ML19291B151

From kanterella
Jump to navigation Jump to search
Forwards LER 79-062/03L-0
Date released: 11/01/2019 Download: ML19291B151


LER 79-062/03L-0 on 790726:while Performing Reactor Low Level Calibr & Functional Test,Instruments 2B21-LIS-N031 C & D Were Out of Calibr.Caused by Instrument Drift.All Switches Recalibr
ML19291B164
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 08/24/1979
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19291B164 (2)
Forwards LER 79-062/03L-0
ML19291B150
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 08/24/1979
From: Banks H
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19291B150 (1)