/ o arog'o, UNITED STATES TlC NUCLEAR REGULATORY COMMISSION o
E REGION lli o,,
799 ROOSEVELT ROAD e
g*'
GLEN ELLYN, ILLINOIS 60137 DEC 2 81979 State of Illinois Department of Public Health ATTN:
Mr. Gary N. Wright, Chief Division of Nuclear Safety 535 West Jefferson Street Springfield, IL 62761 Gentlemen:
The enclosed IE Information Notice No. 79-34 titled " Inadequate Design of Safety-Related Heat Exchangers" was sent to the following licensees on December 28, 1979.
American Electric Power Service Corporation Indiana and Michigan Power Company D. C. Cook 1, 2 (50-315, 50-316)
Cincinnati Gas & Electric Company Zimmer (50-358)
Cleveland Electric Illuminating Company Perry 1, 2 (50-440, 50-441)
Commonwealth Edison Company Braidwood 1, 2 (50-456, 50-457)
Byron 1, 2 (50-454, 50-455)
Dresden 1, 2, 3 (50-10, 50-237, 50-249)
La Salle 1, 2 (50-373, 50-374)
Quad-Cities 1, 2 (50-254, 50-265)
Zion 1, 2 (50-295, 50-304)
Consumers Power Company Big Rock Point (50-155)
Midland 1, 2 (50-329, 50-330)
Palisadas (50-255)
Dairyland Power Cooperative LACBWR (50-409)
Detroit Edison Company Fermi 2 (50-341)
Illinois Power Company Clinton 1, 2 (50-461, 50-462) 1793 184 800124o sic gg
DEC 2 81979 State of Illinois -
Iowa Electric Light & Power Company Duane Arnold (50-331)
Northern Indiana Public Service Company Bailly (50-367)
Northern States Power Company Monticello (50-263)
Prairie Island 1, 2 (50-282, 50-306)
Ohio Edison Company Erie 1, 2 (50-580, 50-581)
Public Service of Indiana Marble Hill 1, 2 (50-546, 50-547)
Toledo Edison Company Davis-Besse 1 (50-346)
Union Electric Company Callaway 1, 2 (50-483, 50-486)
Wisconsin Electric Power Company Point Beach 1, 2 (50-266, 50-301)
Wisconsin Public Service Corporation Kewaunee (50-305)
Sincerely, j
/
orothy E.
ar $11, Acting Ch Administrative Branch
Enclosure:
IE Information Notice No. 79-34 cc w/ encl:
Mr. D. W. Kane, Sargent & Lundy Central Files Reproduction Unit NRC 20b Local PDR NSIC TIC 1793 185
UNITED STATES SSINS No.:
6870 NUCLEAR REGULATORY COMMISSION Accession No.:
OFFICE OF INSPECTION AND ENFORCEMENT 7910250517 WASHINGTON, D.C.
20555
.q m
December 27, 1979 3oj 2J IE Information Notice No. 79-34 INADEQUATE DESIGN OF SAFETY-RELATED HEAT EXCHANGERS Tennessee Valley Authority (TVA) submitted an initial 50.55(e) report on October 25, 1979, that identified defects in the four Containment Spray (CS) heat exchangers at the Sequoyah facility.
The heat exchanger tube bundles were damaged by excessive vibrations of the tubes against each other.
These vibrations were caused by a support arrangement that allows excessive unsupported tube lengths.
The large amplitude tube vibration has resulted in reductions in wall thickness and some tube leakage.
The CS heat exchangers at Sequoyah had only been in operation for a short period of time prior to the failure being detected.
These heat exchangers were manufactured by Industrial Process Engineers, Inc.,
(IPE), a vendor now out of business.
The Component Cooling Water (CCW) heat exchangers at the Sequoyah facility were also made by IPE.
TVA has identified some reduction in wall thickness and minor tube leakage in the CCW heat exchangers.
The licensee plans to plug the damaged tubes on the CS heat exchangers and " stake" (support) the tube bundles to prevent further damage.
Further corrective action is under review by the licensee.
The following data applies to the CS heat exchangers:
Manfacturer:
Industrial Process Engineers, Inc.
Type:
CFU (Special)
Size:
55-342 Serials:
6662-3; 6662-2 6663-1; 6663-2 This Information Notice is provided as an early notification of a possibly signi-ficiant matter that is still under review by the NRC staff.
It is expected that recipients will review the information for possible applicability to their facilities.
No specific action or response is requested at this time.
If NRC evaluations so indicate, further licensee actions may be requested or required.
No written response to this Information Notice is required.
If you have any questions regarding this matter please contact the Director of the appropriate NRC Regional Office.
Enclosure:
List of Recently Issued IE Information Notices 1793 186
IE Information Notice No. 79-34 Enclosure December 27, 1979 RECENTLY ISSUED IE INFORMATION NOTICES Information Subject Date Issued To Notice No.
Issued 79-33 Improper Closure of 12/21/79 All power reactor facilities Primary Containment holding OLs and cps Access Hatches 79-32 Separation of Electrical 12/21/79 All power reactor facilities Cables for HPCI and ADS holding OLs and cps 79-31 Use of Incorrect Amplified 12/13/79 All holders of power reactor Response Spectra (ARS)
OLs and cps 79-30 Reporting of Defects and 12/6/79 All power reactor faciliti<
Noncompliance, 10 CFR Part 21.
holding OLs and cps and vendors inspected by LC'.
79-29 Loss of NonSafety-Related 11/16/79 All power reactor facilities Reactor Coolant System holding OLs or cps Instrumentation During Operation 79-28 Overloading of Structural 11/16/79 All power reactor facilities Elements Due to Pipe Support with an OL or CP Loads 79-27 Steam Generator Tube 11/16/79 All power reactor facilities Ruptures At Two PWR holding OLs and cps Facilities79-12A Attempted Damage To New 11/9/79 All Fuel Facilities, Fuel Assemblies research reactors, and power reactors with an OL or CP 79-26 Breach of Containment 11/5/79 All power reactor facilities Integrity holding OLs and cps 79-25 Reactor Trips At Turkey 10/1/79 All power facilities with Point Units 3 And 4 an OL or a CP 1793 187