Forwards IE Insp Repts 50-491/80-01 & 50-492/80-01 & 50-493/80-01 on 800109-11.No Noncompliance Noted
ML19294B863
Person / Time
Site: Cherokee  Duke Energy icon.png
Issue date: 02/06/1980
From: Bryant J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Dail L
DUKE POWER CO.
Shared Package
ML19294B853 List:
References
NUDOCS 8003060217
Download: ML19294B863 (2)


See also: IR 05000491/1980001

Text

.

.

$

8(pn ata

uq

jo

UNITED STATES

3

g

, (g n

NUCLEAR REGULATORY COMMISSION

O'

" W/

E

REGION 11

8

gD

101 MARtETTA ST., N.W., sulTE 3100

,,,

p

ATLANTA, G EORGI A 30303

FES - 61980

In Reply Refer To:

RIIJKR

50-491/80-1

50-492/80-1

'i0-493/80-1

Duke Power Company

-

\\TW:

L. C. Dail, Vice President

Design Engineering

0. Box 33189

2

riotte, N C 28242

,

_ntlemen:

This refers to the inspection conducted by J. K. Rausch of this office on

January 9-11, 1980, of activities authorized by NRC Construction Permit Nos.

CPPR-167, CPPR-168 and CPPR-169 for the Cherokee Nuclear facility, and to the

discussion of our findings held with C. B. Aycock at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

6,

6

8aouomo 2.\\ 7

.

%

Ibb - 6 733'

Duke Power Company

-2-

.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

.

J. C . B ry-

t, Acting Chief

Reactor Construction and Engineering

Support Branch

Enclosure:

Inspection Report Nos 59-491/80-1

and 50-492/80-1 and 50 '+93/80-1

.

cc w/ encl:

J. T. Moore, Project Manager

P. O. Box 422

Gaffney, S C 29340

-