ML19294C011

From kanterella
Jump to navigation Jump to search
Radiological Exposure Reporting Number of Personnel & man-rems by Work & Job Function.Constitutes Part of Annual Rept for 1979
ML19294C011
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 12/31/1979
From:
DAIRYLAND POWER COOPERATIVE
To:
Shared Package
ML19294C009 List:
References
NUDOCS 8003060530
Download: ML19294C011 (3)


Text

,

LA CROSSE BOILING WATER REACTOR ANNUAL REPORT 1979 Provisional Operating License No. DPR-45 Dairyland Power Cooperative 2615 East Avenue South La Crosse, Wisconsin 54601 8003060 3 3 0

q l

I APPENDIX A STANDARD FORMAT FOR REPORTING NUMBER OF PERSONNEL AND MAN-REM BY WORK AND JOB FUNCTION Nsmber of Ps svinnel(: 100 intem) lotal \\ tan Rer's Contra,t horicts Contrn t h orkers h or k 1 Job I u n, tion Sution i ruplo) ces

( nl.t > I mpb.>ces and ()tlu t s station I rerlo> ces L tahly I rnpl< n et s

' a id ()t.s rs Rea, tor operatioia & Sun cill2+.c wn enan,e Penonna 0

0.145 0, erane Pc na 22 39.506 0.867 lieitth Pn> e Per,.,nra t 7

8.633 0.020 sure uwa Pen-ona 18 11.256 0.503 I r;i:.ser ng Perwnnd 7

1.329 0.539 Rounne hnt< nance un:enance Penenna 18 17.988 0.138 0.079 0;ceat.ng Per,onnel 11 2.552 lica:hPh>susPesacnd 6

1.990 Surennory Penanne 4

1.319 t npneenn; Perean :

1 0.206 0.009 In,en ice inspa non Mam:enance Per,onnel 3

11 1.065 14.339 Oreanne Penennel 0

0.114 licatch Pn> s:, s Penonne:

1 0.286 sarenuary Per, anna 3

5.679 0.553 i ng.neenng Perseanet 1

2 0.280 0.357 Sredal \\taintenance O nrenance Peninrei 16 20.136 oper.:nn; Pen y. net 19 8.085 lie ith Pnpo Per-nel 5

3.444 9h

~2 s<.ren:s 'r > Per end 6

5.443 0.323 i noneenng renonnel 3

1 3.569 2.537 g

wa te Iw:cuin '

u nni< nance Pe'rlanna 0

0.123 0.013 Orconng Pe: nnel 6

1.273 ite_t:5 Pia sm Pen mn.i 1

0.257 0

suren nory Pen mn,1 1

1.842 i r.cineenrg Puenna 1

1.290

' p Refadine Ln:ena'nce Penonnel 10 4.501 0.059 operating Pen nnel 20 10.250 ue Arb Pnpus Perwnna 6

2.615 M

Sarenisor> Perwnnel 10 3.504 0.106

,W I noneenn; Per wnnel 5

1.560 0,154 TOT \\L wntenance Penonna 18 11 43.958 0.138 14.490 Orcrann; Perm at 22 61.780 0.867 1: cal:n Phpus Penonnel 7

17.225 0.020 sapennor> Penennet 18 29.043 1.485 i naneenne Pers..nel 7

3 8.234 3.596 Grand t otal 72 14 160.240 0.138 20.458

SPECIAL WORK PERMITS (SWP ' S) > 1.2 MAN-REM 1979 79-007 Replace 1A Forced Circulation Pump Seal-----------

3.590 79-010 Re p a i r C R D Lowe r s - ---- - --- --- --- --- -- -- - - - - - -- 1.851 79-029 Disconnect and Prepare Resin Liner for Shipment--- 2.750 79-063 Repair Cup Seals On Rotoports---------------------

1. 2 35 79-069 Ship Spent Fuel----------------------------------- 2.~778 79-078 Repair Seals On FCP's---------

4.651 79-084 Rig Standpipes On FCP Loops; Fill and Vent Loops"- 1.354 79-093 Head, Etc., R e m ov a l- - - -- - - - - -- - - -- - - - - - - - - - - - - - 1.941 79-094 Move Core Spray Bundle to Fuel Storage Well-------

3.295 79-095 Fuel Handling------- ------- ----------------- --- 9.291 79-096 Remove and Replace Lower CRD's and Torque Test----

3.885 79-102 Remove Lagging From Nozzles and Piping to Rx PCP Loops and U.T. Welds---- ------------- ----------- 5.125 79-103 Remove Lagging From Decay Heat cnd FCP Isolation Bypass----------------------


------------- 9.059 79-114 Drop UCRD, Lap Flange, Replace UCRD---------------

6.452 79-116 ISI of Decay Heat Piping and Boron Inject in Purification Pump Cubicle------------------------- 5.945 79-117 ISI Head Flange, Nuts and Studs, Inspect Shrou d From Flange--------------------------------------- 1.574 79-136 Remove and Replace Peripheral Shroud--------------11.334 79-142 Test Core Spray Bundle, Install Head, Bundle A lter na te Core Sp ray Li ne ------------------------- 3.730 79-150 Repair Decay Heat Pump----- ----------------- ---- 1.970 79-207 Lower and Raise CRD's 10, 19, 20, 21, 27, 28------

2.576 79-208 Drop No. 10 CRD and Reinstall Following Repairs--- 5.710