Forwards IE Insp Repts 50-424/80-15 & 50-425/80-15 on 800929-1001.No Noncompliance Noted
ML19290G676
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 10/28/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19290G677 List:
References
NUDOCS 8012180284
Download: ML19290G676 (2)


See also: IR 05000424/1980015

Text

[p* %qjo,

UNITED STATES

,

- Q,_

/

g

y

3,,f( j

NUCLEAR REGULATORY COMMISSION

3

7/

r

REGION 11

-s

f

101 MARIETT A sT.. N W.. sulT E 3100

f ',

W

o,,

(

%%...-[

0CT 2 81880

ATLANTA GEORGIA 30303

'

In Reply Refer To:

I

{

,

RII:MDH

3

.

-

f 50-424/80-15 N

,A

ro

"

(50-425/80-15.

^

Georgia Power Company

ATTN:

J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street

Atlanta, GA 30303

Gentlemen:

This refers to th inspection conducted by M. D. Hunt of this office on September 29

through October 1, 1980 of activities authorized by NRC Construction Permit Nos.

CPPR-108 and CPPR-109 for the Plant Vogtle facility, and to the discussion of our

findings held with D. M. Fiquett at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disc 1cied.

In accordance with Section 2.790 af the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed thdt

the information is proprietary, and should be prepared so that proprietary infor-

mation identified in the application is contained in a separate part of the

occument. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

'

,

C. E. Murphy, hief

Reactor Construction and Engineering

Support Branch

Enclosure:

See Page 2

'

8O;93

-

,, i

1 ~

.

0CT 2 81980

Georgia Power Company

-2-

Enclosure:

Inspection Report Nos. 50-424/80-15

and 50-425/80-15

cc w/ encl:

K. M. Gillespie, Construction

Project Manager

E. D. Groover, QA Site Supervisor

D. E. Dutton, Project General Manager