Forwards IE Insp Rept 50-334/79-18 on 790820-24 & Notice of Violation
ML19291C323
Person / Time
Site: Beaver Valley
Issue date: 11/23/1979
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Dunn C
DUQUESNE LIGHT CO.
Shared Package
ML19291C324 List:
References
NUDOCS 8001240196
Download: ML19291C323 (2)


See also: IR 05000334/1979018

Text

Y&

}" "' coq

[m

k

UNITED STATES

NUCLEAR REGULATORY COMMISSION

y,

5,

o

7('

E

REGION I

,8

631 PARK AVENUE

o'

s

k . . . . . ,o#

KING oF PRUSSIA, PENNSYLVANIA 19406

Docket No. 50-334

Duquesne Light Company

ATTN:

Mr. C. N. Dunn

Vice President

Operations Division

435 Sixth Avenue

Pittsburgh, Pennsylvania 15219

Gentlemen:

Subject:

Inspection No. 50-334/79-18

This refers to the inspection conducted by G. Napuda of this office on August

20-24, 1979, at the Beaver Valley Power Station, Unit 1 site in Shippi~ngport,

Pennsylvania, and your corporate offices, of activities authorized by NRC License

No. DPR-66 and to the discussions of our findings held by G. Napuda with Mssrs.

E. J. Woolever and G. Moore of your staff at the conclusion of the inspection,

and to subsequent telephone discussions between G. Napuda of this office and

G. Ewing on August 28, 1979 and betwean D. Beckman of this office and Mr. J.

Werling on August 29, 1979.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Based on the results of this inspection, it appears that certain of your activi-

ties were not conducted in full compliance with NRC requirements, as set forth

in the Notice of Violation, enclosed herewith as Appendix A.

These items of

noncompliance have been categorized into the levels as described in our corre-

spondence to you dated December 31, 1974.

This notice is sent to you pursuant

to the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to

this office, within twenty (20) days of your receipt of this notice, a written

statement or explanation in reply including:

(1) corrective steps which have

been taken by you and the results achieved; (2) corrective steps which will be

taken to avoid further items of noncompliance; and (3) the date when full com-

pliance will be achieved.

In addition, these and other areas of concern were further discussed with you

and members of your staff during an enforcement conference in the Region I office

on September 25, 1979.

At that time we also expressed our concern with regard

to the implementation of your management control systems that permitted-them to

occur.

Consequently, in your reply, you should describe in particular those

actions taken or planned that will provide assurance that previously accomplished

1795

023

019 C

4

80012

.

.

NOV 2 31979

'

Duquesne Light Company

2

~

design work has complied with the necessary requirements, and the actions taken

or planned that will. improve your management control systems in the area of

Design Changes and Modification Control.

Certain of your activities appear to be in conflict with the commitments made

in your letter C. N. Dunn to B. H. Grier, dated November 28, 1978, as modified

by Inspection and Enforcement Report 334/79-06.

With respect to this apparent

conflict which is discussed in the enclosed inspection report as a deviation,

please include in your response your comments concerning this item.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosures

will be placed in the NRC's Public Document Room.

If this report contains any

information that you (or your contractor) believe to be proprietary, it is neces-

sary that you make a written application within 20 days to this office to with-

hold such information from public disclosure.

Any such application must be

accompanied by an affidavit executed by the owner of the information, which iden-

tifies the document or part sought to be withheld, and which contains a statement

of reasons which addresses with specificity the items which will be considered

by the Commission as listed in subparagraph (b) (4) of Section 2.790.

The infor-

mation sought to be withheld shall be incorporated as far as possible into a

separate part of the affidavit.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

W

v g CaE

-

Boyce H. Grier

Director

Enclosures:

1.

Appendix A, Notice of Violation

2.

Office of Inspection and Enforcement

Inspection Report No. 50-334/79-18

cc w/ encl:

F. Bissert, Technical Assistant Nuclear

R. Washabaugh, QA Manager

J. Werling, Station Superintendent

G. Moore, General Superintendent, Power Stations Department

J. J. Carey, Nuclear Technical Assistant

R. Martin, Nuclear Engineer