Text
75G UNITED STATES
/'paarc,#'o,t o
NUCLEAR REGULATORY COMMISSION 8
REGloN IV 611 RY AN PLAZA DRIVE, SUITE 1000 I*
I. 'o "y
ARLINGTON, TEXAS 76012 P, t[r,
%'A g
%, +,v,,, e November 26, 1979 In Reply Refer To:
RIV Docket No.
STN 50-482/IE Circular No. 79-24 Kansas Gas & Electric Co.
Attn:
Mr. Glenn L. Koester Vice President-Operations Post Office Box 208 Wichita, Kansas 67201 Gentlemen:
The enclosed IE Circular No. 79-24 is forwarded to you for information. No written response is required.
Should you have any questions related to your understanding of the recommendations on this matter, please contact this office.
Sincerely, f,Y k
W Kar V. Seyfrit ij Director
Enclosures:
1.
IE Circular No. 79-24 2.
List of Recently Issued IE Circulars cc: w/ enclosures Messrs. Nicholas A. Petrick, SNUPPS D. T. McPhee, Kansas City Power and Light Company Gerald Charnoff, Shaw, Pittman, Potts & Trowbridge E. W. Creel, Kansas Gas and Elect.ric. Company '
[790 240
~
~
79UH 9 0 O5d
Accession No: 7910250492 SSINS No. 6830 UNITED STATES NUCLEAR REGULATORY COSD11SSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON,-D.C.
20555 IE Circular No. 79-24 Date: November 26, 1979 Page 1 of 3 PROPER INSTALLATION AND CALIBRATION OF CORE SPRAY PIPE BREAK DETECTION EQUIPMENT ON BURS Description of Circumstances:
During 1976 the Iowa Electric Light and Power Company identified and corrected a potential problem involving the Core Spray (CS) pipe break detection system at the Duane Arnold Energy Center (DAEC). The problem relates to the setpoint, function, and installation of the differential pressure (dp) instrument which monitors for a CS pipe break that is located in the annulus area of the reactor vessel (i.e., located outside the core shroud but inside the reactor vessel).
The irstalled instrument, range of 0 - 24 psid, was found deflecting downscale (i.e., reading negative psid) during operation.
The licensee's investigation of the downscale deflection revealed that the original piping arrangement and calibration did not adequately take into the effect of density changes of the water in the pressure leg connections.
account The original installation had the high pressure side of the dp instrument (see attached Figure 1) connected to the reference leg in the vessel (Figure 1 Connection X) and the low pressure side to the core spray piping outside the vessel but inside the drywell (Figure 1 Connection Y).
With the piping intact, this arrangement senses the pressure difference between bottom and top of core. Wi,th a break in CS piping in the annulus area the instrument then senses the additional pressure drop across the separators (dp N 7 psi additional) and dryers (d p % 7 inches water).
This installation was in accordance with GE design requirements.
Also in accordance with GE instructions the calibration of the dp instrument was performed with the reactor in the cold condition and the alarm was set to trip at 5 psid increasing. Because of this cold calibration the dp instrument then indicated full downscale negative during operation. This negative dp was due to the heat up of the reference leg (Figure 1 Connection X) which caused the fluid density to decrease as the plcnt reached hot conditions.
The magnitude of thi was determined 's be about 3.5 psid discussed below.
DUPLICATE DOCUMENT Entire document previously entered into system under:
.,g }
ANO No. of pages: