ML19294B423

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-213/79-19 on 791107-08 & Notice of Violation
ML19294B423
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 12/28/1979
From: Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML19294B410 List:
References
NUDOCS 8002280336
Download: ML19294B423 (2)


See also: IR 05000213/1979019

Text

-

..

,

UNITED STATES

gn nag

o

NUCLEAR REGULATORY Commission

y

n

REGION I

$

$

$31 PARK AVENUE

KING OF PRUSSI A PENNSYLVANIA 19406

,,,,e

DEC 2 81973

Docket No. 50-213

.

Connecticut Yankee Atomic Power Company

ATTN: Mr. W. G. Counsil

Vice President - Nuclear

Engineering and Operations

P. O. Box 270

-

Hartford, Connecticut 06101

Gentlemen:

Subject:

Inspection 50-213/79-19

This refers to the inspection conducted by Mr. P. Clemons of this office on

November 7-8, 1979 of activities authorized by NRC License No. DPR-61 and to the

discussions of our findings held by Mr. Clemons with Mr. Graves and other members

of your staff at the conclusion of the inspection, and to a subsequent telephone

discussion between Mr. Clemons and Mr. Granados on November 12, 1979.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in the

Notice of Violation, enclosed herewith as Apoendix A.

This item of noncompliance

has been categorized into the levels as described in our correspondence to you

dated December 31, 1974.

This notice is sent to you pursuant to the provisions

of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

Federal Regulations.

Section 2.201 requires you to submit to this office,

within twenty (20) days of your receipt of this notice, a written statement or

explanation in reply including:

(1) corrective steps which have been taken by

you and the results achieved; (2) corrective steps which will be taken to avoid

further items of noncompliance; and (3) the date when full compliance will be

achieved.

In accordance with Section 2.790 of the h l's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosures will

be placed in the NRC's Public Document Room.

If this report contains any infor-

mation that you (or your contractor) believe to be proprietary, it is necessary

that you make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must be accompanied

by an affidavit executed by the owner of the information, which identifies the

document or part sought to be withheld, and which contains a statement of reasons

which addresses with specificity the items which will be considered by the

8002280

jgg

.

.

Connecticut Yankee Atomic Power

Company

2

EEC 2 0 ,pa

Commission as listed in subparagraph (b) (4) of Section 2.790.

The infonnation

sought to be withheld shall be incorporated as far as possible into a

separate part of the affidavit.

If we do not hear from you in this regard

within the specified period, the report will be placed in the Public Document

Room.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

/

-\\

_7c

.

%

-

Geo ge H. Smith, Chief

Fu

Facilities and Material

Safety Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Office of Inspection and Enforcement Inspection

Report Number 50-213/79-19

cc w/encls:

R. Graves, Plant Superintendent

D. G. Diedrick, Manager of Quality Assurance

J. R. Himelwright, Licensing Safeguards Engineer