Forwards IE Insp Repts 50-369/80-31 & 50-370/80-17 on 801020-22.No Noncompliance Noted
ML19290G702
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 11/14/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19290G701 List:
References
NUDOCS 8012180399
Download: ML19290G702 (2)


See also: IR 05000369/1980031

Text

.

--

--

-

t

'o

UNITED STATES

+

4

8'

T,

NUCLEAR REGULATORY COMMISSION

{ g *gf 7,

s

gE

REGION 11

o, g p

101 MARlETT A sT., N.W., SUITE 3100

V

p

ATLANT A, GEORGI A 30303

In Reply Refer To:

RII:VPA

50-369/80-31

50-370/80-17

Duke Power Company

ATTN:

W. O. Parker, J r.

Vice President, Steam Production

P. O. Box 2178

Charlotte, NC 28242

Gentlemen:

This refers to the inspection conducted by

W. P. Ang of this office on

October 20-22, 1980, of activities authorized by NRC Construction Permit Nos.

CPPR-83 and CPPR-84 for the McGuire facility, and to the discussion of our

findings held with J. C. Rogers at the conclusion of the inspection.

Areas examined during the inspection and our findings are discursed in the

enclosed inspection report.

Within taese areas, the inspection consisted of

selective examinations of procedures and represt.ntative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified

enforcenent matters and unresolved items. The status of these items are discussed

in the enclosed report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

7f this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written anplication within '!0 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the docunent. If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

C. E. Murph ,

Reactor Construction and Engineering

Support Branch

Enc

ibb (See Page 2)

ure-

6U

3Pg

.

.

.

Duke Power Company

-2-

s

.

Enclosure:

Inspection Report Nos. 50-369/80-31

and 50-370/80 '7

cc w/ encl:

M. D. McIntosh, Plant Manager

J. C. Rogers, Project Manager

.