Forwards EPIP-11, Estimating Release from Radiation Monitoring Sys Data, & HP-3.3.2, Health Physics Survey - Air Sampling, in Response to NRC 800205 Request Re Lessons Learned Task Force short-term Requirements
ML19290D915
Person / Time
Site: North Anna Dominion icon.png
Issue date: 02/27/1980
From: Stallings C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML19290D916 List:
References
RTR-NUREG-0578, RTR-NUREG-578 015A, 15A, NUDOCS 8002290380
Download: ML19290D915 (1)


Text

Vi no r NI A 8 LECTRIC AN D POWEH CO)U%NY lticuxoxo.vano1x1A unum February 27, 1980 Mr. Harold R. Denton, Director Serial No. 015A Office of Nuclear Reactor Agalation P0/DLB:scj U. S. Nuclear Regulatory Commission Docket No. % -339 Washington, D. C.

20555

Dear Mr. Denton:

Lessons Iaarned Short Term Requirements North Anna Power Station Unit No. 2 The following information, regarding the implementation of the Short Term Lessons Learned requirements on North Anna Unit 2, is provided in response to a telephone request from your staff received on February 25, 1980.

Items are numbered as in NUREG 0578.

Section 2.1.8.b.

Increased Range of Radiation Monitors In our submittal of January 10,1980 (Serial No. 015) we stated that a procedure for the interim quantification of high level releases would be corapleted by January 31, 1980. The procedure, EPIP-11 Estimating Release from Radiation Monitoring System Data, is attached.

Section 2.1.8.c.

Improved In-Plant Iodine Instcumentation Under Accident Conditions In our submittal of January 10, 1980, we stated that a procedure for the use of silver zeolite cartridges had been prepared.

The procedure, HP-3.3. 2, Health Physics Survey - Air Sampling, is attached.

Reviews of shielding and existing laboratory facilities indicate that the existing facilities may not be fully available under certain accident condi-tions.

However, should the need arise, samples could be transported to our Surry Power Station for analysis.

As required by your clarification letter of October 31, 1979, we will provide, by January 1,1981, the capability to remove the sampling cartridge to a low background, low contamination area for further analysis.

Very truly yours, m

=a

,?{.

  • O w

C. M. Stallings Vice President-Power Supply and Production Operations s o 0 2 2 9038o f

.