pn nrag,'o, UNITED STATES f
E\\
' 7, NUCLEAR REGULATORY COMMISSION j, k 3,., c ; $
REGION 111'
~/
Di I
799 ROOSEVELT ROAD o
%'..s c
,e
GLEN ELLYN. lLLINOIS 60137 ND; MEMORANDUM F0!h Th'ose on Attached List FROM:
Helen Pappas, Chief, Administrative Branch
SUBJECT:
IE INFORMATION NOTICE NO. 79-28 The attached IE Information Notice No. 79-28 titled " Overloading of Structural Elements Due To Pipe Support Loads" was sent to the following licensees on November 16, 1979:
American Electric Power Service Corporation Indiana and Michigan Power Company D. C. Cook 1, 2 (50-315, 50-316)
Cincinnati Gas & Electric Company Zimmer (50-358)
Cleveland Electric Illuminating Company Perry 1, 2 (50-440, 50-441)
Commonwealth Edison Company Braidwood 1, 2 (50-456, 50-457)
Byron 1, 2 (50-454, 50-455)
Dresden 1, 2, 3 (50-10, 50-237, 50-249)
La Salle 1, 2 (50-373, 50-374)
Quad-Cities 1, 2 (50-254, 50-265)
Zion 1, 2 (50-295, 50-304)
Consumers Power Company Big Rock Point (50-155)
Midland 1, 2 (50-329, 50-330)
Palisades (50-255)
Dairyland Power Cooperative LACBWR (50-409)
Detroit Edison Company Fermi 2 (50-341)
Illinois Power Company Clinton 1, 2 (50-461, 50-462) 1727 001 8001100/Y2.
Those on Attached List @) 1 -
Iowa Electric Light & Power Company Duane Arnold (50-331)
~
Northern Indiana Public Service Company Bailly (50-367)
Northern States Power Company Monticello (50-263)
Prairie Island 1, 2 (50-282, 50-306)
Ohio Edison Company Erie 1, 2 (50-580, 50-581)
Public Service of Indiana Marble Hill 1, 2 (50-546, 50-547)
Toledo Edison Company Davis-Besse 1 (50-3'+6)
Union Electric Company Callaway 1, 2 (50-483, 50-486)
Wisconsin Electric Power Company Point Beach 1, 2 (50-266,e50-301)
Wisconsin Public Service Corporation Kewaunee (50-305) idLl L
c, H61en Pap as, Chief Administrative Branch
Attachment:
IE Information Notice No. 79-28 1727 002
(% ctA N
.m Addressees - Memorandum dated November 19, 1979 IE Files MPA/DTS s
Central Files Reproduction Unit NRC 20b 1727 003
s SSINS No.:
6870 Accession No.- 791025 FC UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT D
MSo WASHINGTON, D.C.
20555 gb g
November 16, 1979 IE Information Notice No. 79-28 OVERLOADING 0F STRUCTURAL ELEMENTS DUE TO PIPE SUPPORT LOADS Description of Circumstances:
Recently, the NRC was informed that, in the course of the inspections pursuant to IE Bulletin No. 79-02 and 79-14 by the Portland Generi. Ekctric Co. (PGE) at the Trojan Nuclear Plant, some walls were found which did not have adequate structural strength to sustain the required support reactions.
Bechtel Corporation was the Architect Engineer for the plant.
These structural inadequacies were reported to be attributable to two deficiencies:
1)
Apparent lack of a final check of certain pipe support locations and reactions to ensure that the supporting structural elements possessed adequate structural integrity to sustain the required loads.
2)
Inadequate design criteria for the reactions from supports anchored into the face of concrete block walls; e.g., relying on the combined strength of double concrete block walls without positive connection between the two walls by means other than the bond provided by a layer of grout between them.
The NRC is currently pursuing these issues in detail for tM Trojan Nuclear Plant to determine the extent of these deficiencies and the generic implications for other Bechtel facilities.
This Information Notice is provided as an early notification of a possible signif-icant matter.
It is expected that recipients will review the information for possible applicability to their facilities and the actions being performed under IE Bulletin No. 79-02.
Specific action is being requested relating to the adequacy of attachments to concrete block walls under IE Bulletin No. 79-02, Revision 2, item 5.c.
No specific actions are requested i-esponse to this Information Notice.
If NRC evaluations so indicate, further licen.ee actions may be requested or required.
If you have any questions regarding this matter, please contact the Director of the appropriate NRC Regional Office.
No written response to this IE Information Notice is required.
Enclosure:
Recently Issued IE Information Notices 1727 004
IE Information Notice No. 79-28 Enclosure November 16, 1979 RECENTLY ISSUED IE INFORMATION NOTICES Information Subject Date Issued To Notice No.
Issued 79-27 Steam Generator Tube 11/16/79 All power reactor facilities Ruptures At Two PWR holding OLs and cps Facilities79-12A Attempted Damage To New 11/9/79 All Fuel Facilities, Fuel Assemblies research reactors, and power reactors with an OL or CP 79-26 Breach of Containment 11/5/79 All power reactor facilities Integrity holding OLs and cps 79-25 Reactor Trips At Turkey 10/1/79 All power facilities with Point Units 3 And 4 an OL or a CP 79-24 Overpressurization Of 10/1/79 All power reactor facilities Containment Of A PWR Plant with a CP After A Main Steam Line Break 79-23 Emergency Diesel Generator 9/26/79 All power reactor Lube Oil Coolers facilities holding OLs and cps 79-22 Qualification of Control 9/14/79 All power reactor Systems facilities with operating licenses and construction permits.
79-21 Transportation and Commercial 9/7/79 All power and research Burial of Radioactive Material reactors with OL's 79-20 NRC Enforcement Policy 9/7/79 All Holders of Reactor (Rev. 1)
NRC Licensed Individuals OLs and cps and Production Licensees with Licensed Operators 79-20 NRC Enforcement Policy 8/14/79 All Holders of Reactor NRC Licensed Individuals OLs and cps and Production Licensees with Licensed Operators 1727 005