ML19290E783

From kanterella
Jump to navigation Jump to search
Submits Info Re Advance Route approval.NUREG-0561,App 2-A Used as Quide
ML19290E783
Person / Time
Site: Oyster Creek
Issue date: 09/21/1979
From: Carroll J
GENERAL PUBLIC UTILITIES CORP., JERSEY CENTRAL POWER & LIGHT CO.
To:
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
FOIA-80-544, RTR-NUREG-0561, RTR-NUREG-561 14270, NUDOCS 8003170023
Download: ML19290E783 (1)


Text

\\

j l

g

-, -Q y

3:M OYSTER CREEK

]

NUCLEA GEN TING STATION ase:My w

\\\\, \\ f Y

'o< O go-A/9 p

].. <,{;. h (609) q9g951 P X

,88 e FORKED RIVER + NEW JERSEY

  • 08731

^

/

v ember 21,1979 j

^

=_=_

A c

i s

Director, Office of Nuclear R

F.:

Materials Safety and Safeguards j '.

U.S. Nuclear Regulatory Commission a

Washington, D.C.

20555 a

Dear Sir:

Subject:

Advance Route Aporoval - 10 CFR 73 Section 73.37(aM1)

In order to comply with the requirements of 10 CFR 73, the following infor-mation is herein submitted for your review and approval. NUREG-0561 Appendix 2-A is used as a guide.

argo Description

'(a[ Fifteen irradiated BWR fuel rods (seven unfailed ano eight failed).

p DOCKETED USN.tc

'(1) The fuel rods are approximately 157 inches long (144-inch k-fuel stack length) with an 0.D. of 0.563 inches.

Eieven of OCT 01979 >

the fifteen rods contain urania-gadolinia (U02 - Gd 0 ) and 3

23

^WL 5% ION the remainder are urania (UO ) rods. The burnup histories f

2 ROCKET CLERK,.

for each of the rods indicate end of life exposure from approximately i8 to 25 GWD/MTV.

,y c,

(b) Cask NAC-1 USA /6698/B()F (pending USNRC approval for retur~ to l

service).

i l

(c) Loaded weight of trailer - 98,000 pounds (Gross weight of NAC cask is 50,000 pounds).

II Anticipated Schedule (a) Number of shipments: one.

(b) Approximate duration of complete transfer; 551 miles at 35 mph =

16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br />.

(c) Proposed beginning and end da? s; Estimate beoin October 15, 1979

/

and end October 16, 1979.

Shipping cates depend on cask license f'

approval and availability.

(d) Carrier; Tri-State Motor Transit Company, Joplin, M0.

14% 70 80031700 3 3