Text
.
.
$
8(pn ata
uq
jo
UNITED STATES
3
g
, (g n
NUCLEAR REGULATORY COMMISSION
O'
" W/
E
REGION 11
8
gD
101 MARtETTA ST., N.W., sulTE 3100
,,,
p
ATLANTA, G EORGI A 30303
FES - 61980
In Reply Refer To:
RIIJKR
50-491/80-1
50-492/80-1
'i0-493/80-1
Duke Power Company
-
\\TW:
L. C. Dail, Vice President
Design Engineering
0. Box 33189
2
riotte, N C 28242
,
_ntlemen:
This refers to the inspection conducted by J. K. Rausch of this office on
January 9-11, 1980, of activities authorized by NRC Construction Permit Nos.
CPPR-167, CPPR-168 and CPPR-169 for the Cherokee Nuclear facility, and to the
discussion of our findings held with C. B. Aycock at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document.
If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
6,
6
8aouomo 2.\\ 7
.
%
Ibb - 6 733'
Duke Power Company
-2-
.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
.
J. C . B ry-
t, Acting Chief
Reactor Construction and Engineering
Support Branch
Enclosure:
Inspection Report Nos 59-491/80-1
and 50-492/80-1 and 50 '+93/80-1
.