ML19294A722
| ML19294A722 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 02/01/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Jackie Jones CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML19294A723 | List: |
| References | |
| NUDOCS 7903130005 | |
| Download: ML19294A722 (2) | |
See also: IR 05000325/1979004
Text
e
e
,
[gR R800g'o
UNITED STATES
NUCLEAR REGULATORY COMMISSION
gO 3M.$
a
,,
,
R EGloN 11
jc
g
E
M
g
101 M ARIETT A sTR EET, N.W.
..
I
E
ATLANTA, GEORGIA 30303
% j,, +*
FEB 011979
In Reply Refer To:
RII:JJB
50-325/79-04
Carolina Power and Light Company
ATTN:
Mr. J. A. Jones
Executive Vice President
Engineering, Construction
and Operations
336 Fayetteville Street
Raleigh, North Carolina 27602
Gentlemen:
This refers to the inspection conducted by Mr. J. J. Blake of this office on
January 15-19, 1979, of activities authorized by NRC License No. DPR-71 for
the Brunswick Steam Electric Plant Unit 1 facility, and to the discussion of
our findings held with Messrs. Banks and Tollison at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room. If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within
20 days to this office to withhold such information from public disclosure.
,
Any such application must include
1.
full statement of the reasons on the
basis of which it is claimed that the information is proprietary, and should
be prepared so that proprietary infonnation identified in the application is
contained in a separate part of the document. If we do act hear from you in
this regard within the specified period, the report will be placed in the
Public Document Room.
79031300c6
.. .
..
.
,
FEB 011379
'
,
Carolina Power and Light Company
-2-
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
!
.
Charles E. M rphy Chief
Reactor Construction and Nuclear
Support Branch
Enclosure:
Inspection Report No. 50-325/79-04
cc w/ encl:
Mr. A. C. To11ison, Jr.
Plant Manager
Box 458
Southport, North Carolina 28461
.