ML19291C159
| ML19291C159 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 12/28/1979 |
| From: | Robert Carlson NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Tallman W PUBLIC SERVICE CO. OF NEW HAMPSHIRE |
| References | |
| NUDOCS 8001230044 | |
| Download: ML19291C159 (1) | |
Text
,(e5f "*Q),
T.?c UNITED STATES y j ) W (,g 3-> (
NUCLEAR REGULATORY COMMISSION 3]' \\f7
[
631 PARK AVENUE
/
E REGION 1 o
6, 'O
,o#
KING OF PRUSSIA, PENNSYLVANIA 19406 S
Docket Nos. 50-443 50-444 DEC 2 8 im Public Service Company of New Hampshire ATTN: Mr. W. C. Tallman President 1000 Elm Street Manchester, New Hampshire Gentlemen:
Subject:
Discrepancy in Drawings with respect to Design Calculation Concrete Reinforcement Requirements for the Control and Diesel Generator Buildings Thank you for your letter, referenced above, which forwarded a final report pursuant to 10 CFR 50.55(e) regarding the subject matter.
Your report will be reviewed and evaluated, and should we require additional information concerning this matter, we will contact you.
Your cooperation with us is appreciated.
Sincerely, liffi Robert T. Carlson, Chief i Reactor Construction and Engineering Support Branch cc:
John DeVincentis, Project Manager 1791 163 09.I s0012ao
s t I 1
PUBLIC SERVICE Companyof New Hempehre SEABROOK STATION Engineering Office:
20 Turnpike Road Westborough, MA 01581
' December 6, 1979 SBN-107 T.F. Q 2.2.2 U.S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 Attention: Office of Inspection and Enforcement
Reference:
1.
Docket No. 50-443 and 50-444 2.
Telecon of 11/ 6/79 between J. Mattia NRC and John DeVincentis YAEC
Subject:
10 CFR 50.55 (e) Report on Discrepancy in Drawings with Respect to Design Calculation Concrete Reinforcement Requirements for the Control and Diesel Generator Buildings
Dear Sir:
The enclosed report is submitted in accordance with the requirements of 10 CFR 50.55 (e). This deficiency was reported to the Region I Inspection and Enforcement office, by telephone, on 11/ 6/79.
Very truly yours, yw John DeVincentis Project Manager po JDv t1a Enclosure Di.. -.f In.p...i...
f _.
x v
U.S. NRC, Washington, D.C.
A 1791 164
1 3
PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE SEABROOK STATION FINAL REPORT EE DISCREPANCY IN DRAWINGS WITH RESPECT TO DESIGN CALCULATION CONCRETE REINFORCEMENT REQUIREMENTS FOR THE CONTROL AND DIESEL GE'.IERATOR BUILDINGS
\\
T q\\'
t i
A u6 DUPLICATE DOCUMENT Entire document previously entered into system under:
December 5, 1979 ANO
/ /
No. of pages:
-