified in this Information Notice prior tc, making any similar substitution.

BACKGROUND:

By TWX dated June 27, 1980, Valcor submitted a preliminary 10 CFR Part 21 Report addressing the malfunctioning of Valcor solenoid valves at the McGuire facility. The malfunctioning valver have been identified as Valcor Valve Model No. 52600-554-1. This TWX was subsequently followed by a letter dated July 3, 1980, transm;tting a more detailed Part 21 Report entitled," Quality Assurance Report", a copy of which is attached hereto as Enclosure No.

1.

In brief, the malfunction appears to be an intermittent type wherein the valve fails to cycle from OPEN to CLOSE to OPEN immediately after a sustained period cf operation in the energized (OPEN) mode. Although the valves are rated for

" continuous operation", Valcor contends that the valves were not designed to meet the operating conditions requiring the immediate cycling from OPEN to CLOSE to 01-EN after a sustained period of continuous energization. A major source of the problem, therefore, may be a misunderstanding of the term

" continuous operation". By letter dated July 14, 1980 to Duke Power Company, Valcor transmitted its recommendations in this natter entitled, " Outline -

Suggested Modification Procedures", a copy of which is attached hereto as Enclosure No. 2.

Enclosures:

1.

Quality Assurance Raport DUPLICATE DOCUMENT Entire document previously entered into system under: