ML19294B421
| ML19294B421 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 01/15/1980 |
| From: | Galen Smith NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Lundvall A BALTIMORE GAS & ELECTRIC CO. |
| Shared Package | |
| ML19294B422 | List: |
| References | |
| NUDOCS 8002280334 | |
| Download: ML19294B421 (2) | |
See also: IR 05000317/1979022
Text
7%
'
ngo
UNITED STATES
jo
NUCLEAR REGULATORY COMMISSION
?"
,
o
REGION 1
- , $-
631 PARK AVENUE
5,
A
- Trp
.i
!
KING OF PRUS$1 A, PENNSYLVANI A 19406
ggv/
.....
Docket Nos. 50-317
50-318
JAN 151930
Baltimore Gas and Electric Company
AUN: Mr. A. E. Lundvall, Jr.
Vice President, Supply
P. O. Box 1475
Baltimore, Maryland 21203
Gentlemen:
Subject:
Combined Inspection 50-317/79-22 and 50-318/79-21
This refers to the inspection conducted by Mr. J. R. White of this office on
December 6-7, 1979 at the Calvert Cliffs Nuclear Power Station, Lusby, Maryland
of activities authorized by NRC License Nos. DPR-53 and DPR-69 and to the discus-
sio m af our findings held by Mr. White with Mr. L. B. Russell of your staff at
the conclusion of the inspection, and to a subsequent telephone discussion
between Mr. White and Mr. E. T. Riemer on December 11, 1979.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room.
If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must be
accompanied by an affidavit executed by the owner of the information, which
identifies the document or part sought to be withheld, and which contains a
statement of reasons which addresses with specificity the items which will be
considered by the Comission as listed in subparagraph (b) (4) of Section
2.790.
The information sought to be withheld shall be incorporated as far as
possible into a separate part of the affidavit.
If we do not hear from you in
this regard within the specified period, the report will be placed in the Public
Document Room.
8002280
.
.
Baltimore Gas and Electric Company
2
JM 15 !Z]
No reply to this letter is required; however, should you have any questions
concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
'
,;
'
,.
'.
l
i
'
~ L? ,
h)
'
George H. Smith, Chief
FueT Facility and Materials Safety
Branch
Enclosure: Office of Inspection and Enforcement Combined Inspection
Report Numbers 50-317/79-22 and 50-318/79-21
cc w/ enc 1:
R. M. Douglass, Manager, Quality Assurance
L. B. Russell, Chief Engineer
W. Gibson, General Supervisor, Operations QA
R. C. L. Olson, Senior Engineer
K. H. Sebra, Principal Engineer