Text
It
[(c# nano %
- o, UNITED STATES 4
g NUCLEAR REGULATORY COMMISSION dy[e 3
REGION I 0,
631 PARK AVENUE
- ,d KING OF PRUSSIA, PENNSYLVANIA 19406 Docket No. 50-293 DEC 0 71979 Boston Edison Company M/C Nuclear ATTN:
Mr. G. Carl Andognini, Manager Nuclear Operationt Department 800 Boylston Street Boston, Massachusetts 02199 Gentlemen:
The enclosed IE Bulletin No. 79-28, is forwarded for action. A written response is required.
If you desire additional information regarding this matter, please contact this office.
Sincerely, f ll7MY e
Boyce H. Grier
~ Director
Enclosures:
1.
List of Recently Issued IE Bulletins CONTACT:
S. D. Ebneter (215-337-5296) cc w/encls:
P. J. McGuire, Pilgrim Station Manager i790327 m
d 7012190 J
ENCLOSURE 1 UNITED STATES SSINS No.: 6820 NUCLEAR REGULATORY COMMISSION Accession No.:
0FFICE OF INSPECTION AND ENFORCEMENT 7910250505 WASHINGTON, D.C.
20555 IE Bulletin No. 79-28 Date: December 7, 1979 Page 1 of 2 POSSIBLE MALFUNCTION OF NAMCO MODEL EA180 LIMIT SWITCHES AT ELEVATED TEMPERATURES Description of Circumstances:
The NRC has been recently advised through a 10 CFR 21 report from NAMC0 Controls that a malfunction of a NAMCO Model EA180 stem mounted limit switch (SMLS) occurred at the Cooper Nuclear Station.
Investigation into the switch failure by the licensee revealed yellow and brown " crystal-like" resin deposits on the internal components of the switch. The affected switch is located inside the drywell containment at this facility and was being used as the replacement switch Jor an unqualified SMLS previously identified in IE Bulletin Nos. 78-04 and 7'-01.
According to the manufacturer, the problem was traced to a batch of top cover gaskets of which some were over-impregnated and insufficiently heat cured.
It has been determined that this condition can leave an uncured residue of " Loctite" in the gasket, which vaporizes at sustained temperatures above 175 F.
To correct the problem, the manufacturer has revised production techniques beginning September 1979 in order to better control the impregnation process and to properly heat cure the gaskets following impregnation.
This problem is unique to all NAMC0 Model EA180 series switches received by licensees after March 1, 1979. According to the manufacturer, the suspect switches can be identified by checking the oate code which is a 4 digit number stamped on the conduit boss of the switch housing. NAMC0 recommends that any EA180 series switch with a date code between 02-79 through 08-79 should have its top cover gasket replaced.
Also, licensees should request from their suppliers of equipment on which NAMCO EA180 series switches are used that they check their inventory and replace top cover gaskets on switches date coded between 02-79 through 08-79.
The enclosed letter from NAMCO further describes the high-temperature environ-mental problem with the top cover gaskets used in their EA180 switches and provides recommendations to ccrrect the problem.
According to NAMCO, this letter has been sent to each customer who was shipped EA180 switches between February 21, 1979, and August 24, 1979.
Action to be Taken by Licensees of Power Reactor Operating Facilities and Holders of Construction Permits:
DUPLICATE DOCUMENT Entire document previously entered into system under:
ANO 1790 328 No. of pages:
-