ML19290G679

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-302/80-34 on 800916-19.No Noncompliance Noted
ML19290G679
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/10/1980
From: Stohr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hancock J
FLORIDA POWER CORP.
Shared Package
ML19290G680 List:
References
NUDOCS 8012180302
Download: ML19290G679 (2)


See also: IR 05000302/1980034

Text

fl0

a

!garc

.

.<

O

o

UNITED STATE S

g

7,

l s g f %

NUCLEAR REGULATORY COMMISSION

M

/k E

{

M

REGION 11

o,,

f

101 M AM ETTA sT., N.W.. s'JIT E 3100

.T5

mn

,

'

j'

AT LANTA. G EoRGI A 30303

.....

_gg

g.

7

In Reply Refer To:

NOV 101980

g

]?

c

RII: E

g

,s

(

2/80-34 ;

o

---

Florida Power Corporation

ATTN:

J. A. Hancock, Director

Nuclear Operations

P. O. Box 14042, Mail Stop C-4

St. Petersburg, FL 33733

Gentlemen:

This refers to the inspection conducted by A. L. Cunningham of this office on

September 16 through 19, 1980 of activities authorized by NRC Operating License

No. DPR-72 for the Crystal River facility, and to the discussion of our findings

held with D. C. Poole at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietery, and should be prepared so that proprietary infor-

ration identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

^

.

J

-

J. Philip

ohr, Chief

Fuel Facility and Materials

Safety Branch

Enclosures:

(See Page 2)

&

001218030g

a

.

Florida Power Corporation

-2-

N OV 1 0 1930

Enclosure:

Inspection Report

No. 50-302/80-34

cc w/ enc 1:

D. C. Poole, Nuclear Plant Manager