ML19291C312
| ML19291C312 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 12/17/1979 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Davidson D CLEVELAND ELECTRIC ILLUMINATING CO. |
| Shared Package | |
| ML19291C313 | List: |
| References | |
| NUDOCS 8001240170 | |
| Download: ML19291C312 (2) | |
See also: IR 05000440/1979011
Text
/
'o
UNITED STATES
8'
I
NUCLEAR REGULATORY COMMISSION
) ,,
'-c
REGION ill
,
%
y[
799 ROOSEVELT ROAD
o,
GLEN ELLYN,ILLINOls 60137
L
1 7 1979
Docket No. 50-440
Docket No. 50-441
The Cleveland Electric Illuminating
Company
ATTN: Dalwyn R. Davidson
Vice Pre,sident - System
Engineering and Construction
Post Office Box 5000
Cleveland, OH 44101
Gentlemen:
This refers to the inspection conducted by Mr. J. E. Konklin of this
office on November 14-15, 1979, of activities at the Perry Nuclear Plant
Project, Units 1 and 2, authorized by NRC Construction Permits No. CPPR-148
and No. CPPR-149 and to the discussion of our findings with Messrs. A. Kaplan
and W. Kacer and others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined dur-
ing the inspection. Within these areas, the inspection consisted of a
selective examination of procedures and representative records, observa-
tions, and interviews with personnel. The enclosed report also provides
the minutes of the management meeting on November 19, 1979, between you
and members of your staff and Mr. Keppler of Region III and members of
his staff.
No items of noncompliance with NRC requirements were identified during
the course of this inspection.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be olaced in the NRC's Public Document
Room, except as follows.
If this report contains information that you or
your contractors believe to be proprietary, you must apply in writing to
this office, within twenty days of your receipt of this letter, to with-
hold such information from public disclosure. The application must in-
clude a full statement of the reasons for which the information is con-
sidered proprietary, and should be prepared so that proprietary informa-
tion identified in the application is contained in an enclosure to the
application.
m4 %7
.
8001240 } } Q
.
The Cleveland Electric
-2-
.
Illuminating Company
We will gladly discuss any questions you have concerning this
inspection.
Sincerely,
k
M
Gaston Fiorelli, Chief
Reactor Construction and
Engineering Support Branch
Enclosure:
IE Inspection Rpts
No. 50-440/79-11
and No. 50-441/79-11
cc w/encls:
Central Files
Reproduction Unit NRC 20b
Local PDR
Harold W. Kohn, Ohio
Power Siting Commission
Mr. Daniel D. Wilt
Attorney