Forwards IE Insp Repts 50-369/79-34 & 50-370/79-20 on 790911-14 & Notice of Deviation
ML19291C090
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 10/19/1973
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19291C080 List:
References
791019-01, 791019-1, NUDOCS 8001180422
Download: ML19291C090 (2)


See also: IR 05000369/1979034

Text

.

.

.

o

UNITED STATES

8 ' ),

NUCLEAR REGULATORY COMMISSION

g

.e

REGION il

8

o

101 MARIETTA ST., N.W., SUITE 3100

          • p*

ATLANTA, G EORGIA 3o303

OCT 191975

In Reply Refer To:

RII:WHM

50-369/79-34

50-370/79-20

Duke Power Company

ATTN:

W. O. Pa rker, Jr.

Vice President, Steam Production

P. O. Box 2178

Charlotte, NC 28242

Gentlemen:

This refers to the inspection conducted by W.11. Miller, Jr. , of this office on

Septeciber 11-14, 1979, of activities authorized by NRC Construction Permit Nos.

CPPR-83 and CPPR-84 for the McGuire facility, and to the discussion of our

findings held with G. W. Grier at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Three new unresolved items resulted from this inspection and are discussed in the

enclosed report. These items will be examined during subsequent inspections.

Within the scope of this inspection, no items of noncompliance were disclosed.

During the inspection it was found that certain activities under your license

appear to deviate from commitments to the Commission and have safety significance.

These items are identified in the Notice of Deviation enclosed herewith as

Appendix A.

Please provide us in writing within 20 days of your receipt of this

letter your comments including a description of corrective actions that have

been or will be taken, corrective actions which will be taken to avoid further

deviations, and the date corrective actions were or will be completed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC:s Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document hoom.

1790 209

-

AA

8001180

.

.

.

Duke Power Company

-2-

OCT 191979

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

-

.

_

f

..rf* ' ')

C. E. Murphy, Chie

Reactor Construction and Engineering

Support Branch

Enclosures:

1.

Appendix A, Notice of Deviation

2.

Inspection Report Nos. 50-369/79-34

and 50-370/79-20

cc w/ enc 1:

M. D. McIntosh, Plant Manager

P. O. Box 488

Cornelius, NC 28031

J. C. Rogers, Project Manager

P. O. Box 33189

Charlotte, NC 28242

.