Ack Receipt of Util Forwarding Final Deficiency Rept Re Discrepancy in Drawings W/Respect to Design Calculation Concrete Reinforcement Requirements for Control & Diesel Generator Bldgs
ML19291C159
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 12/28/1979
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Tallman W
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
References
NUDOCS 8001230044
Download: ML19291C159 (1)


Text

,(e5f "*Q),

T.?c UNITED STATES y j ) W (,g 3-> (

NUCLEAR REGULATORY COMMISSION 3]' \\f7

[

631 PARK AVENUE

/

E REGION 1 o

6, 'O

,o#

KING OF PRUSSIA, PENNSYLVANIA 19406 S

Docket Nos. 50-443 50-444 DEC 2 8 im Public Service Company of New Hampshire ATTN: Mr. W. C. Tallman President 1000 Elm Street Manchester, New Hampshire Gentlemen:

Subject:

Discrepancy in Drawings with respect to Design Calculation Concrete Reinforcement Requirements for the Control and Diesel Generator Buildings Thank you for your letter, referenced above, which forwarded a final report pursuant to 10 CFR 50.55(e) regarding the subject matter.

Your report will be reviewed and evaluated, and should we require additional information concerning this matter, we will contact you.

Your cooperation with us is appreciated.

Sincerely, liffi Robert T. Carlson, Chief i Reactor Construction and Engineering Support Branch cc:

John DeVincentis, Project Manager 1791 163 09.I s0012ao

s t I 1

PUBLIC SERVICE Companyof New Hempehre SEABROOK STATION Engineering Office:

20 Turnpike Road Westborough, MA 01581

' December 6, 1979 SBN-107 T.F. Q 2.2.2 U.S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 Attention: Office of Inspection and Enforcement

Reference:

1.

Docket No. 50-443 and 50-444 2.

Telecon of 11/ 6/79 between J. Mattia NRC and John DeVincentis YAEC

Subject:

10 CFR 50.55 (e) Report on Discrepancy in Drawings with Respect to Design Calculation Concrete Reinforcement Requirements for the Control and Diesel Generator Buildings

Dear Sir:

The enclosed report is submitted in accordance with the requirements of 10 CFR 50.55 (e). This deficiency was reported to the Region I Inspection and Enforcement office, by telephone, on 11/ 6/79.

Very truly yours, yw John DeVincentis Project Manager po JDv t1a Enclosure Di.. -.f In.p...i...

f _.

x v

U.S. NRC, Washington, D.C.

A 1791 164

1 3

PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE SEABROOK STATION FINAL REPORT EE DISCREPANCY IN DRAWINGS WITH RESPECT TO DESIGN CALCULATION CONCRETE REINFORCEMENT REQUIREMENTS FOR THE CONTROL AND DIESEL GE'.IERATOR BUILDINGS

\\

T q\\'

t i

A u6 DUPLICATE DOCUMENT Entire document previously entered into system under:

December 5, 1979 ANO

/ /

No. of pages:

-