LER-1980-008, /01T-0:on 800215,during Insp for IE Bulletin 79-14,discovered Nine Pipe Clamps Installed W/O Restraining Welded Lugs.Caused by Oversight During Const.Welded Lugs to Be Installed |
| Event date: |
|
|---|
| Report date: |
|
|---|
| 2191980008R01 - NRC Website |
|
text
j t.
t l1 (PLE AsE PRINT OR TYPE ALL REQUIRED INFOR. ATION
'-~----A i
i t
N -
O C
C li nl n! -
nlnlq lnln l. ln in l
- 1. l ] l 1 l } l 1 l l
l E -
- - E*sSEE ::DE 14 15 LICENSE r.vv5 Ea 25 1E Li;ENsE TYPE JC E: ;
SE C*J'T l'*i*!IL]@l0151010 10 12 11 b l @ l of 21 1I EI 81 0l @ l nI l
0ii:
63 61 DQ:K ET NUvS ER 6E 69 EVENT OATE 14 7b REPORT C ATE EO
~ '
EVE!.' DESCRIPTION AND PROBABLE CONSEQUENCES h 0 ::
I On February 15. 1980. durine the insoection recuired for IE Aulletin I
c is i 79-14, nine pipe clamps were discovered improperly installed.
The clamn I
c 6.: i ]
s which connect the snubbers to the isolation condenser nipina were not is restrained by welded lugs.
The snubbers, as referenced on Sercen-Patter-I son drawing are numbered 632R1, 632R2, 632R3, 632R4, 632R7. 633R1, 633R2.
1
- e! i H 3R3, and 633R4.
The event is reported in compliance with Technical Specifications paragraph 6.9.2.a. 9) j
- is, r9 SYSTEY
CAUSE
C A USE 00*
VA LV E
- ,1
,E Sas:::E
- .*:.E>:
- I
!UI:::t
- Uc :::
5 I F l @ l B l@ 11l h l S I U I P l 0 i R I T lh l A lh l 2 l h
- i
- - l 5
- 0 11 1:
12 1E 4
20 SE QUENT: AL CCC.*REN:E RgrCRT REV4SCN REPORT NC.
- ODE TYPE N O.
h =,ig=c hl VENT vf 4Rl_l l 0l 01 8l
]/l l0 l1 l lTl l-l l0l g:
8l 0; 21 22 23 24 IE 27 OE OS 20 31 32 '
AT: N *JTUaE IS*ECT
$*UTDOWN AT A:HvENT N8RO t, PRIME COMP.
COV'ONEN-TAKEN A: TION ON PL ANT METHOD wCua! 22 S UE Y:"T E D FCRedV5.
SUPP LIE R M ANUr A07gs g =
i X!@[s-lZg l Z jg l 0j 0l 0l lY l g l N g l2 jg l -
- - l-l-l F
N 25 se 3,
4:
41 c
4 44 c
..CAUSE DESCRIPTICN AND CORRECTIVE ACTIONS h 1 ;c l
The weld luas were not installed durino plant construction.
The clamos i
1 6i l
will be prevented from sliding during a seismic event by attached weld-1 3,7 l
ed lugs to the piping.
l 1
2 l
I 1 64 l
80 8 9 F ActLtTY METHOD OF ST ATUS
% POWER OTHER STATUS DIS:OVE RY DISCOVERY DESCRIPTION NA l
lCl@l Inspection for Bulletin 79-14 l
i l5 l Hl@ l0 l0 l0 l@l 8 9 to 12 11 44 45 46 80 ACTiv TY CONTENT RELE A!.E s OF RELEASE AMOUNT OF ACTIVITY LOC ATION OF RELEASE NA l
l NA l
l Zl @ l Zlgl 1
s 8 9 10 11 44 45 80 PERSONNEL EXPOSURES 1 l7 l0 10 l0 lhlTYPEZ lhl DESCRIPTION -
l NU*/ E E R NA 6 9 11 12 13 60 PEPLON*dE L INJukiES agu.*E E R
DESCRIPTION
a NA ra n l
i j, l0 10 10 l@l o.
1 g
q e s n
12 l
s:
LO 08 OR DA* AGE TO F ACILITY
^
TvrE OES GIPTION NA
..L, l Z jgl i
c 60 e
s.
it N RC USE ON LY v. ::T'
,SsUt %).u,:Es:=..T O*. v Weekly News Release l
lllIIlllll l i l '.
l Y j
v CC C5 G
u.
t *>
tL 455-8784 Donald A. Ross 8003070 P+dO*JE-e. A t.* E <p o c. E c A t E p
e Jersey Central Power & Light Company
)
Macson Avenue at Pant" 506. Road Mo nstown, New Je sey 07960 (20" ~55-8200 OYSTER CREEK NUCLEAR GENERATING STATION Forked River, New Jersey 08731 Licer.see Event Report Reportable Occurrence No. 50-219/80-8/IT Recort Date February 29, 1980 Occurrence Date February 15, 1980 identification of Occurrence During verification of as-built conditions for piping hangers, it was noticed that nine (9) pipe clamps on piping to the isolation condensers were not pro-perly installed.
This event is considered to be a reportable occurrence as defined in the Techni-cal Specifications, paragraph 6.9.2.a. (9).
Conditions Prior to Occurrence The plant was shutdown for a refueling / maintenance outage.
The reactor was subcritical.
The reactor mode switch was locked in refuel.
The cavity was flooded.
Description of Occurrence On Friday, February 15, 1980, during the inspection required for IE Bulletin 79-14, nine pipe clamps were discovered improperly installed.
The clamps which connect the snubbers to the isolation condenser piping were not restrained by welded lugs.
The snubbers, as referenced by Bergen-Tatterson Drawing, are numbered:
632R1 633R1 632R2 633R2 632R3 633R3 632R4 633R4 632R7 Je se. Cem a Powe 2. L;n Compan, it a Memoe of tne Gene a :.c': umes system
F.e:c ta:le Occurrence No. 50-219/SO-8/1T Page 2 Fe:reary 29, 198J A:carent Cause of Occurrence The weld lugs were not installed during plant construction.
Analvsis of Occurrence The snubbers are attached to the pipe clamps in three different methods.
One method is connecting the snubber line of direction through the center line of the pipe.
Inis method does not require welding of clamp to the pipe because no sliding can occur.
The other methods of attachment are axial and torsional.
These two methods require welding of the clamp to the pipe because there would be a ;0ssibility of the clamp sliding during a seismic event.
The pu pose of tne Isolation Condenser System is to depressurire the reactor anc to rencve reactor decay heat in the event that the turbine generator and main conde'ser are unavailable as a heat sink.
The system consists of two loops, each ca:able of accomplishing the purpose of the svstem.
If a seismic event would have occurred, the pipe restraint may not have functiored as recuired.
Corrective Action
The nine clamps will be prevented from sliding during a seismic event by attach-ing welded lugs to the piping.
The lug placement has been determined by a Burns G Roe review and approved by Generation Engineering.
Failure Data Not applicable.
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000219/LER-1980-001-01, /01T-o:on 800105,while Performing Electromatic Relief Valve Operability Test,Emergency Releie Valve D Failed to Open.Caused by Component Failure Due to Retainer Ring Being Backed Off Approx Six Threads | /01T-o:on 800105,while Performing Electromatic Relief Valve Operability Test,Emergency Releie Valve D Failed to Open.Caused by Component Failure Due to Retainer Ring Being Backed Off Approx Six Threads | | | 05000219/LER-1980-001, Forwards LER 80-001/01T-0 | Forwards LER 80-001/01T-0 | | | 05000219/LER-1980-002-03, /03L-0:on 800116,during Fuel Bundle Clip Insp,Fuel Bundle UD-3-023 Was Misoriented & Was Not Properly Seated in Core Cell Location.Caused by Personnel Error & Inadequate Procedural Controls.Procedure 205 Revised | /03L-0:on 800116,during Fuel Bundle Clip Insp,Fuel Bundle UD-3-023 Was Misoriented & Was Not Properly Seated in Core Cell Location.Caused by Personnel Error & Inadequate Procedural Controls.Procedure 205 Revised | | | 05000219/LER-1980-002, Forwards LER 80-002/03L-0 | Forwards LER 80-002/03L-0 | | | 05000219/LER-1980-003-01, /01T-0:on 800116,during Inservice Insp on Core Spray Sparger Piping for Sys Ii,Two Indications of Cracks Discovered.Ultrasonic Test Revealed through-wall Cracks. Possibly Caused by Sparger Installation Method | /01T-0:on 800116,during Inservice Insp on Core Spray Sparger Piping for Sys Ii,Two Indications of Cracks Discovered.Ultrasonic Test Revealed through-wall Cracks. Possibly Caused by Sparger Installation Method | | | 05000219/LER-1980-003, Forwards LER 80-003/01T-0 | Forwards LER 80-003/01T-0 | | | 05000219/LER-1980-004, Forwards LER 80-004/03L-0 | Forwards LER 80-004/03L-0 | | | 05000219/LER-1980-004-03, /03L-0:on 800125,on 800125,29 & 0213,radioactive Water Discovered Leaking from Severely Pitted Aluminum Piping of Condensate Transfer Sys.Caused by Galvanic Corrosion.Leaks Temporarily Repaired & Piping to Be Replaced | /03L-0:on 800125,on 800125,29 & 0213,radioactive Water Discovered Leaking from Severely Pitted Aluminum Piping of Condensate Transfer Sys.Caused by Galvanic Corrosion.Leaks Temporarily Repaired & Piping to Be Replaced | | | 05000219/LER-1980-005, Forwards LER 80-005/03L-0 | Forwards LER 80-005/03L-0 | | | 05000219/LER-1980-005-03, /03L-0:on 800205,during Weekly Surveillance of Standby Gas Treatment Sys,Setpoints for Radiation Monitors RNO4A-1 & RNO4A-2 Found to Read Less Conservatively than Tech Spec.Caused by Personnel Error & Instrument Drift | /03L-0:on 800205,during Weekly Surveillance of Standby Gas Treatment Sys,Setpoints for Radiation Monitors RNO4A-1 & RNO4A-2 Found to Read Less Conservatively than Tech Spec.Caused by Personnel Error & Instrument Drift | | | 05000219/LER-1980-006-03, /03L-0:on 800131,during Reactor Recirculation Flow Calibr surveillance,as-found Values of Recirculation Flow Sensors at Zero Percent Simulated Flow Were Out of Tolerance.Caused by Instrument Drift | /03L-0:on 800131,during Reactor Recirculation Flow Calibr surveillance,as-found Values of Recirculation Flow Sensors at Zero Percent Simulated Flow Were Out of Tolerance.Caused by Instrument Drift | | | 05000219/LER-1980-006, Forwards LER 80-006/03L-0 | Forwards LER 80-006/03L-0 | | | 05000219/LER-1980-007-03, /03L-0:on 800213,while Performing 10-h Test on Standby Gas Treatment Sys 1,flow Was Less than Tech Spec Limit.Caused by Slipping Drive Belts on Exhaust Fan EF1-8. Drive Belts Replaced | /03L-0:on 800213,while Performing 10-h Test on Standby Gas Treatment Sys 1,flow Was Less than Tech Spec Limit.Caused by Slipping Drive Belts on Exhaust Fan EF1-8. Drive Belts Replaced | | | 05000219/LER-1980-007, Forwards LER 80-007/03L-0 | Forwards LER 80-007/03L-0 | | | 05000219/LER-1980-008-01, /01T-0:on 800215,during Insp for IE Bulletin 79-14,discovered Nine Pipe Clamps Installed W/O Restraining Welded Lugs.Caused by Oversight During Const.Welded Lugs to Be Installed | /01T-0:on 800215,during Insp for IE Bulletin 79-14,discovered Nine Pipe Clamps Installed W/O Restraining Welded Lugs.Caused by Oversight During Const.Welded Lugs to Be Installed | | | 05000219/LER-1980-008, Forwards LER 80-008/01T-0 | Forwards LER 80-008/01T-0 | | | 05000219/LER-1980-009-03, During Annual Insp of Containment Spray Heat Exchanges,Leaks Discovered in Four Heat Exchangers.Caused by Component Failure & Design.Heat Exchangers to Be Retubed W/Titanium | During Annual Insp of Containment Spray Heat Exchanges,Leaks Discovered in Four Heat Exchangers.Caused by Component Failure & Design.Heat Exchangers to Be Retubed W/Titanium | | | 05000219/LER-1980-009, Forwards Revised LER 80-009/03L-1 | Forwards Revised LER 80-009/03L-1 | | | 05000219/LER-1980-010, Forwards LER 80-010/01T-0 | Forwards LER 80-010/01T-0 | | | 05000219/LER-1980-010-01, /01T-0:on 800220,during IE Bulletin 79-14 Insp, Pipe hangers,NP-2-R8A & NP-2-R8B Found Improperly Installed. Cleanup Sys Restraint Mod & Nonrigid Restraint Added | /01T-0:on 800220,during IE Bulletin 79-14 Insp, Pipe hangers,NP-2-R8A & NP-2-R8B Found Improperly Installed. Cleanup Sys Restraint Mod & Nonrigid Restraint Added | | | 05000219/LER-1980-010-03, /03L-1:on 790417,excavation Was Started to Repair Leak Near Inside Penetration within Pipe Tunnel.Activity Was Detected in Soil Near Dedt Line.Dedt Line Rerouted on 800316.Line Will Be Repaired | /03L-1:on 790417,excavation Was Started to Repair Leak Near Inside Penetration within Pipe Tunnel.Activity Was Detected in Soil Near Dedt Line.Dedt Line Rerouted on 800316.Line Will Be Repaired | | | 05000219/LER-1980-011-03, /03L-0:on 800219,during Surveillance Test,Trip Occurred on Standby Gas Treatment Sys 1.Caused by Cracked Flow Sensing Line Which Was Probably Stepped On.Line Replaced | /03L-0:on 800219,during Surveillance Test,Trip Occurred on Standby Gas Treatment Sys 1.Caused by Cracked Flow Sensing Line Which Was Probably Stepped On.Line Replaced | | | 05000219/LER-1980-011, Forwards LER 80-011/03L-0 | Forwards LER 80-011/03L-0 | | | 05000219/LER-1980-012, Forwards LER 80-012/03L-0 | Forwards LER 80-012/03L-0 | | | 05000219/LER-1980-012-03, /03L-0:on 800228,discovered That Weekly Surveillance Tests for Main Station & Diesel Generator Batteries Not Performed During Seventh Wk.Caused by Error in Personnel.Evaluation Will Be Made to Determine Improvements | /03L-0:on 800228,discovered That Weekly Surveillance Tests for Main Station & Diesel Generator Batteries Not Performed During Seventh Wk.Caused by Error in Personnel.Evaluation Will Be Made to Determine Improvements | | | 05000219/LER-1980-013, Forwards LER 80-013/01T-0 | Forwards LER 80-013/01T-0 | | | 05000219/LER-1980-013-01, /01T-0:on 800309,fire Suppression Water Sys Removed from Svc to Replace Cracked Valve,Contrary to Tech Specs.Fire Truck Pumper Used as Water Supply Backup. Cause of Valve Body Crack Under Investigation | /01T-0:on 800309,fire Suppression Water Sys Removed from Svc to Replace Cracked Valve,Contrary to Tech Specs.Fire Truck Pumper Used as Water Supply Backup. Cause of Valve Body Crack Under Investigation | | | 05000219/LER-1980-014-01, /01T-0:on 800302,emergency Diesel Generator 1 Failed to Synchronize & Tripped When Generator 2 Was Tagged for Mod.Caused by Component Failure.Fuse F7,found Loose in Holder.Fuseholder Repaired | /01T-0:on 800302,emergency Diesel Generator 1 Failed to Synchronize & Tripped When Generator 2 Was Tagged for Mod.Caused by Component Failure.Fuse F7,found Loose in Holder.Fuseholder Repaired | | | 05000219/LER-1980-014, Forwards LER 80-014/01T-0 | Forwards LER 80-014/01T-0 | | | 05000219/LER-1980-015, Forwards LER 80-015/03L-0 | Forwards LER 80-015/03L-0 | | | 05000219/LER-1980-015-03, /03L-0:on 800403,piston Rod on Closure Mechanism for Reactor Bldg Ventilation Automatic Isolation Valve Was Found Broken,Making Valve Inoperable.Caused by Component Failure.New Piston Rod Eye Stud Was Fabricated & Installed | /03L-0:on 800403,piston Rod on Closure Mechanism for Reactor Bldg Ventilation Automatic Isolation Valve Was Found Broken,Making Valve Inoperable.Caused by Component Failure.New Piston Rod Eye Stud Was Fabricated & Installed | | | 05000219/LER-1980-016, Forwards LER 80-016/01T-0 | Forwards LER 80-016/01T-0 | | | 05000219/LER-1980-016-01, /01T-0:on 800512,util Recognized That 800420 Discovery of Defective Pressure Switch,Psl D,Constituted Immediate Rept.Caused by Cocked Teflon Actuator.Switch Removed & Will Be Replaced | /01T-0:on 800512,util Recognized That 800420 Discovery of Defective Pressure Switch,Psl D,Constituted Immediate Rept.Caused by Cocked Teflon Actuator.Switch Removed & Will Be Replaced | | | 05000219/LER-1980-017-01, /01T-0:on 800516,while Performing Control Rod Interference checks,green-green Rod Position Indication Remained Illuminated While Withdrawing Rod 10-23.Caused by Operator & Procedure in Bypass & Component Failure | /01T-0:on 800516,while Performing Control Rod Interference checks,green-green Rod Position Indication Remained Illuminated While Withdrawing Rod 10-23.Caused by Operator & Procedure in Bypass & Component Failure | | | 05000219/LER-1980-017, /03L-0:on 800520,during Investigation of LER 80-17/1T, One Rod Free Travel Interlock Surveillance Requirements Not Performed as Required.Causec by Failure to Perform Procedure & Schedule Surveillance | /03L-0:on 800520,during Investigation of LER 80-17/1T, One Rod Free Travel Interlock Surveillance Requirements Not Performed as Required.Causec by Failure to Perform Procedure & Schedule Surveillance | | | 05000219/LER-1980-018-03, /03L-0:on 800507,during Monthly Surveillance Testing of Reactor High Pressure Scram sensors,RE03D Found to Be Less Conservative than Specified.Caused by Sensor Repeatability.Sensor Reset | /03L-0:on 800507,during Monthly Surveillance Testing of Reactor High Pressure Scram sensors,RE03D Found to Be Less Conservative than Specified.Caused by Sensor Repeatability.Sensor Reset | | | 05000219/LER-1980-018, Forwards LER 80-018/03L-0 | Forwards LER 80-018/03L-0 | | | 05000219/LER-1980-020, Forwards LER 80-020/01T-0 | Forwards LER 80-020/01T-0 | | | 05000219/LER-1980-020-01, /01T-0:on 800605,following Insp of Fire Barriers Protecting safety-related Areas,Several Penetrations Found in Degraded Condition.Caused by Deficiencies in Installation Specs & Personnel Error Re Delay in Establishing Watche | /01T-0:on 800605,following Insp of Fire Barriers Protecting safety-related Areas,Several Penetrations Found in Degraded Condition.Caused by Deficiencies in Installation Specs & Personnel Error Re Delay in Establishing Watches | | | 05000219/LER-1980-021, Has Been Cancelled | Has Been Cancelled | | | 05000219/LER-1980-022-03, /03L-0:on 800603,reactor High Pressure Isolation Condenser Initiation Switch Trip Points Found Less Conservative than Specified.Caused by Unusual Svc Condition. Pressure Switches Reset & Exercised to Ensure Operation | /03L-0:on 800603,reactor High Pressure Isolation Condenser Initiation Switch Trip Points Found Less Conservative than Specified.Caused by Unusual Svc Condition. Pressure Switches Reset & Exercised to Ensure Operation | | | 05000219/LER-1980-022, Forwards LER 80-022/03L-0 | Forwards LER 80-022/03L-0 | | | 05000219/LER-1980-023, Forwards LER 80-023/03L-0 | Forwards LER 80-023/03L-0 | | | 05000219/LER-1980-023-03, /03L-0:on 800523,prior to Inservice Insp Reactor Vessel Hydro,Testing Revealed That Electromatic Relief Valve High Pressure Sensor IA83B Exceeded Tech Spec Setpoint. on 800531,sensor IA83F Found to Exceed Setpoint | /03L-0:on 800523,prior to Inservice Insp Reactor Vessel Hydro,Testing Revealed That Electromatic Relief Valve High Pressure Sensor IA83B Exceeded Tech Spec Setpoint. on 800531,sensor IA83F Found to Exceed Setpoint | | | 05000219/LER-1980-024, Forwards LER 80-024/03L-0 | Forwards LER 80-024/03L-0 | | | 05000219/LER-1980-025, Forwards LER 80-025/01T-0 | Forwards LER 80-025/01T-0 | | | 05000219/LER-1980-025-01, /01T-0:on 800618,during Surveillance Test, Nonfunctioning Operator Discovered in Valves V-9-12 & V-9-8 Found Leaking.Caused by Component Failure.Defective Valves Replaced & Will Be Inspected.Revised Rept Will Follow | /01T-0:on 800618,during Surveillance Test, Nonfunctioning Operator Discovered in Valves V-9-12 & V-9-8 Found Leaking.Caused by Component Failure.Defective Valves Replaced & Will Be Inspected.Revised Rept Will Follow | | | 05000219/LER-1980-026, Forwards LER 80-026/03L-0 | Forwards LER 80-026/03L-0 | | | 05000219/LER-1980-026-03, /03L-0:on 800709,during Routine Testing Insp of Hydraulic Snubbers Installed in safety-related Sys,Snubber 75/5 Failed to Lock Up in Compression Direction.Caused by Foreign Matl in Snubber Fluid.Snubber Flushed & Refilled | /03L-0:on 800709,during Routine Testing Insp of Hydraulic Snubbers Installed in safety-related Sys,Snubber 75/5 Failed to Lock Up in Compression Direction.Caused by Foreign Matl in Snubber Fluid.Snubber Flushed & Refilled | | | 05000219/LER-1980-027, Forwards LER 80-027/01T-0 | Forwards LER 80-027/01T-0 | |
|