ML19291B690
| ML19291B690 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 02/07/1972 |
| From: | Morris P US ATOMIC ENERGY COMMISSION (AEC) |
| To: | John Miller METROPOLITAN EDISON CO. |
| Shared Package | |
| ML19291B691 | List: |
| References | |
| NUDOCS 7911110166 | |
| Download: ML19291B690 (3) | |
Text
,..
. - ~ - - - -.
n--.,.n 3.;"7M @,.,
,w-,
[,
T A_
A*1-*---.-
.._a
.__s..
,_g February 7, 1972 Docket Nos, as.d 30-320 gysON Metropolitan Edison Coctpany ATIN: Mr. John G. Miller Vice President P. O. Box 542 Reading, Pennsylvania 19603 Gentlemen:
On November 29, 1971, the Director of Regulation of the Atomic Energy Concission issued an Order to Show Cause directed to you to show cause why the construction activities involving the off-site portion of the transmission lines for Three Mile Island Nuclear Generating Station Unit 2 should not be suspended pending completion of a review of the environmental impact of such activities under the Commission's regula-tions implesmenting the National Environmental Policy Act of 1969 (NEPA),
10 CFR Part 50, Appsmdiv D.
A determination that such ' construction activities should be suspended pending completion of the NEPA environmental review had been mde by the Director of Regulation upon consideration of your written statenent of reasons (with supporting factual submission) dated October 19, 1971, why the construction permits should not be suspended, in whole or in part, pending completion of the NEPA environmental review, and upon consideration and balancing of the criteria set out in section E.2 of Appendix D of 10 CPR Part 50.
The reasons for the determination were set out in a document entitled " Discussion and Findings by the Division of Reactor Licensing, U. S. Atomic Energy Commission, Relatic.g to Consideration of Suspension Pending NEPA Environmental Review of the Provisional Construction Permits for the Three Mile Island Nucicar i
Generating Station, Units 1 and 2, Metropolitan Edison Company, and Jersey Central Power and Light Company, AEC Docket Nos. 50-289 and
" ~~~ 50-320,' November ~ 22, 1971," which was appended to a d made a part of n
the Order to Show Cause, The Order to Show Cause, the Determination I
and the Discussion and' 71ndings were sent to you on Novetber 29, 1971.
The Older to Show Causa provided that an answer night be filed and a hearing demanded within thirty (30) days of the date of the Order to Show Cause. On December 28, 1971 you filed an answer requesting that i'
OmCE >
SURNAME >
[
DATE > l.
. - ~ ~ - _ _
3 Foran AEC-5 ta (Rev. 9-53) AECM 0240 o u s cowwNr P*Nrwa onca 8 971 -446 -t 9 4 1573 016 4911110/fg
(,.
p.
c --
.m--,------.---.
....--~...~~n~
~-
Q"y m
o
(
jee wM.$ A
,.s Heeropolitan Edison Company
- the Order to Show Cause be reconsidered and also filed a Supplementary Statament of Facts Relating to the Transmission Lines for Three Mile Islead Nuclear Generating Station, Unit 2.
3,,
l Upon consideration of your answer, it has been determined that the Director of Regulation's determination should be modified so as to i
provide for the suspension of construction activities involving the
.off-site portion of only the Juniata transmission line for the Three Mile Island Noelear Generating Station, Unit 2, pending completion of
.. the NEPA envirnemastal review relating to these matters. The Director of Regulation has ordered suspension of the construction activities stated abo..
.c In view of the above, and pursuant to the Commission's regulations in i
10 CYR Farts 2 sad 50, Appendix D, the Commission has forwarded the enclosed A==nded Determination to Suspend Certain Construction Activities Pending Complation of IIPA Environmental Review, to the Federal Register for publication.. The enclosed Order by the Commission directs that
~
., construction activitias involving ~the off-site portion of the Juniata transmission line for the Three Mile Island Nuclear Generating Station,
, ~ Unit 2, shall be -
-4' entil further order of.the Cr==4=sion.
i 7
3 7,.
1
\\
,' Sincerely, l
'{-
'".,! s.y /.,
N
/s/ F. Schroeder
^ '. '. ~
_7,,-
~
- ', '. f for Peter A. Morris, Director i
N.
Division of Reactor Licensing Emelosures:
T DISTRIBUTION:
1.
Ammedad Determinmeien Docket File (2) l2. Supplement to Discussion and Findings AEC PDR 3.
Order Suspanding Certain Construction Activities Local PDR DRL R/F ce w/m=M at i: -
See next page-
- PWR-2 R/F"
.e
.EGCase.
-DKartalia, OCC RSBoyd CO (2)
I NDube, DRL (w/3 encls)
RCDeYoung DJSkovholt PFCollins WKaras (2)
HSchierling CRESS #02 omes> _.D Es DR1 nun ?
nut An2P.WRs
.. OGC
,.DRL DR
/k 2
!M/C#840-400,etc aras:clsI RCUekog;,tg pagdM4 e r w,,,,t g.
ong susmaam >
l2/4/72
.274772 2/
/72 2/"j/72 2/
/7_2
/ 7 b2.
7/
k L_
DATE >
6......_--..
Form AEC-sts (Rav.9-53) ABCM 0240 e u s oownweaawr wwTtwo omes. i s7 s 4:e-4s e
.,w.,.
.n,..~
n.n
- - ~ - -
r.
.. ~ _. -
,.pm m m
3-
- Ioo ci J.
o Metropolitan EAfana Company 3-ec w/ema.ls:
General Public Utilities Service Corporation ATIN: George F. Bierman Project Manager 260 Cherry Hill Road Parsippany, New Jersey 07054 General Public Utilities Service Corporation ATIN: John L. Thorpe, Manager Safety and T.f eenming
, 260 G arry Hill Road Parsippany, New Jersey 07054 Pennsylvania Electric Company
.Yieo President, Technical 1001 Broad Street.
Johnstown, Pennsylvania 15907
- 2 Gerald Charnoff
~.
Shaw, Pittama, Potts. Trowbridge 5 Madden 910 17th Street, N.E Washington, D.C.
20006 d."'
,.c
. - g m.
-,s a,.,.. -+ :.,v
<.,+,,
s
' =
.q..*,.?
e 1
f.
.,- ~1 2,
+
.s '
3
..'N-l
-i.
..s,
+.
.. ~x
.m
o m
s w '
3 OF71CI >
SUIMIA4E >
DATI k Fons AEC-5ts (Rev.9-13) AECM 0240
- u s covenhuant P*Niin.a orect. t e71 -4 t o 4e s
.. - -.15C5 '018
~.
1
.