__
_[
tk8 "800
UNITED STATES
9
- p
jo,,
NUCI EAR REGULATORY COMMISSION
gg
o
REGloN il
5
$
101 MARIETTA sTR EET, N.W.
t
[
ATLANTA, GEORGI A 30303
o
~ % , , , ,***
FEB 0 21979
in Reply Refer To:
RII:5,"
50-302/79-1
Florida P,wer Corporation
AITN:
Mr. W. P. Stewart, Director
Power Production
P. O. Box 14042, Mail Stop C-4
St. Petersburg, Florida 33733
Gentlemen:
This refers to the inspection conductec by Mr. S. C. Ewald of this office on
January 8-11, 1979, of activities autuorized by NRC Operating License No.
DPR-72 for the Crystal River Unit 3 facility, and to the discussion of our
findings held with Mr. G. P. Beatty, Jr. , at the conclusion of the inspection.
Areas examined during the irspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspector.
Within the scope of t5is inspection, no items of noncompliance were disclosed.
We have examined actions you have taken with regard to previously reported
unresolved items.
The status of these items is discussed in the enclosed
report.
Two new unresol'ied itec resulted from this inspection and are discussed in the
en ' sed repor
These items will be examined during subsequent inspections.
"
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room. If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20
days to this office to withhold such information from public disclosure. Any
such application must include a full statement of the reasons on the basis of
which it is claimed that the information is proprietary, and should be pre,,ared
so that proprietary information identified in the application is contuned in
a separate part of the document. If we do not hear from you in this regard
within the specified period, the report will be placed in the Public Document
Room.
7 9 0 313 0 0c;8
.. .
FEB 0 21979
.
Florida Power Corporation
-2-
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
'
, cld
Jack T. Sutherland, Chief
Fuel Facility and Materials
Safety Branch
Enclosure:
Inspection Report No. 50-302/79-1
cc w/ enc 1:
Mr. G. P. Beatty, Jr.
Nuclear Plant Superintendent
P. O. Box 1228
Crystal River, Florida 32629
.
D
&