ML19294C235

From kanterella
Jump to navigation Jump to search
Forwards Updated LER 79-087/01T-5
Date released: 11/04/2019 Download: ML19294C235


Updated LER 79-087/01T-5:on 800218,reanalysis of Pipe Supports,Per IE Bulletin 79-14,discovered 30 Supports Require Mods to Meet Requirements.Caused by Inadequate Design.Rework Scheduled During Next Planned Outage
ML19294C236
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 02/25/1980
From: Lancaster K
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19294C236 (3)
Forwards Updated LER 79-087/01T-5
ML19294C234
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/03/1980
From: Hancock J
FLORIDA POWER CORP.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19294C234 (1)