[p* %qjo,
UNITED STATES
,
- Q,_
/
g
y
3,,f( j
NUCLEAR REGULATORY COMMISSION
3
7/
r
REGION 11
-s
f
101 MARIETT A sT.. N W.. sulT E 3100
f ',
W
o,,
(
%%...-[
0CT 2 81880
ATLANTA GEORGIA 30303
'
In Reply Refer To:
I
- {
,
RII:MDH
3
.
-
f 50-424/80-15 N
,A
ro
"
(50-425/80-15.
^
Georgia Power Company
ATTN:
J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street
Atlanta, GA 30303
Gentlemen:
This refers to th inspection conducted by M. D. Hunt of this office on September 29
through October 1, 1980 of activities authorized by NRC Construction Permit Nos.
CPPR-108 and CPPR-109 for the Plant Vogtle facility, and to the discussion of our
findings held with D. M. Fiquett at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disc 1cied.
In accordance with Section 2.790 af the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed thdt
the information is proprietary, and should be prepared so that proprietary infor-
mation identified in the application is contained in a separate part of the
occument. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
'
,
C. E. Murphy, hief
Reactor Construction and Engineering
Support Branch
Enclosure:
See Page 2
'
8O;93
-
,, i
1 ~
.
0CT 2 81980
Georgia Power Company
-2-
Enclosure:
Inspection Report Nos. 50-424/80-15
and 50-425/80-15
cc w/ encl:
K. M. Gillespie, Construction
Project Manager
E. D. Groover, QA Site Supervisor
D. E. Dutton, Project General Manager