ML19291B518
| ML19291B518 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 04/19/1972 |
| From: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | John Miller METROPOLITAN EDISON CO. |
| Shared Package | |
| ML19291B519 | List: |
| References | |
| NUDOCS 7911080532 | |
| Download: ML19291B518 (1) | |
Text
.. _._.
s l,
i.'
77 p r,,,,,,
ATOMIC ENZRGY COMMISSION UNITED STATES f~
T*
~ '
DIVISION OF COMPLIANCE 201 645. 3942 I
REGION I
'[
D,
['
970 DROAD STREET
- l 4
5 NEWARK. NEW JEnSEY 07102 S'
i
.i J
APR 191972 Metropolitan e.dison Company pocket No. 50-289 i
Attention:
Mr. J. G. Miller
- j Vice President l
P.,0. Box 542 l
Reading, Pennsylvania 19603 P
Gentlemen:
l This refers to the inspection conducted by Mr. A. A. Varela of c
this office on March 23 and 24, 1972 of construction activities authorized by AEC Construction Permit No. CPPR-40 and to the dis-l cussions of our findings held by Mr. Varela with Messrs. Strom-berg and Wright of your staff at the conclusion of the inspection.
J
.Areas examined during the inspection included construction records and repair work of the concrete voids in the North 1800 portion of Q
thecontainmentbuildingringgirder,andexaminationofconcrete g
voids in part of the South 180 po-tion of the ring girder. With-in these areas, the inspection c' nsisted of selective examinations o
of procedures and representative records, interviews with plant personnel, and observations by our inspector.
No items of noticonformance were identified during this inspection.
No reply to this letter is necessary; however, should you have any questions concerning this inspection, we will be pleased to discuss them with you.